IR 05000483/2015404, on 09/29/2015, Callaway Plant - NRC Inspection Report
ML15299A065
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/23/2015
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015404
Download: ML15299A065 (4)


Text

UNITED STATES ber 23, 2015

SUBJECT:

CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015404

Dear Mr. Diya:

On September 29, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant. The NRC inspector discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff.

The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspector documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a noncited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspectors at the Callaway Plant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Branch Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Nonpublic Enclosure:

NRC Inspection Report 05000483/2015404 w/Attachment: Supplemental Information cc w/encl:

Mr. Eric Olson Manager, Security Callaway Nuclear Plant P.O. Office Box 620 Fulton, MO 65251 cc w/o encl:

Electronic Distribution for Callaway Plant ML15299A065 Entire Report: Non-Sensitive Publicly Available Keyword: NRC-002 SUNSI Review: D. Holman Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 Cover Letter Only: Non-Sensitive Publicly Available Keyword: RGN-002 SUNSI Review :D. Holman Sensitive Non-Publicly Available SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 C:PBB C:PSB1 NAME DHolman MHaire NTaylor MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 10/22/15 10/22/15 10/23/15 10/23/15 Letter to Fadi Diya from Mark S. Haire, dated October 23, 2015 SUBJECT: CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015404 Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Distribution w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)