U.S. NUCLEAR REGULATORY COMMISSION

REGION I

,

Docket / Report: 50-423/85-71 Licensee: Northeast Nuclear Energy Company Facility Name: Millstone Unit 3, Waterford, Connecticut Inspection at: Millstone Unit 3 Onsite Inspection Dates: November 11-22, 1985 Task Completion Date: January 6, 1986 Inspection Summary:

Scope: Follow up inspection of surveillance procedure readiness to support plant operation The onsite inspection effort was performed by an NRC contractor. This inspection addressed procedural readiness for near-term activities such as fuel load and plant heatup, and readiness to support later activities such as entry into subsequent operating mode Findings: Overall status of procedure preparation for near-term activities was found acceptable (Report Section 3.2). A large number of procedure revisions to support entry into subsequent operating modes was noted as being needed (Report Sections 3.1 and 3.2). Technical Specifications, the Facility Safety Analysis Re-port, and the Surveillance Procedures were found to be compatible (Report Section 3.0). Licensee programs and plans were found generally effective in correcting

} and preventing recurrence of identified discrepancies (Executive Summary). No

! violations of NRC requirements were cited. Numerous NRC follow-up items were identifie .

i l

8601230434 860114

) PDR ADOCK 0 % 4y3 G