UNITED STATES uary 6, 2016

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2015501 AND 05000446/2015501

Dear Mr. Flores:

On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000445/2015501 and 05000446/2015501. The inspection results associated with the 2015-501 reports are documented in Integrated Resident Inspection Reports 2015-001, 2015-002, 2015-003, and 2015-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 cc: Electronic Distribution

ML16007A738 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/

DATE 12/14/15 1/6/16

Letter to Rafael Flores from Mark S. Haire, dated January 6, 2016 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2015501 AND 05000446/2015501 DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Josey@nrc.gov)

Resident Inspector (Rayomand.Kumana@nrc.gov)

Administrative Assistant (Rhonda.Smith@nrc.gov)

Incoming Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Acting Branch Chief, DRP/A (Rich.Smith@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)