IR 05000440/2017410

From kanterella
Jump to navigation Jump to search
NRC Security Problem Identification and Resolution Inspection Report 05000440/2017410 (Cover Letter Only)
ML17356A021
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/21/2017
From: Billy Dickson
NRC/RGN-III/DRP/B5
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2017410
Download: ML17356A021 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 21, 2017

SUBJECT:

PERRY NUCLEAR POWER PLANTNRC SECURITY PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000440/2017410

Dear Mr. Hamilton:

On November 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a Problem Identification and Resolution inspection at your Perry Nuclear Power Plant, Unit 1, and the NRC inspector discussed the results of this inspection with Mr. F. Payne and other members of your staff. The results of this inspection are documented in the NRC Inspection Report 05000440/2017007.

Based on the results of this inspection, the NRC has identified an issue that was evaluated under the security significance determination process as having very low security significance (Green). The NRC has also determined that a violation is associated with this issue. Because you have initiated corrective actions to address the issue, this violation is being treated as a Non-Cited Violation (NCV), consistent with Section 2.3.2a of the Enforcement Policy. Since this issue is security-related, the NCV is described in the enclosed Official-Use-Only inspection report.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Perry Nuclear Power Plant.

If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III, and the NRC Resident Inspector at Perry Nuclear Power Plant.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Billy Dickson, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure:

Inspection Report 05000440/2017410 cc: C. Salz, Radiological Branch Chief Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV