MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report 2024-01-30
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000440/20213012021-04-0808 April 2021 NRC Initial License Examination Report 05000440/2021301 IR 05000440/20193012019-04-24024 April 2019 NRC Initial License Examination Report 05000440/2019301 (Jxd) IR 05000440/20173022017-08-0909 August 2017 NRC Initial License Reexamination Report 05000440/2017302 IR 05000440/20173012017-04-13013 April 2017 NRC Initial License Examination Report 05000440/2017301 IR 05000440/20153012015-04-23023 April 2015 Examination Report 05000440/2015301; 02/02/2015 - 03/11/2015, Perry Nuclear Power Plant, Initial License Examination IR 05000440/20103012010-08-10010 August 2010 Er 05000440-10-301(DRS); 06/14/2010 - 06/30/2010; Firstenergy Nuclear Operating Company (Fenoc), Perry Nuclear Power Plant, Unit 1. Initial License Examination Report IR 05000440/20093012009-03-12012 March 2009 Er 05000440-09-301(DRS); 1/12/2009 - 1/21/2009; First Energy Corp., Perry Station Initial License Examination Report ML0907209522009-03-12012 March 2009 Er 05000440-09-301(DRS), on 1/12/2009 - 1/21/2009, First Energy Corp., Perry Station Initial License Examination Report IR 05000440/20073022007-09-20020 September 2007 Er 05000440-07-302, on 08/15/2007, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report IR 05000440/20073012007-04-26026 April 2007 Er 05000440-07-301 (Drs); 02/26/2007 - 03/02/2007; Firstenergy Nuclear Operating Company; Perry Nuclear Power Plant; Initial License Examination Report IR 05000440/20043012005-02-17017 February 2005 NRC Initial License Examination Report 50-440/04-301(DRS) ML0504806512005-02-17017 February 2005 Er 05000440-04-301(DRS); 11/29/2004-12/09/2004; Perry Nuclear Power Plant; Initial License Examination Report IR 05000440/20023012002-04-0505 April 2002 Er 05000440/2002-301, on 03/05-03/13/2002, Firstenergy Nuclear Operating Company, Perry, Unit 1. the Announced Operator Licensing Initial Examination Was Conducted by Regional Examiners in Accordance with the Guidance of NUREG-1021 2021-04-08
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
ugust 9, 2017
SUBJECT:
PERRY NUCLEAR POWER PLANT - NRC INITIAL LICENSE REEXAMINATION REPORT 05000440/2017302
Dear Mr. Hamilton:
On July 19, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Perry Nuclear Power Plant. The enclosed report documents the results of the reexamination.
An exit meeting was conducted on July 19, 2017, between you, other members of your staff, and Mr. Randal Baker, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test reexamination.
The NRC examiner administered the initial license reexamination operating test during the week of July 17, 2017. One Senior Reactor Operator-Upgrade applicant was administered the reexamination. The results of the reexamination were finalized on July 31, 2017. The applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license.
The reexamination, as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months, until July 19, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA Michael Bielby Acting for/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosures:
1. OL Examination Report 05000440/2017302 2. Simulation Facility Fidelity Report
REGION III==
Docket No: 50-440 License No: NPF-58 Report No: 05000440/2017302 Licensee: FirstEnergy Nuclear Operating Company Facility: Perry Nuclear Power Plant Location: North Perry, Ohio Dates: July 17 - July 19, 2017 Inspector: R. Baker, Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY
Examination Report 05000440/2017302; 07/17/2017 - 07/192017; FirstEnergy Nuclear
Operating Company; Perry Nuclear Power Plant; Initial License Reexamination Report.
The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10.
Examination Summary The Senior Reactor Operator-Upgrade applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license.
(Section 4OA5.1).
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the operating test reexamination. This reexamination consisted of only the walk-through portion of the operating test; the simulator scenario portion of the operating test, as well as the written examination, were successfully completed during the initial license examination and were therefore waived for this reexamination.
Members of the facility licensees staff prepared the outline and developed the walk-through portion of the operating test reexamination. The NRC examiner validated the proposed examination during the week of July 17, 2017, with the assistance of members of the facility licensees staff. During the on-site validation, the examiner audited the license re-application for accuracy. The NRC examiner, with the assistance of members of the facility licensees staff, administered the operating test reexamination on July 18, 2017.
b. Findings
- (1) Operating Test The NRC examiner determined that the walk-through portion of the operating test reexamination, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Changes made to the reexamination, documented in a document titled, Operating Test Comments, as well as the final as-administered walk-through portion of the operating test, will be available, on July 19, 2019, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System.
The NRC examiner completed grading of the operating test on July 19, 2017.
- (2) Examination Results One Senior Reactor Operator-Upgrade applicant was administered the reexamination.
The applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license on July 31, 2017.
.2 Examination Security
a. Scope
The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting
The chief examiner conducted an exit meeting on July 19, 2017, with Mr. D. Hamilton, Site Vice President, and other members of the facilitys Operations and Training organizations. Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL NFORMATION
KEY POINTS OF CONTACT
Licensee
- R. Torres, Fleet Exam Team
- L. Vriezen, Initial Licensed Operator Training Supervisor
- M. McFarland, Superintendent, Operations Training
- P. Boissoneault, Training Manager
- B. Blair, Operations Manager
U.S Nuclear Regulatory Commission
- E. Sanchez, Senior Resident Inspector
- J. Nance, Resident Inspector
- R. Baker, Chief Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF ACRONYMS USED
NRC U.S. Nuclear Regulatory Commission
SIMULATION FACILITY FIDELITY REPORT
Facility Licensee: Perry Nuclear Power Plant
Facility Docket No: 50-440
Operating Tests Administered: July 17, 2017 - July 18, 2017
The following documents observations made by the U.S. Nuclear Regulatory
Commission (NRC) examiner team during the initial operator license reexamination.
These observations do not constitute audit or inspection findings and are not, without further
verification and review, indicative of non-compliance with Title10 of the Code of Federal
Regulations 55.45(b). These observations do not affect NRC certification or approval of the
simulation facility other than to provide information, which may be, used in future evaluations.
No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
None None