IR 05000416/2013502

From kanterella
Jump to navigation Jump to search
IR 05000416-13-502, December 31, 2013, Grand Gulf, NRC Emergency Preparedness Annual Inspection
ML14198A643
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/17/2014
From: Haire M S
Plant Support Branch-1
To: Kevin Mulligan
Entergy Operations
References
IR-13-502
Preceding documents:
Download: ML14198A643 (2)


Text

July 17, 2014

Mr. Kevin Mulligan Site Vice President Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000416/2013502

Dear Mr. Mulligan:

On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Grand Gulf Nuclear Station. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000416/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket: 50-416 License: NPF-29 Electronic Distribution to Grand Gulf Nuclear Station July 17, 2014 Mr. Kevin Mulligan Site Vice President Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000416/2013502

Dear Mr. Mulligan:

On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Grand Gulf Nuclear Station. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000416/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-416 License: NPF-29

Electronic Distribution to Grand Gulf Nuclear Station Distribution: M. Haire P. Elkmann L. Williams DOCUMENT NAME: R:\_REACTORS\_GG\GG2013502-LTR-pje.docx ML14198A643 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB-1 NAME MHaire/dch SIGNATURE /RA/ DATE 7/17/14 OFFICIAL RECORD COPY