Partially Withheld Insp Repts 50-445/93-09 & 50-446/93-09 on 930118.Details Withheld Per 10CFR73.21.Major Areas Inspected:Unit 2 Physical Security Program,Including Records & Repts,Emergency Power Supply & Lock & Key Control
ML20128E342
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/03/1993
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20128E274 List:
References
50-445-93-09, 50-445-93-9, 50-446-93-09, 50-446-93-9, NUDOCS 9302100384
Download: ML20128E342 (3)


Text

.. . -- . . -- -- --- _ - - . - - . .

. . . . . - - - - -

,

_

o

..

'

DOCUMENT CONTAINS ~

APPENDIX l U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

%.

'

Inspection Report: 50-445/93-09 50-446/93-09 i Operating Licenses: NPF-87

,

,

Construction Permit: CPPR-127

Licensee: TU Electric

' Skyway Tower-

400 North Olive Street, L.B. 81-

- Dallas, Texas 75201

,

Facility Name: Comanche.Penk Steam Electric Station, Units 1 & 2

- Inspection At
Glen Rose,~ Texas i

l Inspection Conducted: January 18, 1993 ,

Inspector: A. B. Earnest, Physical Security Specialist i Facilities Inspection Programs Section

!

Approved: : Ald i M//l d/ b i

Blaine Murray, Chief, Jacyties Inspection Date'

Programs Section Inspection Summar_y Areas Inspected (Unit 11: No inspection of Unit 1 activities was performed.

'

Areas Inspected (Unit 21: Routine, announced preoperational inspection of the licensee's Unit _2 physical security program. _The_ areas inspected within the 4 _ Unit-2 physical security-program included records and reports,_ lock and key

+ control, emergency power-supply, compensatory measures, access control- - .

'

personnel, alarm stations, communications, and safeguards contingency plan-

'

implementation review.

. ENCLOSURE CONTAINS

' .

DOCUMENT CONTAINS UPON SEPARATION THIS- PAGE IS DECONTROLLED.

'

9302100384 930204 PDR

'

-

ADOCK 05000445

,

O FD . ~.,- ... .- -. .. ~ . . . . - . . - .

.--.---.7.-.-

.

.

-2- DOCUMENT CONTAINS SAFEGUARDS IFFORMATION Pesults (Unit 1): Not applicabl _;

Results (Unit 2):- ,

  • - An' excellent records and reports system had been established. Required -

reporting was completed within the correct time . frames (Section 1.2).

.i e A very good lock and key control system had been established i

(Section 2.2).

  • -The test of the emergency power supply indicated that the' system performed _well (Section 3.2).
  • - The compensatory measures program was efficiently implemented. The [

security officers were well trained on the program requirements 3 (Section 4.2).

  • The access control equipment.was adequate to' ensure that personnel and hand-carried packages were adequately searched (Section 5.2).
  • The alarm stations were redundant and well protected, and the operators were alert and well trained (Section 6.2).
  • A good communications system had been established to meet security requirements (Section 7.2).
  • The safeguards' contingency program was effective in ensuring that threats to the security of the plant would be neutralized (Section 8.2).

Attachment:

  • Attachment - Persons Contacted and Exit Meeting i'

,

i ENCLOSURE CONTAINS

! .

. DOCUMENT CONTAINS UPON SEPARATION THIS 1 PAGE IS DECONTROLLED.

, - _ _ . _ _ __ _ _ __ . _ . _ . . . _ . _ _ _ _ . . . _ ._._. _ . __ _