Updated Inspection Plan for River Bend Station, Report 05000458/2019005
ML19234A233
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/30/2019
From: Cale Young
NRC/RGN-IV/DRP/RPB-C
To: Vercelli S
Entergy Operations
References
IR 2019005
Download: ML19234A233 (6)


Text

ust 30, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR RIVER BEND STATION, REPORT 05000458/2019005

Dear Mr. Vercelli:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for River Bend Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No. ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet that included River Bend Station. The Confirmatory Order was associated with nonlicensed operators deliberately failing to tour all required areas and deliberately entering inaccurate information into the operating logs. On April 19, 2019, the NRC issued River Bend Station two Severity Level III violations for similar occurrences (ADAMS Accession No. ML19112A197). The NRC plans to conduct a Confirmatory Order follow-up inspection at Entergy Corporate Headquarters in Jackson, MS, of the actions required to be completed by the end of calendar year 2019, in accordance with Inspection Procedure 92702, Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. This inspection will be conducted during the first quarter of 2020 on a date to be determined by the NRC and Entergy. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1250 with any questions you have regarding this letter.

Sincerely,

/RA/

Cale H. Young, Acting Chief Project Branch C Division of Reactor Projects Docket No. 50-458 License No. NPF-47 Enclosure:

Inspection Plan

ML19234A233 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: DLP Yes No Publicly Available Sensitive NRC002 OFFICE PBC:SPE PBC:C NAME DProulx CYoung SIGNATURE /RA/ /RA/

DATE 08/22/19 08/30/19

IP 22 Inspection Activity Plan Report River Bend 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count RBS RI 4TH QUARTERLY REPORT 2 1 09/01/2018 12/31/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 09/01/2018 12/31/2019 IP 92702 000238 Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders RP TEAM INSPECTION 4 1 06/23/2019 07/12/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 06/23/2019 07/12/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 06/23/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 06/23/2019 07/12/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RIVER BEND DBA PROGRAMS EQ INSPECTION 3 1 07/14/2019 08/01/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP PROGRAM INSPECTION 1 1 07/22/2019 07/26/2019 IP 71114.02 000717 Alert and Notification System Testing 1 07/22/2019 07/26/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 07/22/2019 07/26/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 07/22/2019 07/26/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 07/22/2019 07/26/2019 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISES 6 1 10/07/2019 10/11/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 10/28/2019 11/01/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Fire Protection Inspection - RBS 4 1 10/20/2019 10/26/2019 IP 71111.05T 000696 Fire Protection 1 11/03/2019 11/09/2019 IP 71111.05T 000696 Fire Protection RBS 2019 INITIAL EXAM 5 1 10/20/2019 10/26/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 11/17/2019 11/30/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

8/23/2019 9:54:41 AM

IP 22 Inspection Activity Plan Report River Bend 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count RS24 Radiation Safety 2 1 02/10/2020 02/14/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 02/10/2020 02/14/2020 IP 71124.04 000728 Occupational Dose Assessment Security Protective Strategy .05 with Exercise 2 1 04/13/2020 04/17/2020 IP 71130.05 000737 Protective Strategy Evaluation Security Equipment .04 and Training .07 2 1 05/11/2020 05/15/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 05/11/2020 05/15/2020 IP 71130.07 000739 Security Training RS13PI Radiation Safety 2 1 05/18/2020 05/22/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 05/18/2020 05/22/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation EP Exercise and PI Inspection 4 1 06/22/2020 06/26/2020 IP 71114.01 000716 Exercise Evaluation 1 06/22/2020 06/26/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 06/22/2020 06/26/2020 IP 71151 001397 Performance Indicator Verification River Bend 1 - Design Bases Assurance Inspection (Teams) 6 1 07/13/2020 07/31/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Security Access Control .02 1 1 07/20/2020 07/24/2020 IP 71130.02 000734 Access Control 1 07/20/2020 07/24/2020 IP 71151 001338 Performance Indicator Verification RBS 2020 BRQ 2 1 08/30/2020 09/05/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RBS 2021 INITIAL EXAM 6 1 01/03/2021 01/09/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 02/07/2021 02/13/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

1 02/07/2021 02/20/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

50.59 Inspection 17T - River Bend 3 1 01/25/2021 01/29/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

8/23/2019 9:54:41 AM

IP 22 Inspection Activity Plan Report River Bend 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count Inservice Inspection RF21 - RBS 1 1 02/15/2021 02/19/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,2,PI 2 1 02/22/2021 02/26/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 02/22/2021 02/26/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls EP Program Inspection 1 1 06/28/2021 07/02/2021 IP 71114.02 000717 Alert and Notification System Testing This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

8/23/2019 9:54:41 AM