L-22-026, Occupational Radiation Exposure Data Report - 2021

From kanterella
Jump to navigation Jump to search
Occupational Radiation Exposure Data Report - 2021
ML22119A089
Person / Time
Site: Indian Point, Oyster Creek, Pilgrim
Issue date: 04/29/2022
From: Fleming J
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Regulatory Research
References
HDI-IPEC-22-038, HDI-OC-22-025, HDI-PIL-22-026
Download: ML22119A089 (1)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 10 CFR 20.2206 April 29, 2022 REIRS Project Manager Office of Nuclear Regulatory Research U. S. Nuclear Regulatory Commission Mail Stop: CSB-3A07M Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Pilgrim Nuclear Power Station Renewed Facility Operating License No. DPR-35 NRC Docket No. 50-293 Indian Point Nuclear Generating Stations 1, 2, & 3 Provisional Operating License No. DPR-5 Renewed Facility Operating License Nos. DPR-26 and DPR-64 NRC Docket Nos. 50-3, 50-247, and 50-286

Subject:

Occupational Radiation Exposure Data Report - 2021 In accordance with Title 10 of the Code of Federal Regulations (CFR) 20.2206, Holtec Decommissioning International, LLC (HDI) hereby reports to the NRC that the Annual Occupational Radiation Exposure Data Reports for calendar year 2021 for Oyster Creek, Pilgrim and Indian Point Units 1, 2, & 3 were submitted electronically to the NRC.

This letter contains no new commitments.

If any further information or assistance is needed, please contact me at (856)-797-0900, x3578.

Sincerely, Jean A. Digitally signed by Jean A. Fleming Fleming Date: 2022.04.29 09:21:06 -04'00' Jean A. Fleming Vice President, Licensing, Regulatory Affairs, & PSA Corporate Engineering Division Holtec International, LLC HDI-OC-22-025 HDI-PIL-22-026 HDI-IPEC-22-038