IR 05000440/2018503

From kanterella
Jump to navigation Jump to search
Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000440/2018503 (DRS-G.Hansen)
ML18285A035
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/11/2018
From: Steven Orth
Division of Reactor Safety III
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2018503
Download: ML18285A035 (7)


Text

ber 11, 2018

SUBJECT:

PERRY NUCLEAR POWER PLANTBASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000440/2018503

Dear Mr. Hamilton:

On September 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an Emergency Preparedness inspection at your Perry Nuclear Power Plant. The NRC inspectors discussed the results of this inspection with Mr. F. Payne and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Enclosure:

Inspection Report 05000440/2018503 cc: Distribution via LISTSERV

Letter to David

SUMMARY

The U.S. Nuclear Regulatory Commission continued monitoring licensees performance by conducting an Emergency Preparedness Inspection at the Perry Nuclear Power Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations were identified.

Additional Tracking Items None

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01Exercise Evaluation

The inspectors evaluated the September 18, 2018, Biennial Emergency Plan Exercise.

The exercise scenario simulated an event at the Perry Nuclear Power Plant that initiated with the declaration and notification of an Unusual Event in response to an event associated with a leak in the plants reactor coolant system. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of an Alert, a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08Exercise EvaluationScenario Review

The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on August 20,

OTHER ACTIVITIES

BASELINE

71151Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below.

(1) EP01: Drill/Exercise Performance1 Sample (3rd Quarter of 2017-2nd Quarter of 2018);
(2) EP02: Emergency Response Organization Drill Participation1 Sample (3rd Quarter of 2017-2nd Quarter of 2018); and
(3) EP03: Alert and Notification System Reliability1 Sample (3rd Quarter of 2017-2nd Quarter of 2018).

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.

On September 20, 2018, the inspectors presented the Emergency Preparedness inspection results to Mr. F. Payne, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

71114.01Exercise Evaluation

- Perry Nuclear Power Plant 2018 Emergency Preparedness Exercise Scenario; 06/18/2018

- Perry Nuclear Power Plant Emergency Plan; Revision 52

- PSI-0019; Emergency Action Level (EAL) Bases Document; Revision 20

- EPI-A1; Emergency Action Levels; Revision 28

- EPI-A2; Emergency Actions Based on Event Classifications; Revision 22

- EPI-A6; Technical Support Center Activation; Revision 29

- EPI-A7; Operations Support Center Activation; Revision 24

- EPI-A8; Emergency Operations Facility Activation; Revision 22

- Two Years of Drill and Exercise Corrective Action Program Items; 08/2016-08/2018

- Two Years of Scenario Timelines; 09/2016-09/2018

- EPI-B1; Emergency Notification System; Revision 27

- EPI-B4; First Aid and Medical Care; Revision 18

- EPI-B5; Personnel Accountability/Site Evacuation; Revision 17

- EPI-B8; Protective Actions and Guides; Revision 19

- EPI-B10; Emergency Radiological Environmental Monitoring Program; Revision 8

- EPI-B11; Emergency Dosimetry Issue; Revision 11

- EP-B13; Determination of Core Damage Under Accident Conditions; Revision 11

- NOP-LP-5007; Perry MIDAS Dose Assessment; Revision 3

- CR 2017-06375; ERO Drill - Operations Crew 2 Removed from Licensed Duties Pending

Remediation Plan Actions for Performance During EPLAN Drill

- CR 2017-06442; ERO Drill Objective I7 Not Met - KI Issuance

- CR 2017-06443; ERO Drill Objective I3 Not Met - Dosimetry Issue

- CR 2017-09447; ERO Drill: Delay of Notification to State and County

- CR 2017-11780; Site Personnel Protection During Simulated Emergencies

- CR 2018-05335; ERO Drill 6-6-18: 5-Way Bridge Dropped Out on Several Occasions

- CR 2018-05454; ERO Drill 6-6-18: Objective B.1 Not Met - ERO Not Notified Within

Minutes of Classification

- CR 2018-05549; ERO Drill 6-6-18: Potassium Iodide (KI) Issuance without Emergency

Cooordinator Approval

- CR 2018-07283; ERO Drill - During 8/15/2018 Drill Objective B1, Notification of ERO, Was

Not Met

- CR 2018-07289; ERO Drill: Simulator Auto Dialer Phone did not Connect to State and

Ashtabula

- CR 2018-07292; ERO Drill - Objective C-1 Not Met, Failure to Notify Offsite Agencies within

Minutes

71114.08Exercise EvaluationScenario Review

- Perry Nuclear Power Plant 2018 Emergency Preparedness Exercise Scenario 60 Day

Submittal; 07/18/2018

71151Performance Indicator Verification

- NRC Performance Indicator Data; Drill/Exercise Performance; 3rd Quarter of 2017-2nd Quarter

of 2018

- NRC Performance Indicator Data; Emergency Response Organization Drill Participation;

3rd Quarter of 2017-2nd Quarter of 2018

- NRC Performance Indicator Data; Alert and Notification System Reliability; 3rd Quarter

of 2017-2nd Quarter of 2018

- NEI 99-02; Regulatory Assessment Performance Indicator Guideline; Revision 7

5