Updated Inspection Plan (Reports 05000498/2017005 and 05000499/2017005)
ML17242A182
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/28/2017
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Gerry Powell
South Texas
NICK TAYLOR
References
IR 2017005
Download: ML17242A182 (5)


Text

ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNITS 1 AND 2 (REPORTS 05000498/2017005 AND 05000499/2017005)

Dear Mr. Powell:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for South Texas Project Electric Generating Station Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at South Texas Project Electric Generating Station Units 1 and 2 to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,

/RA D. Proulx for/

Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Enclosure:

South Texas Project Electric Generating Station Inspection Plan

ML17242A182 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA/DProulx for DATE 8/28/17 8/28/17

Page 1 of 2 South Texas Project 08/25/2017 08:24:16 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL EXAM 4 1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017)

2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017)

1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017)

2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017)

RS 24 - RADIATION SAFETY 2 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment TI-191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1, 2 10/23/2017 10/27/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 BRQ - BRQ INSPECTION 2 1, 2 10/16/2017 10/20/2017 IP 7111111B Licensed Operator Requalification Program RS 12PI - RAD SAFETY 2 1, 2 03/26/2018 03/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/26/2018 03/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/26/2018 03/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 03/26/2018 03/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111108 - INSERVICE INSPECTION UNIT 2 1 2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR EXAM - INITIAL EXAM 4 1 09/17/2018 09/21/2018 X02626 INITIAL EXAM STP U1(11/18)

2 09/17/2018 09/21/2018 X02627 INITIAL EXAM STP U2(11/2018)

1 10/22/2018 11/01/2018 X02626 INITIAL EXAM STP U1(11/18)

2 10/22/2018 11/01/2018 X02627 INITIAL EXAM STP U2(11/2018)

EB1-07T - STP HEAT SINK PERFORMANCE 2 1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance EP-1 - EP EXERCISE INSPECTION 5 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance 1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness 1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 South Texas Project 08/25/2017 08:24:16 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RAD SAFETY 4 1, 2 07/23/2018 07/27/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 07/23/2018 07/27/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/23/2018 07/27/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/23/2018 07/27/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation PI&R - BIENNIAL PI&R INSPECTION 4 1, 2 08/06/2018 08/10/2018 IP 71152B Problem Identification and Resolution 1, 2 08/20/2018 08/24/2018 IP 71152B Problem Identification and Resolution 7111108 - INSERVICE INSPECTION UNIT 1 1 1 10/15/2018 10/26/2018 IP 7111108P Inservice Inspection Activities - PWR RS 24 - RP INSPECTION 2 1, 2 01/28/2019 02/01/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 01/28/2019 02/01/2019 IP 71124.04 Occupational Dose Assessment EB1-21M - SOUTH TEXAS DBA TEAM INSPECTION 6 1, 2 03/25/2019 04/12/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.