IR 05000483/2013502

From kanterella
Jump to navigation Jump to search
NRC Emergency Preparedness Annual Inspection Report 05000483/2013502
ML14198A617
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/17/2014
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR-13-502
Download: ML14198A617 (2)


Text

uly 17, 2014

SUBJECT:

CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2013502

Dear Mr. Diya:

On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000483/2013502. The inspection results associated with the 2013-502 reports are documented in Integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-483 License: NPF-30 Electronic Distribution to Callaway Plant

July 17, 2014 Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2013502

Dear Mr. Diya:

On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000483/2013502. The inspection results associated with the 2013-502 reports are documented in Integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-483 License: NPF-30 Electronic Distribution to Callaway Plant Distribution:

M. Haire P. Elkmann L. Williams DOCUMENT NAME: R:\_REACTORS\_CAL\CAL2013502-LTR-pje.docx ML14198A617 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: MHaire Yes No Non-Publicly Available Sensitive RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/

DATE 7/17/14 OFFICIAL RECORD COPY