December 14, 2020

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - DESIGN BASIS ASSURANCE INSPECTION (TEAMS) INSPECTION REPORT 05000400/2020010

Dear Ms. Maza:

On December 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James B. Baptist, Chief Engineering Br 1 Div of Reactor Safety Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number: 05000400 License Number: NPF-63 Report Number: 05000400/2020010 Enterprise Identifier: I-2020-010-0038 Licensee: Duke Energy Progress, LLC Facility: Shearon Harris Nuclear Plant Location: New Hill, NC Inspection Dates: March 16, 2020 to December 03, 2020 Inspectors: P. Carman, Senior Reactor Inspector C. Franklin, Reactor Inspector N. Morgan, Reactor Inspector G. Nicely, Contractor M. Riley, Reactor Inspector T. Su, Reactor Inspector J. Zudans, Contractor Approved By: James B. Baptist, Chief Engineering Br 1 Div of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (teams) inspection at Shearon Harris Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

===71111.21M - Design Bases Assurance Inspection (Teams) The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:

Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02) (4 Samples)

(1) Condensate Storage Tank (1X-SAB)
  • Normal and emergency operating procedures
  • Consistency among design and licensing bases and other documents/procedures
  • Design calculations (minimum usable safety related inventory, vortex formation, tank level setpoints)
  • Seismic qualification
  • Equipment protection from freezing
  • Corrective action history
(2) Unit 1 Emergency Service Water Pump A
  • Normal, abnormal, and emergency operating procedures
  • Consistency among design and licensing bases and other documents/procedures
  • System health report, maintenance effectiveness and records, and corrective action history
  • Equipment/environmental controls and qualification
  • Design calculations (net positive suction head available, Hydraulic, Flow Balance, Structural)
  • Surveillance testing, recent test results and trending
  • System and component level performance monitoring
  • Equipment protection from fire, flood, and water intrusion or spray
  • Heat removal cooling water and ventilation
  • Major modifications to the components and systems associated with this component
(3) 480 V Bus 1B3-SB
  • Preventative maintenance procedure and performed work order
  • 480 V load center breakers
  • 480 V supply voltage transient response during design basis event signal initiation
  • 480 V control circuit review
  • AC/DC Over-current protection and coordination procedures
  • AC distribution system design calculations (voltage, load flow, fault current)
(4) Unit 1 Emergency Service Water Pump A Discharge Strainer
  • Normal, abnormal, and emergency operating procedures
  • Consistency among design and licensing bases and other documents/procedures
  • System health report, maintenance effectiveness and records, and corrective action history
  • Equipment/environmental controls and qualification
  • Design calculations (maximum pressure drop)
  • Surveillance testing, recent test results and trending
  • System and component level performance monitoring
(1) RHR Pump 1A-SA
  • Normal and emergency operating procedures
  • Maintenance effectiveness
  • Component health reports, corrective maintenance records, and corrective action history
  • Consistency between station documentation and vendor specifications
  • Surveillance and In-service testing results
  • Component modifications

Modification Review - Permanent Mods (IP Section 02.03) (5 Samples)

(1) EC 286530, Hydrogen Analyzer and Monitoring Safety Classification Downgrade and Electric Hydrogen Recombiner Removal
(2) EC 287140, 480 V Motor Control Center Bucket Replacement
(3) EC 406691, P-4 1BSB Chilled Water Pump Motor Replacement
(4) EC 416707, Emergency Diesel Generator Overspeed Check Valve Trip
(5) EC 295208, Essential Services Chilled Water Throttle Valve Resizing

Review of Operating Experience Issues (IP Section 02.06) (2 Samples)

(1) NRC Information Notice 2017-05: Potential Binding of Schneider Electric/Square-D Master Pact NT and NW 480V AC Breaker Anti-Pump Feature
(2) NRC Information Notice 2018-07: Pump/Turbine Bearing Oil Sight Glass Problems

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 3, 2020, the inspectors presented the design basis assurance inspection (teams) inspection results to Kim Maza and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21M Calculations 0030-PKR Electrical Penetration Protection (Reg. Guide Rev. 16

1.63)

0044-SKD DC Control Power Voltage Criteria for AC Swithchgear Rev. 11

3-A-05-001 Heat Sinks Calc. for Cont. Analysis Rev. 5

435145017861 SQR for Chilled Water Circulating Pumps Assembly Rev. 2

550-2 Stress Calculation: 79-14 As-Built Review Rev. 4

9-ESCH-001 HVAC Calculation of Essential Services Chilled Water Rev. 9

System

9-RAB-001A RAB Normal Ventilation System Served By EAC-1 Rev. 4

AF-0013 Auxilliary Feedwater Verification & Setpoints Rev. 6

CAR-SH-AS-10 Field Erected Storage Tanks Rev. 5

CAR/C90 Dynamic and Hydrodynamic Analysis of Tanks Rev. 3

CPA-0012 Procedure E-54 Containment Analysis Heat Sink Source Rev. 3

Calculation

CPA-0015 Containment Net Free Volume Calculation Rev. 5

E-5506 Safe Shutdown (Including NPO) Common Power Rev. 19

Supply Coordination And MHIF Study

E-5518.000 Class 1E MCC Control Loop Analysis Methodology/Data Rev. 11

E-5521.000 Class 1E Power Panel Control Loop Analysis Rev. 20

E-5526 Fuse Coordination Study for Safe Shutdown In Case of Fire Rev. 2

E-6000 AC Distribution System Voltage/Load Flow/Fault Current Rev. 16

Study

E-6003 Emergency Power System Voltage Criteria Rev. 16

E1-0001.23 MCC Overcurrent Protective Devices - Selection/Setting Rev. 14

E1-0002.01 Overcurrent Protection, 480V Feeders to MCC`S Rev. 6

E1-0004.01 Overcurrent Protection for 480V Aux. Bus Tie, Bus 1D3 to Rev. 3

1E3

E5-0001 Analysis of Motor Output Torque for AC MOVs Rev. 20

EDC-0008 Power Cable Sizing Rev. 12

EGR-NGGC-0101 Electrical Calculation of Motor Output Torque for AC and DC Rev. 12

Motor Operated Valves

Inspection Type Designation Description or Title Revision or

Procedure Date

EQS-0003 Condensate Storage Tank Level Setpoints Rev. 6

EQS-0020 ESW System - Instrument Setpoints Rev. 6

GLS-11HPC- Generic Seismic Qualification of Homewood Energy Rev. 7

N17462 Services Nuclear Motors

HNP-M/MECH- Pump Degradation Limits for ESW,CCW and ESCW Rev. 17

1011

Not Applicable RECO Design Calculations for Condensate Storage Tank Rev. 6

SI-0043 RHR Pump NPSH Evaluation Rev. 7

SW-0007-002 Emergency Service Water TDH Calculation Rev. 5

SW-002 Normal Service Water Pumps Discharge Strainer Calcs. Rev. 0

SW-0039 ESW Pump Actuation Time Sequence Rev. 3

SW-0051 ESW System Performance HNP ESWS Hydraulic Model Rev. 8

Validation

SW-0078 Minimum ESW Flowrates Rev. 3

SW-0079 NPSHA To ESW Booster Pumps Rev. 0

SW-0080 ESW Flow Requirements based on Reservoir Level Rev. 15

SW-0082 Submergence Available to ESW Pumps Rev. 1

SW-0085 Ultimate Heat Sink Analysis, Rev. 4

TANK-0014 Condensate Storage Tank Minimum Water Level Rev. 4

TANK-0020 CST Minimum Usable and Maximum Required Inventory Rev. 4

Analysis

Corrective Action ARs 00187194 Various Corrective Action Reports Various

Documents 02031205

275366

00598302

20381

00666101

227443

2183295

219992

00741781

01955993

01971908

Inspection Type Designation Description or Title Revision or

Procedure Date

01987987

211073

2111137

2114240

2114605

2110515

2114954

2114967

00561016

00741781

00740026

00741781

2026688

2092646

00430814

00434040

00747036

2092646

2064338

2017078

01999243

213515

2095857

2098156

2098181

227473

0748719

224541

207689

2302401

Corrective Action 02323404 EMI/RFI Applicability for EC 284170 4/1/2020

Documents AR 02323532 Evaluation of MCC Contactor Voltage during Transient 4/2/2020

Resulting from Conditions

Inspection AR 02323623 Screen Wash Pump Reliability Challenges at HNP 4/2/2020

Inspection Type Designation Description or Title Revision or

Procedure Date

Drawings 1364-006178 Chilled Water Pump P4 in RAB EL261 Dimension DWG Rev. 5

1364-006318 ESW Self Cleaning Strainer Cross Section and Rev. 9

1364-007370 Emergency Service Water Pump O/L Rev. 13

1364-016186 480 V SWGR Bus RAB 1B3-SB EL 286-0 Rev. 12

1364-025900 Emergency SW Self Cleaning Strainer O/L for unit 1 Rev. 2

1364-043477 Emergency Service Water Pump Sectional Dwg 32X42 Rev. 7

VS01

1364-096537 ESW Pump Lower Seismic Support Assembly Rev. 1

1364-16589 Emergency Service Water Pump Motor O/L Rev. 3

1364-43475 Emergency Service Water Pump B/M 32X42 VS01 Rev. 13

1364-47948 Tank 1X SAB (CST Tank Bldg) Elev & Noz Orient Rev. 4

1364-4840 Emergency Service Water Pump Performance Curve Rev. 4

1364-5954 Chilled Water Pumps P-4 Motor Drawing Rev. 4

5-G-0047 Flow Diagram Circulating and Service Water Systems Sheet Rev. 93

- Unit 1

5-G-0048 Flow Diagram-Circulating and Service Water Systems Sheet Rev. 77

- Unit 1

5-G-0911 General Arrangement Waste Processing Building Plan EL. Rev. 27

236 Unit 1

5-S-0547 Simplified FLow Diagram Circulating & Service Water Rev. 64

Systems

5-S-808 Simplified Flow Diagram Cooling Tower Blowdown, Make-up Rev. 37

and Intake Structures Screenwash Systems Unit 1,

6-B-041 0132 Unit 1 Power Distribution & Motor Data 480V Emergency Rev. 13

Bus 1B3-SB

CAR 2166 G- 480V Auxiliary One Line Diagram Rev. 33

0030

CAR-2165 G-88 Flow Diagram Miscellaneous Systems Rev. 36

CAR-2165-G-308 Flow Diagram Cooling Tower Blowdown, Make - Up and Rev. 40

Intake Structures Screenwash Systems Unit 1

CAR-2167-G- Emergency Service Water System Main Reservoir Intake Rev. 11

2847 Structure- MAS SH 3

CAR-2167-G- Emergency Service Water System Main Reservoir Intake Rev. 6

2848 Structure- MAS SH 4

Inspection Type Designation Description or Title Revision or

Procedure Date

CAR-2167-G- Emergency Service Water System Main Reservoir Intake Rev. 9

2877 Structure- MAS SH 3

CPL-2165 G- Flow Diagram Condensate & Air Evacuation Systems Rev. 70

0045

CPL-2165 S-0545 Simplified Flow Diagram Condensate & Air Evacuation Rev. 68

Systems Unit 1

CPL-2165-S-0547 Simplified Flow Diagram Circulating and Service Water Rev. 64

Systems Sheet 1 Unit 1

PD5165-BC- AC Power Distribution System Rev. 15

00001

Engineering 284170 480V Motor Control Center Bucket Replacements Rev. 39

Changes 286530 Hydrogen Analyzer and Monitoring Safety Classification Rev. 18

Downgrade and Electric Hydrogen Recombiner Removal

EC 300537 Preliminary Cause of A ESW Pump Failure and Potential Rev. 2

Impact on Reliability

EC 300538 ESW Pump Seismic Restraint - Bolt Size Reduction Rev. 0

EC 400583 HNP Component Reclassification Project and CAS Merger Rev. 0

Data Clean-up

EC 400763 ESW Min. Wall Evaluations for Cycle 20 Rev. 0

EC 401600 ESW Pumps Modification-Couplings, Shafts, Bearings Rev. 7

EC 402435 ESW Pump Vibration Monitor Station Installation Rev. 11

EC 406691 P-4 1BSB Chilled Water Pump - Motor Replacement Rev. 0

EC 407423 ESW Screen Wash Pump Oil Level Rev. 0

EC 408521 EB 16-25, Critical Component Reduction Rev. 0

EC 51467 Minor Changes to Support Lube Program Improvements Rev. 0

Engineering 98-00186 Analysis of CST Required Minimum Useable Inventory Rev. 0

Evaluations

Miscellaneous #303044 Susquehanna OE

01984617-05 QHSA: Triennial Heat Sink Performance 3/3/2016

909GF294 Instruction Manual Vibraswitch Malfunction Detector Model Rev. L

365A Model E365A

AD-EG-ALL-1126 Seismic Technical Review of Vendor Qualification Reports, 1/12/2017

GLS-11HPC-N17462

AR 0213515 NRC Information Notice 2018-07: Pump/Turbine Bearing Oil 6/18/2018

Inspection Type Designation Description or Title Revision or

Procedure Date

Sight Glass Problems

CM-M0260 Plant Operations Manual: Adams Dual Backwash Automatic Rev. 7

Poro-Edge Strainers

CSD-ED-DEP- Pipe Stress Analysis Rev. 0

0308

CSD-EG-DEP- Pipe and Tube System Design Rev. 0

0355

DBD-002 Piping Stress Analysis Rev. 3

DBD-1000-V02 Environmental Qualification Design Basis Document Rev. 11

DBD-112 Condensate, Main Feedwater, Condensate Polishers, Rev. 26

Feedwater Drains and Vents Systems

DBD-114 Auxiliary Feedwater System Rev. 017

DBD-128 Service Water System Traveling Screens and Screen Wash Rev. 32

System Waste Processing Building Cooling Water System

DBD-132 Essential and Nonessential Services Chilled Water System Rev. 16

DBD-202 Plant Electrical Distribution System Rev. 40

DBD-305 Hydrogen Monitoring System Rev. 8

DSD-132 Essential & Nonessential Services Chilled Water Systems Rev. 16

EC 84170 Scope Document Rev. 0

ESCW-AO Essential Services Chilled Water System Training Rev. 12

ESR 9600025 Eval. Results of EPT-441 / Modify ESW Pumps 12/18/1996

HNAOCC164-N AOCT Impact Training Rev.0

HNP-C/EQ-1231 Evaluation of ESW Pump Modification Rev. 3

HNP-E-0007 Specification Sub-Type: EIC Procurement Specification for Rev. 7

Replacement Motor Control Center Buckets

ILC-480V 480 Auxiliary Power Rev. 11b

Letter CPL-89- Vortex Formation in the Condensate Storage Tank 10/16/1989

634

NCR 434040 Apparent Cause Evaluation - Trend has Emerged With 6/31/2011

Vertical Pump Equipment

PDO for NCR PDO for Molded Case Circuit Breaker 1A31-SA-7D tropped. 10/30/2015

1970424

Inspection Type Designation Description or Title Revision or

Procedure Date

Pump Test ESW SW1A-SA 12/4/2015

Deviation Record

Q4-2019 ESW System Health Report 2/3/2020

RCE 00747030- Loss of A ESW Flow and Pressure, Entry Into AOP-22 5/4/2015

VM-IJX Motors Rev. 24

VM-KIS Pumps, ESW Rev. 18

VM-OJZ Circuit Breakers and Switchgear Rev. 26

VTD-ADRP-0001 Adams, RP CO Inc Operating and Maintenance Instructions Rev. 11

for the Care and Operation of Dual Backwash Automatic

Poro-Edge Strainers.

NDE Reports DBD-105 Residual Heat Removal System Rev. 14

Procedures AD-EG-ALL-1122 Failure Modes and Effects Analysis and Single Failure Rev. 2

Analysis

AD-EG-ALL-1132 Preparation and Control of Design Change Engineering Rev. 15

Changes

AD-EG-ALL-1133 Preparation and Control of Design Equivalent Change Rev. 11

Engineering Changes

AD-EG-ALL-1133 Preparation and Control of Design Equivalent Change Rev. 2

Engineering Changes

AD-EG-ALL-1137 Engineering Change Product Selection Rev. 7

AD-EG-ALL-1216 Surveillance Frequency Control Program Rev. 2

AD-EG-ALL-1720 Inservice Testing (IST) Program Implementation Rev. 5

AD-LS-ALL-0007 Applicability Determination Process Rev. 6

AD-OP-ALL-0105 Operability Determinations and Functionality Assessments Rev. 5

AD-OP-ALL-0109 Operator Rounds Rev. 2

AD-PI-0401 Significant Operating Experience Program Rev. 8

AD-PI-ALL-0100 Corrective Action Program Rev. 21

AD-PI-ALL-0400 Operating Experience Program Rev. 7

CM-E0010 Molded Case Circuit Breaker Test Rev. 32

CM-M0195 Emergency Service Water Screen Wash Pump Rev. 16

Disassembly, Inspection, and Reassembly

CM-M0223 (ESW) Ingersoll - Dresser Pump (Model 35LKX2) Rev. 31

Inspection Type Designation Description or Title Revision or

Procedure Date

Disassembly and Maintenance

CSD-EG-DEP- Control Cable Sizing Rev. 0

0105

CSD-EG-DEP- AC/DC Overcurrent Protection and Coordination Rev. 0

0106

EGR-NGCC-0106 AC and DC Over-current Protection and Coordination Rev. 4

EOP-E-0 Reactor Trip or Safety Injection Rev. 15

EOP-FR-Z.1 Response to High Containment Pressure Rev. 2

EPT 250 A Train ESW Flow Verification/Balance Superseded by Rev. 23

OPT-1082

EPT-44 ESW 1A-SA Pump Curve Determination Rev. 11

HNP-IST-004 HNP IST Program Plan - 4th Interval Rev. 1

ISI - 800 Inservice Testing of Pumps Rev. 30

MPT-E0024 Molded Case Circuit Breaker Test Rev. 57

MST-E0006 480/240 VAC Molded Case Circuit Breaker Test Rev. 34

MST-E0072 480 VAC Siemens Type RLD Load Center Breaker and Rev. 22

Cubicle Test

OMM-016 Operator Logs Rev. 77

OP-134 Condensate System Rev. 63

OP-137 Auxiliary Feedwater System Rev. 46

OPT-1082 A-SA Train ESW Flow Verification / Balance Rev. 5

OPT-1518 Emergency Service Water Stagnant Area Flushing Monthly Rev. 12

Interval at all Times

OST-1008 1A-SA RHR Pump Operability Quarterly Interval Modes 1-2- Rev. 35

OST-1015 Emergency Service Water System Operability Monthly Rev. 2

Interval Modes 1-2-3-4

OST-1108 RHR Pump Operability Quarterly Interval Mode 4, 5, and 6 Rev. 33

OST-1214 Emergency Service Water System Operability Train A Rev. 92

Quarterly Interval Modes 1-2-3-4-5-6 Defueled

OST-1825 Safety Injection: ESF Response Time, Train A 18 Month Rev. 50

Interval on a Staggered Test Basis Modes 5 - 6

OST-1840 Steam Generator Blowdown Sample Valve Position Rev. 15

Inspection Type Designation Description or Title Revision or

Procedure Date

Indication Test 2 Year Interval Modes 1-4

OST-1872 ESW Pump - SA ESF Response Time Train A 18 Month Rev. 1

Interval On a Staggered Test Basis Modes 1-6

PM-E0015 480 V and 6.9 KV Transformer Electrical and Preventive Rev. 24

Maintenance Check

PM-E0044 480 VAC Type RLN Load Center Breaker ad Cubicle P.M> Rev. 23

PM-E0066 480V ABB Type Load Center Breaker and Cubicle PM Rev. 5

PM-M0011 Equipment Lubrication Rev. 28

PM-M0074 Equipment Lube Oil Sampling Rev. 34

PM-M0074 Equipment Lube Oil Sampling Rev. 34

SW-0086 Service Water Pressure at Containment Fan Coolers Rev. 5

Radiation AD-MN-ALL-0002 Foreign Material Exclusion Rev. 10

Surveys

Work Orders 20187811-01 Various Work Orders Various

OST-1024

20151114

20163208-01

20164658

20166284

20173728

20177322

20183146-01

2019114-01

20192411

20198603-01

20199925

204143

208366-01

205555

206969-01

209816-01

211218

216319

217960-01

Inspection Type Designation Description or Title Revision or

Procedure Date

213705-01

213705-01

20149515-01

221956-01

229229-01

214731-01

11993193

263633

13304312

13315485

1331550

13465316

20021932

20085841

20097247

20109425

20118171

20126240

20126241

20164011

20164012

20164213

268401

268933

276226

20301180

20316035

2052683

13441192

13519401

17