for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications
ML15328A523
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/24/2015
From: Cortopassi L
Omaha Public Power District
To: Vincent Gaddy
Document Control Desk, NRC Region 4
References
LIC-15-0127
Download: ML15328A523 (1)


Text

Omaha Public Power District PERSONAL PRIVACY INFORMATION NOT FOR PUBLIC DISCLOSURE 10 CFR 55 November 24, 2015 LIC-15-0127 Mr. Vincent Gaddy Chief, Operations Branch, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Reference:

1. NUREG 1021, ES 202 C.1.e, "Operator Licensing Examination Standards for Power Reactors"
2. Letter from OPPD (L. Cortopassi) to NRC (V. Gaddy) dated November 5, 2016 (LIC-15-0126)

SUBJECT:

Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications As required by the reference 1, the Omaha Public Power District (OPPD) is providing the final Form NRC-398, "Personal Qualification Statement," for the candidates participating in the December 10, 2015, Reactor Operator/Senior Reactor Operator (RO/SRO) license exams at Fort Calhoun Station (FCS). These applications are for three (3) RO candidates, two (2) SRO upgrade candidates and four (4) direct SRO candidates.

Due to the confidential nature, the enclosures will only be provided for the copy being sent to the Operations Section Branch Chief in Region IV.

e:ff If you require additional information, please contact Bradley Blome, Manager, Site Regulatory Assurance, at (402) 533 7270. No commitments are made in this letter.

R Louis P. Cortopassi Site Vice President and CNO Enclosures LPC/epm c: M. L. Dapas, NRC Regional Administrator, Region IV (w/o Enclosures)

C. F. Lyon, NRC Senior Project Manager (w/o Enclosures)

S. M. Schneider, NRC Senior Resident Inspector (w/o Enclosures)

Document Control Desk (w/o Enclosures) 444 SOUTH 16TH STREET MALL

  • OMAHA, NE 68102-2247

Omaha Public Power District PERSONAL PRIVACY INFORMATION NOT FOR PUBLIC DISCLOSURE 10 CFR 55 November 24, 2015 LIC-15-0127 Mr. Vincent Gaddy Chief, Operations Branch, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Reference:

1. NUREG 1021, ES 202 C.1.e, "Operator Licensing Examination Standards for Power Reactors"
2. Letter from OPPD (L. Cortopassi) to NRC (V. Gaddy) dated November 5, 2016 (LIC-15-0126)

SUBJECT:

Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications As required by the reference 1, the Omaha Public Power District (OPPD) is providing the final Form NRC-398, "Personal Qualification Statement," for the candidates participating in the December 10, 2015, Reactor Operator/Senior Reactor Operator (RO/SRO) license exams at Fort Calhoun Station (FCS). These applications are for three (3) RO candidates, two (2) SRO upgrade candidates and four (4) direct SRO candidates.

Due to the confidential nature, the enclosures will only be provided for the copy being sent to the Operations Section Branch Chief in Region IV.

e:ff If you require additional information, please contact Bradley Blome, Manager, Site Regulatory Assurance, at (402) 533 7270. No commitments are made in this letter.

R Louis P. Cortopassi Site Vice President and CNO Enclosures LPC/epm c: M. L. Dapas, NRC Regional Administrator, Region IV (w/o Enclosures)

C. F. Lyon, NRC Senior Project Manager (w/o Enclosures)

S. M. Schneider, NRC Senior Resident Inspector (w/o Enclosures)

Document Control Desk (w/o Enclosures) 444 SOUTH 16TH STREET MALL

  • OMAHA, NE 68102-2247