IR 05000498/2022404

From kanterella
Jump to navigation Jump to search
Operating Company NRC Security Inspection Report 05000498/2022404, 05000499/2022404 (Cover Letter)
ML22243A232
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/31/2022
From: Ray Kellar
NRC/RGN-IV/DRSS/PSB
To: Gerry Powell
South Texas
Kellar R
References
IR 2022404
Download: ML22243A232 (3)


Text

August 18, 2022

SUBJECT:

SOUTH TEXAS PROJECT - SECURITY BASELINE INSPECTION REPORT 05000498/2022404 AND 05000499/2022404

Dear Mr. Powell:

On June 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project. After additional in-office inspection and discussions with your staff the results of the security baseline inspections were discussed with you and other members of your staff on July 28, 2022. The results of these inspections are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

Licensee-identified violations which were determined to be of very low security significance are documented in this report. We are treating these violations as NCVs consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at South Texas Project.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [P.2] - Evaluation.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at South Texas Project.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Signed by Kellar, Ray on 08/18/22 Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000498, 05000499 License Nos. NPF-76, NPF-80 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV ML22222A062 (Cover letter w/ enclosure(s))

Non-Public Designation Category: MD 3.4 Non-Public (A.3 - A.7 or B.1)

ADAMS ACCESSION NUMBER: ML22243A232(Cover letter)

Entire Report: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter Only: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE PSB-SPSI PSB-PSI PSB-SPSI DORS-STP DORS-A PSB-C NAME DHolman JBuchanan JRollins GKolcum RDeese RKellar DATE 8/10/2022 8/10/2022 8/10/2022 8/16/2022 8/10/2022 8/18/2022