UNITED STATES NUCLEAR REGULATORY COMMISSION ril 26, 2018

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - CYBER SECURITY INSPECTION REPORT 05000424/2018410 and 05000425/2018410

Dear Mr. McGavin:

On March 1, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2. On March 20, 2018, the NRC inspectors discussed the results of this inspection with Mr. Daniel Komm and other members of your staff.

The results of this inspection are documented in the enclosed report NRC inspectors documented three findings of very low safety significance (Green) in this report.

These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCV(s)) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Vogtle. In addition, if you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region II, and the NRC Resident Inspector at Vogtle.

This letter, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure(s), the transmittal document However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Number(s): 50-424 and 50-425 License Number(s): NPF-68 and NPF-81 Enclosure:

Inspection Report 05000424/2018410 and 05000425/2018410 cc: See next page cc:

Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway BIN B042 Birmingham, AL 35242 Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co. Inc.

40 Inverness Center Parkway, BIN B042 Birmingham, AL 35242 Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Birmingham, AL 35201-1295 _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE JJP3 AJB3 EMAIL SMS NAME J. PATEL A. BLAMEY S. SHAEFFER DATE 4/26/2018 4/23 /2018 4/26/2018 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO UNITED STATES NUCLEAR REGULATORY COMMISSION ril 26, 2018

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - CYBER SECURITY INSPECTION REPORT 05000424/2018410 and 05000425/2018410

Dear Mr. McGavin:

On March 1, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2. On March 20, 2018, the NRC inspectors discussed the results of this inspection with Mr. Daniel Komm and other members of your staff.

The results of this inspection are documented in the enclosed report NRC inspectors documented three findings of very low safety significance (Green) in this report.

These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCV(s)) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Vogtle. In addition, if you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region II, and the NRC Resident Inspector at Vogtle.

This letter, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure(s), the transmittal document However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Number(s): 50-424 and 50-425 License Number(s): NPF-68 and NPF-81 Enclosure:

Inspection Report 05000424/2018410 and 05000425/2018410 cc: See next page cc:

Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway BIN B042 Birmingham, AL 35242 Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co. Inc.

40 Inverness Center Parkway, BIN B042 Birmingham, AL 35242 Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Birmingham, AL 35201-1295 _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE JJP3 AJB3 EMAIL SMS NAME J. PATEL A. BLAMEY S. SHAEFFER DATE 4/26/2018 4/23 /2018 4/26/2018 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO