NRC Triennial Fire Protection Inspection Report No. 05000400/2018-011
ML18283A084
Person / Time
Site: Harris Duke energy icon.png
Issue date: 10/09/2018
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Hamilton T
Duke Energy Progress
References
IR 2018011
Download: ML18283A084 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 9, 2018

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT NO. 05000400/2018011

Dear Ms. Hamilton,

On August 30, 2018, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Shearon Harris Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos: 50-400 License Nos: NPF-63

Enclosure:

Inspection Report 05000400/2018011 w/Attachment: Supplemental Information

REGION II==

Docket Nos: 50-400 License No: NPF-63 Report No: 05000400/2018011 Enterprise Identifier: I-2018-011-0025 Licensee: Duke Energy Progress, LLC Facility: Shearon Harris Nuclear Power Plant Location: 5413 Shearon Harris Road New Hill, NC 27562 Dates: August 13-17, 2018 (Week 1)

August 27-30, 2018 (Week 2)

Inspectors: E. Coffman, Reactor Inspector L. Jones, Senior Reactor Inspector J. Montgomery, Senior Reactor Inspector (Lead Inspector)

M. Singletary, Reactor Inspector Approved by: Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Enclosure

SUMMARY

The U.S. NRC continued monitoring licensees performance by conducting a triennial fire protection inspection (TFPI) at Harris Nuclear Power Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings were identified.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspectionprocedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.05XT - Fire Protection - NFPA 805 (Triennial)

The inspectors evaluated the following from August 13 - August 30, 2017:

Fire Protection Inspection Requirements ===

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) FA 1-BAL-J, Reactor Aux Building - HVAC Room
(2) FA 1-A-SWGRA, Switchgear Room A
(3) FA 12-A-CR, Control Room, Auxiliary Building
(4) FA 1-A-CSRA, Cable Spreading Room A

B.5.b Inspection Activities (1 Sample)

The inspectors evaluated feasibility of the following B.5.b Mitigating Strategies:

(1) Containment Flooding with Portable Pump

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

On August 30, 2018, the lead inspector presented the preliminary inspection results to Ms. T.

Hamilton and other members of the licensees staff.

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Ertman, Manager, Fleet Fire Protection
A. Holder, Fleet Fire Protection
J. Lemmer, Fire PRA
J. Nobles, Site Fire Marshal, Operations
R. Rhodes, Principal Engineer - Safe Shutdown Program Manager
H. Stiles, Fire PRA
M. White, Nuclear Operations Tech
C. Yarley, Regulatory Affairs

NRC Personnel

J. Zeiler, Senior Resident Inspector
A. Patz, Resident Inspector

LIST OF DOCUMENTS REVIEWED