L-19-150, Supplemental Information Regarding License Amendment Request for Permanently Defueled License and Technical Specifications

From kanterella
Jump to navigation Jump to search

Supplemental Information Regarding License Amendment Request for Permanently Defueled License and Technical Specifications
ML19136A240
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/16/2019
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPID L-2019-LLA-0012, L-19-150
Download: ML19136A240 (2)


Text

FENO C Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax:419-321-7582 10 CFR 50.90 May 16, 2019 L-19-150 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Supplemental Information Regarding License Amendment Request for Permanently Defueled License and Technical Specifications (EPID L-2019-LLA-0012)

By letter dated February 5, 2019 (ADAMS Accession No. ML19036A523), FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request (LAR) to change the Davis-Besse Nuclear Power Station (DBNPS), Unit No. 1 renewed operating license and technical specifications for the permanent cessation of reactor operation and permanent defueling of the reactor.

After further consideration, FENOC has determined that the proposed deletions to the following license conditions are not required and are hereby removed from proposed changes to the LAR:

  • 2.C(6) and 2.E (Antitrust Conditions)
  • 3 (December 16, 2005 License Transfer Conditions)

The information provided by this submittal does not invalidate the no significant hazards consideration analysis provided in the February 5, 2019 letter.

There are no regulatory commitments included in this submittal. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Nuclear Licensing and Regulatory Affairs, at (330) 315-6810.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May .J..la_, 2019.