December 21, 2020

SUBJECT:

COLUMBIA GENERATING STATION - REVISED INTEGRATED INSPECTION REPORT 05000397/2020003

Dear Mr. Sawatzke:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. The results of this inspection were originally issued in a report, dated October 28, 2019 (Agencywide Document Access and Management System (ADAMS) Accession No. ML20302A231).

The NRC staff subsequently determined that due to an administrative oversight, the inspection activities associated with Inspection Procedure 71153, Follow-up of Events and Notices of Enforcement Discretion, were documented as one sample each under event follow-up (IP Section 03.01) and personnel performance (IP Section 03.03), when in fact it should have been documented as two samples under personnel performance. The revised inspection report correcting this error is enclosed. This change had no impact on the findings documented in this report, but consistent with NRC processes, this report is being reissued in whole. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jeffrey Digitally signed by Jeffrey Josey Josey Date: 2020.12.21 07:50:52 -06'00'

Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number: 05000397 License Number: NPF-21 Report Number: 05000397/2020003 Enterprise Identifier: I-2020-003-0011 Licensee: Energy Northwest Facility: Columbia Generating Station Location: Richland, WA Inspection Dates: July 1, 2020 to September 30, 2020 Inspectors: A. Patz, Senior Resident Inspector C. Roettgen, Senior Resident Inspector L. Merker, Resident Inspector N. Greene, Senior Health Physicist J. ODonnell, Senior Health Physicist D. Antonangeli, Health Physicist B. Tharakan, Technical Assistant Approved By: Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Perform an Adequate Radiation Survey to Identify and Control a High Radiation Area Cornerstone Significance Cross-Cutting Report Aspect Section Occupational Green [H.14] - 71124.01 Radiation Safety NCV 05000397/2020003-01 Conservative Open/Closed Bias The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR 20.1501(a), for the licensees failure to perform an adequate radiological survey and identify a high radiation area. Specifically, on May 30, 2019, Radiation Protection personnel were notified by a radiation worker about an unanticipated self-reading dosimeter dose rate alarm while the worker was decontaminating equipment within a posted high contamination area (HCA) on the refuel floor (606-foot elevation of the reactor building). Radiation Protection personnel did not perform a survey to verify the radiological conditions in the work area and allowed the work to continue. The workers were later asked to exit the area when it was determined that the work could not be completed within the allotted dose limit set point.

Failure to Follow ALARA Planning Procedures Resulting in Unplanned Dose on a Work Activity Cornerstone Significance Cross-Cutting Report Aspect Section Occupational Green [H.5] - Work 71124.02 Radiation Safety NCV 05000397/202003-02 Management Open/Closed The inspectors reviewed a self-revealed, Green, non-cited violation Technical Specification (TS) 5.4.1 because the licensee failed to follow their as low is reasonably achievable (ALARA)planning procedures resulting in unplanned dose while performing the control rod drive mechanism (CRDM) replacement work. Specifically, the licensees procedure instructed them to obtain data on the actual radiological conditions in the work area prior to commencement of the job and determine the effective dose rate using corrected historical data for the current scope and radiological conditions in the radiation work permit (RWP) planning phase. The licensee initially planned the job for approximately 6.850 person-Rem, including under vessel work, whereas the actual dose accrued to complete the work activity was 10.752 person-Rem.

Additional Tracking Items

None.

PLANT STATUS

The reactor unit began the inspection period at 40 percent power per economic dispatch. On July 5, 2020, reactor power was raised to 85 percent power. On July 6, 2020, the reactor was returned to 100 percent power. On July 7, 2020, reactor power was reduced to 85 percent for a control rod pattern adjustment and then returned to 100 percent power. On September 15, 2020, plant power was reduced to 81 percent due to a high level trip of feedwater heater 2B with subsequent trips of feedwater heaters 2C, 3C, 4A, 4B, and 4C. On September 16, 2020, the reactor was returned to 100 percent power. On September 26, 2020, plant power was reduced to 80 percent to perform a control rod sequence exchange and maintenance on an adjustable speed drive channel before returning to 90 percent power; plant power was again reduced to 79 percent to recover the adjustable speed drive channel and then returned to 100 percent power where it stayed for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted. As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed onsite portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site.

The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) High pressure core spray system following annual maintenance on August 3, 2020
(2) Diesel generator 2 during diesel generator 1 annual maintenance on August 13, 2020
(3) Standby service water system A during standby service water system B annual maintenance on September 21, 2020
(4) Reactor core isolation cooling system following annual maintenance on

September 24, 2020 Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of diesel generator 1 following annual maintenance on August 6, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Area RC-10/U, main control room, on July 14, 2020
(2) Fire Areas DG-3/2, DG-5/2, and DG-9/2; diesel generator 2 room, diesel oil storage tank access room, and day tank room; on July 27, 2020
(3) Fire Area R-3/#, high pressure core spray system pump room, on July 28, 2020
(4) Fire Area DG-2/1, diesel generator 1 room, on August 4, 2020
(5) Fire Area RC-3/1, vertical cable chase room, on September 11, 2020
(6) Fire Areas DG-1/1 and DG-10/#, diesel generator 3 room and deluge valve equipment room, on September 22, 2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated fire brigade performance during an annual fire drill on August 26, 2020.

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness and performance of diesel generator 2 heat exchangers DCW-HX-1B1 and DCW-HX-1B2 on September 30, 2020.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during reactor power changes for an unexpected loss of feedwater level controller 5A on September 15, 2020, and to perform a control rod sequence exchange and maintenance on an adjustable speed drive channel on September 26, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a licensed operator requalification training drill (Crew E) on July 27, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) High pressure core spray system on July 31, 2020
(2) Diesel generator 1 on August 13, 2020
(3) Reactor core isolation cooling system on September 21, 2020
(4) Standby service water system B on September 28, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Yellow risk for backup transformer maintenance, week of July 20, 2020
(2) Yellow risk for high pressure core spray system maintenance, week of July 27, 2020
(3) Yellow risk for diesel generator 1 maintenance, week of August 5, 2020
(4) High risk for transformer E-TR-8A/1 replacement on September 13, 2020
(5) Yellow risk for reactor core isolation cooling system maintenance, week of September 14, 2020
(6) Yellow risk for standby service water system B maintenance, week of September 21, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1) Low oil pressure and metal shavings in oil filter of control room emergency chiller 1B on August 4, 2020
(2) Containment vacuum breaker 1EF abnormal indication on August 6, 2020
(3) Inverter 3B abnormal indication and voltage transient following attempted transfer from inverter 3A on August 13, 2020
(4) Annual standby service water flow balance out of specification on August 25, 2020
(5) Isolation capability of motor-operated valves RHR-V-9 and RCIC-V-22 on August 27, 2020
(6) Electrical power panel E-PP-8AE low voltage on September 1, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Control room emergency chiller 1B low oil pressure on July 28, 2020
(2) High pressure core spray system on July 31, 2020
(3) Diesel generator 1 on August 5, 2020
(4) Control room emergency chiller 1B low oil pressure on August 26, 2020
(5) Reactor core isolation cooling system on September 21, 2020
(6) Standby service water system B on September 22, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Work Orders 02140807 and 02140808, condensate storage tanks A and B inspection for license renewal, on September 28, 2020
(2) OSP-FLEX-Q704, diesel generator 4 quarterly surveillance, on September 30, 2020

Inservice Testing (IP Section 03.01) (1 Sample)

(1) OSP-SGT/IST-Q701, standby gas treatment valve quarterly surveillance, on August 10, 2020

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)

(1) The inspectors evaluated the emergency planning drill (Emergency Response Organization Team B) on August 25,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

COVID-19 pandemic conditions impacted the NRCs ability to conduct the inspection as scheduled. As a result, onsite inspection of appropriately risk-informed samples was not available. Therefore, IP 71124.01 is considered complete in accordance with IMC 0306, Section 06.08.f.3.

Radiological Hazard Assessment (IP Section 03.01) (1 Partial)

(1) (Partial)

The inspectors remotely evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Partial)

(1) (Partial)

The inspectors remotely evaluated radiological protection-related instructions to plant workers.

Contamination and Radioactive Material Control (IP Section 03.03) (1 Partial)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) (Partial)

Inspectors reviewed condition reports, procedures, inventory, and surveys remotely for items stored in the spent fuel pool.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (2 Partials)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) (Partial)

Inspectors remotely reviewed monitoring data, procedures, and radiation work permits. The radiation work permits associated with Refueling Outage 24 in-vessel work, wet work, spent fuel pool work, and Rx Cavity work were reviewed.

(2) (Partial)

The inspectors remotely reviewed electronic alarming dosimeter set points for radiation work permits associated with Refueling Outage 24 and verified set points were based on operating experience or historical outage data.

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (2 Partials)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:

(1) (Partial)

Inspectors remotely reviewed high radiation area condition reports relative to areas on the 606-foot elevation of the Reactor Building.

(2) (Partial)

Inspectors remotely reviewed high radiation area condition reports relative to areas on the 441-foot elevation of the turbine building.

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Partial)

(1) (Partial)

Inspectors remotely reviewed job coverage procedures, surveys, and radiation work permits.

71124.02 - Occupational ALARA Planning and Controls

Radiological Work Planning (IP Section 03.01) (5 Samples)

The inspectors evaluated the integration of as low as is reasonably achievable planning into the following work activities:

(1) RWP 30004256, R24 Wet Work/Reactor Dive Inspection (Divers) - LHRA/High Risk
(2) RWP 30004318, R24 Control Rod Drive Mechanism (CRDM) Undervessel Remove and Replace - LHRA/High Risk
(3) RWP 30004328, R24 Steam Tunnel (ST)/VR/DCA/Rebuild Room Miscellaneous Work - High Risk
(4) RWP 30004336, R24 Drywell/ST Shielding Install/REM and Support Tasks - LHRA
(5) RWP 30004347, R24 Drywell Main Steam Relief Valve (MSRV) Maintenance -

LHRA Verification of Dose Estimates and Exposure Tracking Systems (IP Section 03.02) (5 Samples)

The inspectors evaluated dose estimates and exposure tracking.

(1) RWP 30004256, R24 Wet Work / Reactor Dive Inspection (Divers) - LHRA/High Risk
(2) RWP 30004318, R24 Control Rod Drive Mechanism (CRDM) Undervessel (UV)

Remove and Replace - LHRA/High Risk

(3) RWP 30004319, R24 CRDM UV Support - LHRA
(4) RWP 30004347, R24 Drywell MSRV Maintenance - LHRA
(5) RWP 30004350, R24 Steam Tunnel MSIV Maintenance and Refurb Tasks - LHRA

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01)

The inspectors were unable to evaluate the configuration of permanently installed ventilation systems.

Temporary Ventilation Systems (IP Section 03.02)

The inspectors were unable to evaluate the configuration of temporary ventilation systems.

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors remotely evaluated the licensees use of respiratory protection devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors remotely evaluated the licensees use and maintenance of self- contained breathing apparatuses.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to external dosimetry that is used to assign occupational dose.

Internal Dosimetry (IP Section 03.03) (1 Sample)

The inspectors evaluated the following internal dose assessments for actual internal exposures:

(1) Dose assessment for an individual potentially exposed to airborne radioactivity while working on bleed steam valves in the TG 471-foot building on June 8, 2019. The licensee documented the issue I AR 00395101.

Special Dosimetric Situations (IP Section 03.04) (3 Samples)

The inspectors evaluated the following special dosimetric situations:

(1) EDEX dose assessment and redacted NRC Form 5 for individuals using multipack dosimetry during the following RWP activity:
  • RWP 30004258, R24 Wetwork/Reactor Dive Inspection (Divers) - LHRA/High Risk
(2) EDEX dose assessment and redacted NRC Form 5 for individuals using multipack dosimetry during the following RWP activity:
  • RWP 30004447, 2018 Reactor 606 Badger Testing
(3) EDEX dose assessment and redacted NRC Form 5 for individuals using multipack dosimetry during the following RWP activity:
  • RWP 30004470, 2019 Reactor 522 and Reactor 548 RWCU Flow -

LHRA/High Risk

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05) ===

(1) (07/01/2019 - 06/30/2020)

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) (07/01/2019 - 06/30/2020)

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) (07/01/2019 - 06/30/2020)

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) (07/01/2019 - 06/30/2020)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) (07/01/2019 - 06/30/2020)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) (04/01/2019 - 06/30/2020)

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) (04/01/2019 - 06/30/2020)

71153 - Followup of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)

(1) The inspectors evaluated licensee response to an inverter 3B abnormal indication and voltage transient following attempted transfer from inverter 3A and resultant 8-hour and 12-hour technical specification shutdown action statement entries on July 10, 2020.
(2) The inspectors evaluated operator response to a rapid downpower due to a high level trip of feedwater heater 2B with subsequent trips of feedwater heaters 2C, 3C, 4A, 4B, and 4C on September 15,

INSPECTION RESULTS

Failure to Perform an Adequate Radiation Survey to Identify and Control a High Radiation Area Cornerstone Significance Cross-Cutting Report Aspect Section Occupational Green [H.14] - 71124.01 Radiation Safety NCV 05000397/202003-01 Conservative Open/Closed Bias The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR 20.1501(a), for the licensees failure to perform an adequate radiological survey and identify a high radiation area. Specifically, on May 30, 2019, radiation protection personnel were notified by a radiation worker about an unanticipated self-reading dosimeter dose rate alarm while the worker was decontaminating equipment within a posted high contamination area (HCA) on the refuel floor (606-foot elevation of the reactor building). Radiation protection personnel did not perform a survey to verify the radiological conditions in the work area and allowed the work to continue. The workers were later asked to exit the area when it was determined that the work could not be completed within the allotted dose limit set point.

Description:

On May 30, 2019, two laborers were assigned the task of decontaminating a highly contaminated component removed from the reactor vessel. The component was a ring track used for mounting a specialty camera used to perform in-vessel visual inspections.

During the dayshift, the ring track was removed from the reactor cavity and placed in a high contamination area (HCA) within a posted radiation area (RA) on the refuel floor (606-foot elevation of the reactor building). At approximately 5:30 pm, dayshift radiation protection personnel began turnover to nightshift; however, a face-to-face turnover between the dayshift and nightshift Refuel Lead Techs (RLTs) did not occur. A telephone discussion was held instead. The postings around the ring track were not discussed during the telephone turnover. The nightshift RLT assumed the ring track was within a posted high radiation area, but did not attempt to validate this assumption.

At approximately 6:30 pm, the nightshift RLT briefed the two laborers about the ring track decontamination work. The Radiation Work Permit (RWP) authorized entry into posted high radiation areas (HRAs) and HCAs; however, the laborers were not briefed on area dose rates exceeding 100 millirem per hour and the briefing did not cover the potential for decontamination rags to generate significant dose rates. Prior to the decontamination work, surveys of the HCA indicated dose rates up to 60 millirem per hour at 30 cm from the ring track. The RWP established self-reading dosimeter (SRD) alarm setpoints at 40 millirem for dose and 200 millirem per hour for dose rate. The laborers were instructed to use multiple radioactive material (RAM) bags to ensure that the rags did not aggregate and create a dose concern; however, previous operating experience where aggregated decontamination rags created unposted HRAs was not discussed. At the briefing, the RLT did not specify which technician on the refuel floor would be providing coverage in the field, and no one on the refuel floor was assigned this responsibility. Initially, there were two radiation protection technicians (RPTs A&B) assigned to the refuel floor and later a second crew (RPTs C&D)arrived to relieve RPTs A&B.

When the laborers arrived at the refuel floor to prepare for the decontamination work, RPT B helped them don the proper protective clothing and equipment, including powered air-purifying respirators. After gathering additional supplies, the decontamination work commenced and RPT B left to attend to another job. The dose accrued by the laborers was also being monitored remotely by the RPTs.

At approximately 8:06 pm, as the laborers worked to decontaminate the ring track and placed the decontamination rags into a RAM bag, one of the laborers lanyards came undone, falling with the SRD and badge inside of the protective clothing to their knee. During this motion, the SRD experienced a dose rate alarm for approximately three seconds. The alarm, vibration, and SRD movement went unnoticed by the laborer. The alarm was not locked in long enough to register on the remote monitoring system. Around this same time is when the RAM bag became an HRA.

At approximately 8:14 pm, the laborer noticed the SRD was vibrating against his leg. He informed the other laborer and informed RPT A that he believed his SRD was alarming.

RPT A escorted the laborers to the step-off pad and contacted the RPTs at the remote monitoring station to check if a dose rate alarm occurred. No locked in alarms were noted, so it was relayed there was no alarm present. RPT A discovered the laborers SRD had fallen and assumed the vibration was caused by the dropped SRD. The laborers SRD and lanyard were relocated to the pocket of the inner set of his protective clothing and work was allowed to continue without validating that an alarm occurred by logging out the SRD or performing a survey of the work area to verify dose rates had not increased.

Work continued until about 8:50 p.m., when RPT C notified the laborers to exit based on the dose accrued and amount of decontamination work that remained to be done on the ring track. Upon exiting, the laborer who believed he had received an alarm, informed an RPT that was not involved in the work about the alarm he received. The licensee performed a follow-up survey that identified an unposted HRA with dose rates up to 1,600 millirem per hour on contact and 180 millirem per hour at 30 centimeters from the source, which happened to be the RAM bag where the laborers were disposing of the decontamination rags. The RAM bag was subsequently taped, labeled, and relocated to a posted HRA.

The inspectors reviewed the condition report, RWPs, surveys, and investigation details associated with this event and determined that the failure to perform a survey to verify radiological conditions prior to allowing work to continue was a violation of 10 CFR 20.1501(a).

Corrective Actions: The licensee counseled the radiation protection technicians involved and developed a preferred process for decontamination of highly contaminated items for the refuel floor, wetwell, and undervessel to be used during the outage. Specific precautions were added to identify and monitor RAM bags containing cleaning rags and mop heads that can quickly become high radiation areas.

Corrective Action References: Action Request (AR) 00394579 and AR 00409248

Performance Assessment:

Performance Deficiency: Failure to perform a survey on the refuel floor to identify an unposted High Radiation Area and evaluate the magnitude and extent of radiation levels as required by 10 CFR 20.1501(a) was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, the failure to perform a survey resulted in an unposted HRA where an uninformed worker was allowed to continue working with an SRD dose rate alarm setpoint that was not sufficiently low enough to allow the worker to take appropriate action before encountering dose rates exceeding 100 millirem per hour.

Significance: The inspectors assessed the significance of the finding using Appendix C, Occupational Radiation Safety SDP. The finding was of very low safety significance (Green) because it was not an as low as reasonably achievable (ALARA) planning issue, there was no overexposure nor potential for an overexposure (due to availability of alarming dosimetry being worn), and the licensees ability to assess dose was not compromised.

Cross-Cutting Aspect: H.14 - Conservative Bias: Individuals use decision making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop. Specifically, the licensees decision making-practices that allowed work to continue without performing an adequate radiation survey to verify the magnitude and extent of radiation dose rates had not increased is not reflective of an organization with a bias for conservative decision-making.

Enforcement:

Violation: 10 CFR 20.1003, defines a survey as an evaluation of the radiological conditions and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive material or other sources of radiation.

10 CFR 20.1501(a), requires in part, that each licensee make or cause to be made surveys of areas that may be necessary for the licensee to comply with the regulations in Part 20 and that surveys are reasonable under the circumstances to evaluate the magnitude and extent of radiation levels, concentrations or quantities of radioactive materials, and the potential radiological hazards that could be present.

As provided in paragraph 20.1601(c) of 10 CFR Part 20, the following controls shall be applied to high radiation areas in place of the controls required by paragraph 20.1601(a) and

(b) of 10 CFR Part 20.

Technical Specification 5.7.1 requires, in part, that for High Radiation Areas with Dose Rates not Exceeding 1.0 rem/hour (at 30 centimeters from the radiation sources or from any surface penetrated by the radiation), each entryway to such an area shall be barricaded and conspicuously posted as a high radiation area, and entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them.

Contrary to the above, on May 30, 2019, for High Radiation Areas with Dose Rates not Exceeding 1.0 rem/hour (at 30 centimeters from the radiation sources or from any surface penetrated by the radiation), the licensee failed to ensure that each entryway to such an area was barricaded and conspicuously posted as a high radiation area, and entry into such areas was made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. Specifically, 1) the entryway to an HRA near a RAM bag containing the ring track decontamination rags on the refuel floor was not barricaded and conspicuously posted and 2) entry into the area near a RAM bag containing the ring track decontamination bags on the refuel floor was made before dose rates in the area had been determined and without entry personnel being made knowledgeable of them.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Follow ALARA Planning Procedures Resulting in Unplanned Dose on a Work Activity Cornerstone Significance Cross-Cutting Report Aspect Section Occupational Green [H.5] - Work 71124.02 Radiation Safety NCV 05000397/202003-02 Management Open/Closed The inspectors reviewed a self-revealed, Green, non-cited violation Technical Specification (TS) 5.4.1 because the licensee failed to follow their as low is reasonably achievable (ALARA) planning procedures resulting in unplanned dose while performing the control rod drive mechanism (CRDM) Replacement work. Specifically, the licensees procedure instructed them to obtain data on the actual radiological conditions in the work area prior to commencement of the job and determine the effective dose rate using corrected historical data for the current scope and radiological conditions in the radiation work permit (RWP)planning phase. The licensee initially planned the job for approximately 6.850 person-Rem, including under vessel work, whereas the actual dose accrued to complete the work activity was 10.752 person-Rem.

Description:

From May to June 2019 during Refueling Outage 24, numerous jobs led to exceeding their overall dose estimate of 139.896 person-Rem, and goal of 130 person-Rem, with an actual dose accrued of 161.474 person-Rem. One of the primary work activities that led to this dose exceedance was the CRDM Replacement job to exchange a total of 20 CRDMs from under vessel. This job commenced on May 19, 2019. The licensee identified they were having issues maintaining doses ALARA and in alignment with their planned dose estimate. In AR 00395843, the licensee documented that some of the primary issues resulting in additional unplanned dose were problems with their O-rings leaking and not properly seating, issues with their use of the special equipment used to more effectively manipulate the CRDM removals, rework on some equipment, and perhaps most significantly, elevated dose rates in the work areas. Survey M-20190514-5, DW 501 Under-Vessel Post H2O Fill-Up, dated May 14, 2019, and characterized as a verification of dose rates survey, identified the maximum dose rates in the work area as 910 millirem per hour on contact and 320 millirem per hour at 30 cm. The Refueling Outage 24 (R24) Nightshift Logs, dated May 15, 2019, stated that HP Planning has indicated that U/V (under vessel) dose rates in Drywell are 75% higher than R23 (Refueling Outage 23). In addition, the licensee noted that the average dose rates for the CRDMs went from approximately 25 Rem/hour in R23 to approximately 47 Rem/hour during R24. The licensee noted that the primary reason for the elevated dose rates were attributed to the iron excursion event experienced in August 2017, and residually caused issues with the O-rings and overall dose increases. To their credit, the licensee did attempt numerous measures of dose reduction initiatives, but they were not effective enough to reduce the dose to a planned level of exposure. In response to a request for information, the licensee stated the following, The work had been planned and it was decided to follow the contingency plan rather than revise the estimate. This process did not follow the instructions provided in their ALARA planning procedures.

Procedure PPM 11.2.2.14, Radiological Planning and Reviews, Revision 4, Section 4.1.10, stated, in part, the following:

  • Obtain data on the actual or anticipated radiological conditions in the work area using one of more of the following methods:

o Pre-job surveys o Recent surveys of the work area o Historical surveys. Radiological conditions in the work area should be verified prior to allowing work to commence.

o Data from job history files for similar tasks. Radiological conditions shall be determined prior to allowing work to commence.

Section 4.1.11 of PPM 11.2.2.14 stated, in part, the following:

  • Based on the following, DETERMINE AND ENTER an effective dose rate for each craft on the H213 Panel (of the Passport Computer Program), after considering the following:

o Current and historical radiological conditions in the work area o Estimated locations and body positions of the workers during the task o Review of historical dose information corrected for current scope and conditions o Information obtained in Step 4.1.10 PPM 11.2.2.14, Section 6.1, defined Effective Dose Rate as An estimated dose rate based on the actual work area dose rates, worker position, worker movement with the work area, and planned dose reduction measures. It also stated the historical information may be used to determine the Effective Dose Rate, but these conditions were explained further in Section 4.1.10 and 4.1.11, as stated above.

The inspectors determined that the licensee failed to implement the steps in Section 4.1.11 during their planning and implementation process for the CRDM Replacement job, which included various radiological work permits. Specifically, the licensee determined that the current radiological conditions were much higher than the historical radiological data from R23, but the licensee did not use the current higher radiological conditions in the work area to properly determine an effective dose rate, which is used to determine or revise the dose estimate, for the craft on the job prior to commencement of the work. Instead, the licensee stated they decided to follow the contingency plan rather than revise the estimate.

Section 3.9 of PPM 11.2.2.14 stated, in part, that instructions and contingency plans in work instructions, ALARA plans, and the RWP should be specific and clearly stated with limited use if as directed by RP. The aim is to help workers focus on the job and respond appropriately to emergent or changing conditions. Thus, the contingency plans are inferred for use during the work activity in progress, for emergent or changing conditions, and not for decisions made prior to the job commencing. The inspectors determined that the failure to follow these instructions and implement the current radiological conditions into the ALARA planning permit prior to commencement of the work resulted in not effectively managing the radiological risk due to the short time span of the job and continuing with work in the midst of elevated radiological conditions. This ultimately resulted in unplanned dose to the workers for the CRDM Replacement job and under vessel work.

The NRC reviewed the dose estimate of 6.850 person-Rem for the job, as commenced, and credited an additional 0.251 person-Rem for credible emergent work, resulting in an NRC revised dose estimate of 7.101 person-Rem. This NRC revised dose estimate exceeds the approved revised dose estimate by the licensee, via their in-progress review, of 7.036-person-Rem for the CRDM work. Thus, the actual dose accrued of 10.752-person Rem exceeded the NRC revised dose estimate by 51.4 percent (51.4%).

Corrective Actions: The licensee documented the issues associated with the CRDM replacement job in their corrective action program as AR 00395843. The licensee also evaluated the performance of this job in their Refueling Outage 24 post job review package.

Additionally, the licensee initiated AR 00409249 to address the proposed violation and assess any additional corrective actions relative to the performance deficiency.

Corrective Action References: AR 00395843 and AR 00409249

Performance Assessment:

Performance Deficiency: The licensees failure to follow their ALARA planning procedures and properly determine the effective dose rate prior to commencement of the CRDM Replacement job is a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Program & Process attribute of the Occupational Radiation Safety cornerstone and adversely affected the cornerstone objective to ensure the adequate protection of the worker health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation. Additionally, the finding was similar to Example 6(i) in Appendix E to Manual Chapter 0612, Power Reactor Inspection Reports - Examples of Minor Issues.

Significance: The inspectors assessed the significance of the finding using Appendix C, Occupational Radiation Safety SDP. The inspectors determined the finding had very low safety significance (Green) because, although the finding involved ALARA planning and work controls, the licensees latest three-year rolling average collective dose was less than 240 person-Rem (i.e., 135.44 person-Rem).

Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, the licensee failed to execute the work with the appropriate planning commensurate with the radiological risk identified, while coordinating and managing all relative under vessel work activities.

Enforcement:

Violation: Technical Specification 5.4.1, Procedures, states, in part, that written procedures shall be established, implemented, and maintained covering the following activities:

(a) the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Appendix A, Section 7(e), recommends Radiation Protection procedures.

Procedure PPM 11.2.2.14, Revision 4, Section 4.1.11, states, in part, that the licensee is to DETERMINE AND ENTER an effective dose rate for each craft on the H213 Panel (of the Passport Computer Program), based on the following:

  • Current and historical radiological conditions in the work area
  • Estimated locations and body positions of the workers during the task
  • Review of historical dose information corrected for current scope and conditions
  • Information obtained in Step 4.1.10 (obtain data on the actual or anticipated radiological conditions in the work area)

Contrary to the above, from May to June 2019 during Refueling Outage 24, the licensee failed to determine an effective dose rate for each craft based on information obtained in PPM, Step 4.1.10, and the historical data corrected for current scope and conditions.

Specifically, the licensee performed a validation radiological survey five days prior to commencement of the CRDM Replacement job and determined that dose rates were significantly higher than the historical data but did not base the effective dose rate for the job on these current radiological conditions by appropriately revising the dose estimate and work scope. The licensee specifically stated in their response to the NRC that they, decided to follow the contingency plan rather than revise the estimate, which does not align with the appropriate use of the contingencies, as stated in Section 3.9 of PPM 11.2.2.14, Revision 4.

At the time, it appears as though the licensee believed they were operating within the scope of their procedures.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 15, 2020, the inspectors presented the integrated inspection results to Mr. W.G. Hettel, Chief Nuclear Officer/Vice President Nuclear Generation, and other members of the licensee staff.

On July 27, 2020, the inspectors presented the Occupational Radiation Safety inspection results to Mr. R. Schuetz, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.04 Corrective Action Action Requests 409261, 409457, 403099, 400090, 404607, 405359, 407757,

Documents (ARs) 408822, 409196, 409593, 409594, 401237, 401287, 404112,

411017

Drawings M512-1 Flow Diagram Diesel Oil & Miscellaneous Systems 048

M512-3 Flow Diagram Diesel Oil & Miscellaneous Systems Diesel 041

Generator Building

M519 Flow Diagram: Reactor Core Isolation Cooling System 103

M520 Flow Diagram HPCS and LPCS Systems 105

M524-1 Flow Diagram Standby Service Water System 139

Procedures 10.27.87 RCIC Keepfill Instruments RCIC-PIS-1 and RCIC-PIS-34 - 012

CFT/CC

3.1.6F Instrument Rack Valve Line-Up Reactor Building 422 and 007

471 Elevations

PPM 1.3.29 Locked Valve Checklist 086

PPM 1.3.62 Use of Cable Ties (Tie Wraps) 007

PPM 1.3.81 Maintaining Plant Component Status Control 016

SOP-DG-DSA Diesel Starting Air Operations 016

SOP-DG1-LU Emergency Diesel Generator (DIV 1) Valve and Power 006

Supply Lineup

SOP-DG2-LU Emergency Diesel Generator (DIV 2) Valve and Power 007

Supply Lineup

SOP-DG2- Emergency Diesel Generator (DIV 2) Start 033

START

SOP-DG2-STBY Emergency Diesel Generator (DIV 2) Standby Lineup 023

SOP-DG3-LU High Pressure Core Spray Diesel Generator Valve and 009

Power Supply Lineup

SOP-DG3-STBY High Pressure Core Spray Diesel Generator Standby Lineup 019

SOP-HPCS-LU HPCS Valve and Breaker Lineup 004

SOP-HPCS- Placing HPCS in Standby Status 004

STBY

SOP-RCIC-LU RCIC Valve and Breaker Lineup 004

SOP-RCIC-STBY Placing RCIC in Standby Status 012

Inspection Type Designation Description or Title Revision or

Procedure Date

SOP-SW-LU Standby Service Water System Valve & Breaker Lineup 013

Work Orders 02162153, 02126439, 02135644, 02155492, 02156217,

2160505, 02132544

71111.05 Calculations FP-02-85-03 Combustible Loading Calculation 010

Corrective Action Action Requests 384793, 409481, 409497, 409505, 403382, 403385, 403450,

Documents (ARs) 403610, 403748, 405319, 405384

Fire Plans PFP-DG- Diesel Generator Building 004

BUILDING

PFP-RB-422 Reactor 422 006

PFP-RW-467 Radwaste 467 005

PFP-RW-501-507 Radwaste 501-507 005

PFP-TG-441-456 Turbine Generator 441-456 009

Miscellaneous Crew B Unannounced Backshift Drill 6/19/20 06/19/2020

Drill Report: Unannounced Backshift Drill 6/19/20 Scenario 06/19/2020

OS-002 Crew B

Drill Report: Unannounced Backshift Drill 8/26/2020 08/26/2020

Scenario TG-004 Crew E

Procedures 1.3.10C Control of Combustibles 022

1.3.57 Barrier Impairment 039

13.1.1 Classifying the Emergency 049

13.1.1A Classifying the Emergency - Technical Bases 034

4.FCP.1 FCP.1 Annunciator Panel Alarms 023

4.FCP.2 FCP.2 Annunciator Panel Alarms 016

ABN-FIRE Fire 041

Work Orders 02163070

71111.07A Calculations ME-02-92-231 Evaluation of Heat Exchanger Performance Data - DCW 001

ME-02-92-244 Minimum Heat Transfer Rate Required for DCW Heat 000

Exchangers A & B

ME-02-92-245 RHR Heat Exchanger Tube Side Flowrate and Inlet 000

Temperature Evaluation

Corrective Action Action Requests 391148, 391160, 391175, 398502, 411270, 411411

Documents (ARs)

Engineering 17432, 12442

Inspection Type Designation Description or Title Revision or

Procedure Date

Changes

Miscellaneous MOT-HX-1-1 Maintenance Optimization Template: Heat Exchangers 013

Procedures 8.4.62 Thermal Performance Monitoring of DCW-HX-1B1 and 009

DCW-HX-1B2

Work Orders 02059477, 02059478, 02103773, 02103774, 02132409

71111.11Q Corrective Action Action Requests 408746, 408747, 409496, 410023, 410112, 410534, 410833,

Documents (ARs) 411186, 411193, 411194, 411197, 410801

Miscellaneous AOM-T Roll-up Comments: Cycle 20-04 000

Crew E 4.0 Critique Summary LR002492 07/27/2020

Reactivity Control Plan September 26, 2020, Sequence 09/15/2020

Exchange and Scram Time Testing

Control Rod Withdrawal Deviation Sheet 09/03/2020

LR002492 Cycle 20-4 Evaluated Scenario 000

Procedures 13.1.1 Classifying the Emergency 049

13.1.1A Classifying the Emergency - Technical Bases 034

3.2.6 Power Maneuvering 015

3.3.1 Reactor Scram 066

5.1.1 RPV Control 022

5.1.2 RPV Control - ATWS 026

ABN-FWH- Feedwater Heater High Level Trip 007

HILEVEL/TRIP

ABN-POWER Unplanned Reactor Power Change 016

ABN-ROD Control Rod Faults 031

OI-09 Operations Standards and Expectation 079

SOP-CR- Control Rod Movement 004

MOVEMENT

SOP-RRC- Reactor Power Change with RRC Flow Controllers - Quick 005

FLOW-QC Card

TSP-CRD-C101 CRD Scram Timing with Auto Scram Timer System 029

Work Orders 02146065, 02159885

71111.12 Corrective Action Action Requests 408595, 409141, 409156, 409175, 409181, 409215, 409224,

Documents (ARs) 409252, 409260, 409261, 409303, 409313, 408822, 406409,

407757, 409196, 332149, 336395, 410488, 410779, 410800,

Inspection Type Designation Description or Title Revision or

Procedure Date

410835, 410865, 410882, 410883, 410913, 410831, 410880,

410981, 411002, 411017, 411019, 411024, 411044, 411050,

411052

Miscellaneous Instrument Master Data Sheet: RCIC-PS-9B 007

BIP 19-0389 Barrier Impairment Permit for ISP-HPCS-X302 (Calibrate 07/29/2020

HPCS-FIS-6)

BIP 20-0344 Barrier Impairment Permit for Inspection of HPCS-FT-5 07/27/2020

Penetration Seal

ISP 20-0136 Ignition Source Permit for Work Order 02140140 09/17/2020

Procedures 1.3.57 Barrier Impairment 039

1.5.11 Maintenance Rule Program 016

10.16.1 Standby Service Water Pump Overhaul 017

10.2.10 Fastener Torque and Tensioning 028

10.25.4 Lubrication and Inspection of Limitorque MOVS 029

10.27.85 RCIC Turbine Trip on High Turbine Exhaust Pressure B 002

Calibration

ISP-HPCS-X302 HPCS Flow Rate Low Minimum Flow - CC 009

OSP-ELEC-M703 HPCS Diesel Generator Monthly Operability Test 069

OSP-HPCS/IST- HPCS System Operability Test 059

Q701

OSP-SW-M103 HPCS Service Water Valve Position Verification 026

SOP-RCIC-FILL RCIC Fill and Vent 020

SOP-RCIC-OIL RCIC Turbine or Pump Oil Fill and Prime 010

SYS-4-22 Maintenance Rule Program 015

Work Orders 02080473, 02126090, 02120692, 02128969, 02054567,

2089993, 02045665, 02123430, 02153118, 02131518,

2162153, 02156590, 02160239, 02135829, 02136041,

2152183, 02156156, 02156217, 02160285, 02160286,

2134251, 02134544, 02135557, 02140140, 02149943,

2152938, 02153201, 02158395, 02122134, 02139803,

2140165, 02143796, 02146121, 02146129, 02153512

71111.13 Corrective Action Action Requests 409466, 409497, 409505

Documents (ARs)

Miscellaneous FPF-2.4-28 Standpipe and Hose Systems, Evaluation of Long Hose 000

Inspection Type Designation Description or Title Revision or

Procedure Date

Lengths Using a PROTEK #379 Nozzle

FPSI 20-0169 Fire Protection System Impairment Permit for Inst. Rack E- 08/02/2020

IR-P027 Door R415

FPSI 20-0170 Fire Protection System Impairment Permit for Inst. Rack E- 08/02/2020

IR-P021 Door R316

FPSI 20-0171 Fire Protection System Impairment Permit for Inst. Rack E- 08/02/2020

IR-P009 Door R216

FPSI 20-0172 Fire Protection System Impairment Permit for SW B 08/02/2020

Pumphouse Door G201

FPSI 20-0173 Fire Protection System Impairment Permit for Door C408 08/02/2020

Upper Corridor Outside CR

FPSI 20-0174 Fire Protection System Impairment Permit for Door C223 08/02/2020

Vital Island General Area

FPSI 20-0175 Fire Protection System Impairment Permit for Emergency 08/02/2020

Chiller Room Door C502

FPSI 20-0176 Fire Protection System Impairment Permit for Comm. RM 08/02/2020

RM C503 Door C505

FPSI 20-0177 Fire Protection System Impairment Permit for Instrument 08/02/2020

Shop RM RM C510 Door C511

FPSI 20-0178 Fire Protection System Impairment Permit for Div 2 HVAC 08/02/2020

Room Door C508

FPSI 20-0179 Fire Protection System Impairment Permit for Remote 08/02/2020

Shutdown Room Door C240

FPSI 20-0180 Fire Protection System Impairment Permit for SM-8 08/02/2020

Switchgear Room Door C242

FPSI 20-0181 Fire Protection System Impairment Permit for Div 2 RPS RM 08/02/2020

Door C222

FPSI 20-0182 Fire Protection System Impairment Permit for Div 2 Battery 08/02/2020

Charger RM C224 Door C238

FPSI 20-0183 Fire Protection System Impairment Permit for Div 2 Battery 08/02/2020

Room Doors C217 or C238

FPSI 20-0184 Fire Protection System Impairment Permit for Waste Tank 08/02/2020

Floor Area RM C106 Door C109

FPSI 20-0185 Fire Protection System Impairment Permit for South Valve 08/02/2020

Inspection Type Designation Description or Title Revision or

Procedure Date

RM RM R405 Door R407

FPSI 20-0186 Fire Protection System Impairment Permit for MCC Div 2 08/02/2020

South RM R410 Door R408

FPSI 20-0187 Fire Protection System Impairment Permit for RCIC Room 08/02/2020

Door R5 RM R015

FPSI 20-0188 Fire Protection System Impairment Permit for Div 2 MCC 08/02/2020

ROOM Room R612 Door R607

FPSI 20-0189 Fire Protection System Impairment Permit for Inside Door 08/03/2020

R217

FPSI 20-0190 Fire Protection System Impairment Permit for B RHR Pump 08/03/2020

Room Doors R7/7A Room R006

FPSI 20-0191 Fire Protection System Impairment Permit for DFO Day Tank 08/02/2020

RM Door D103 RM D111

FPSI 20-0192 Fire Protection System Impairment Permit for DG 3 Div 2 08/03/2020

DFO TK Door D110 Room D102

FPSI 20-0193 Fire Protection System Impairment Permit for DG2 Diesel 08/02/2020

Room Door D104 RM D110

Procedures 1.3.10 Plant Fire Protection Program Implementation 034

1.3.76 Integrated Risk Management 060

1.3.83 Protected Equipment Program 031, 032

1.3.85 On-line Fire Risk Management 006

ESP-B12-M101 Monthly Battery Testing 125VDC E-B1-2 007

ESP-BAT-W101 Weekly Battery Testing 016

OSP-ELEC-W101 Offsite Station Power Alignment Check 032

Work Orders 02156332, 02156554, 02163069, 02168650

71111.15 Calculations E/I-02-87-07 Calculation for Load Flow Voltage for Main Buses in AC 012

Distribution Systems

E/I-02-90-01 Low Voltage System Loading, Security System Loading and 016

Voltage Calculation

ME-02-92-43 Flow Reduction Factors Reactor Building 013

ME-02-95-25 Evaluation of Standby Service Water Capability 002

Corrective Action Action Requests 407977, 407978, 408057, 315816, 408422, 408487, 408559,

Documents (ARs) 408560, 408543, 408697, 409219, 408616, 408618, 408620,

408622, 408724, 408741, 407092, 409590, 409591, 409833,

Inspection Type Designation Description or Title Revision or

Procedure Date

409851, 409937, 410056, 410399, 408029

Drawings E504-1 Vital One Line Diagram 006

EWD-22E-039A Electrical Wiring Diagram Primary Containment Atmospheric 003

Control System CVB-V-1ST Front Disk

EWD-22E-048A Electrical Wiring Diagram Primary Containment Atmospheric 003

Control System CVB-V-1ST Rear Disk

M543-1 Flow Diagram - Reactor Bldg. Primary Containment Cooling 092

and Purging Systems

Engineering 8818 Critical Instrument Bus and Alternate Source Power 11/28/2011

Changes

Miscellaneous Position Paper for Operator Convenience 07/10/2020

Operations and Maintenance Manual 399.5.1, York 09/22/2004

Centrifugal Turbopak R-11

Technical position paper associated with AR 408029 07/14/2020

NRC Inspection Reports 05000327/2020010 and

05000328/2020010

Operations Log: July 1 - August 6, 2020 08/06/2020

Operator Logs: July 10 - 11, 2020 07/11/2020

213-05,7 Vacuum Relief Valve and Auxiliaries Owners Manual 005

MOT-CKV-1-1 Check Valves Maintenance Optimization Template 017

Procedures 1.10.11 Technical Assessments Supporting Reportability and 002

Reportability Evaluations

1.16.6B Voluntary Entry into Technical Specification Action 018

Statements, Licensee Controlled Specifications

Requirements for Operability

1.3.16 Issue Management 002

1.3.66 Operability Determination 034, 035

1.3.9 Temporary Modifications 056

10.25.85 Repair of Wet Well Vacuum Breaker Position Switches 012

4.800.C1 800.C1 Annunciator Panel Alarms 031

ABN-ELEC-INV 120 VAC Critical Distribution System Failures 017

OSP-CVB/IST- Vacuum Breaker Operability 016, 017,

M701 018

Inspection Type Designation Description or Title Revision or

Procedure Date

OSP-ELEC-W102 Electrical Distribution Subsystem Breaker Alignment and 031

Power Availability Verification

SOP-CN-CONT- Containment Vent, Deinert, Purge, and Ventiliating 027

VENT

SOP-CN-OPS Containment Nitrogen System Operations 010

SOP-ELEC-IN3- IN3 Operations 013

OPS

SWP-OPX-01 Operating Experience Program 001

Work Orders 02155686, 02164937, 02156935, 29155613, 02131744,

2145562, 02042666, 02043384, 02156764, 02157084,

2157376, 02157626, 02167660, 29156112, 29156133

71111.19 Corrective Action Action Requests 408595, 409141, 409156, 409175, 409181, 409215, 409224,

Documents (ARs) 409252, 409260, 409261, 409303, 409313, 407977, 407978,

408057, 408466, 408525, 408604, 408639, 408654, 408708,

408761, 408842, 408890, 408947, 408976, 409068, 409107,

409697, 409726, 409842, 409899, 403782, 404272, 404607,

406649, 354988, 355024, 342466, 400409, 410882, 410927,

410928, 410929, 410930, 410931, 410934, 410947, 410949,

410951, 410964, 410965, 410966, 411107

Miscellaneous Operations Department Narrative Logs for 08/05/2020

BIP 19-0389 Barrier Impairment Permit for ISP-HPCS-X302 (Calibrate 07/29/2020

HPCS-FIS-6)

BIP 20-0344 Barrier Impairment Permit for Inspection of HPCS-FT-5 07/27/2020

Penetration Seal

Procedures 1.3.57 Barrier Impairment 039

10.2.13 Approved Lubricants 077

ABN-HVAC HVAC Trouble 017

ISP-HPCS-X302 HPCS Flow Rate Low Minimum Flow - CC 009

OSP-CCH/IST- Control Room Emergency Chiller System B Operability 045

M702

OSP-CONT-C101 Suppression Pool Average Water Temperature Surveillance 002

OSP-ELEC-M701 Diesel Generator 1 -Monthly Operability Test 060

OSP-ELEC-M703 HPCS Diesel Generator Monthly Operability Test 069

OSP-HPCS/IST- HPCS System Operability Test 059

Inspection Type Designation Description or Title Revision or

Procedure Date

Q701

OSP-RCIC-M101 RCIC Fill, Flow Controllers, and Valve Lineup Verification 019

OSP-RCIC/IST- RCIC Operability Test 063

Q701

OSP-RCIC/IST- RCIC Valve Operability Test 044

Q702

OSP-SW-IST- Standby Service Water Loop B Operability 035

Q702

OSP-SW-M102 Standby Service Water Loop B Valve Position Verification 043

OSP-SW-M103 HPCS Service Water Valve Position Verification 026

PPM 1.5.1 Surveillance Testing Program 043

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC 005

SHUTDOWN Shutdown

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC Start 017

START

SOP-RHR-SPC Suppression Pool Cooling/Spray/Discharge/Mixing 008

SOP-SW- Standby Service Water System Shutdown 002

SHUTDOWN

SOP-SW-START Standby Service Water System Start 008

SOP-SW-STBY Placing Standby Service Water in Standby Status 003

SWP-TST-01 Post Maintenance Testing Program 017

Work Orders 02080473, 02126090, 02120692, 02128969, 02054567,

2089993, 02045665, 02123430, 02153118, 02131518,

2162153, 02156590, 02160239, 02164274, 02138105,

2124750, 02154772, 02159891, 02915593, 02124750,

2157518, 02167155, 02150225, 02156936, 02160285,

2161982, 02134544, 02134781, 02135563, 02140140,

2147071, 02158410, 02140165, 02153512

71111.22 Calculations E/I-02-91-03 Calculation for Division 1 and 2 and 3 Diesel Generator 021

Loading

Corrective Action Action Requests 291562, 382935, 410110, 410392, 410513, 410610, 410611,

Documents (ARs) 410618, 410724, 410735, 410803, 410823, 409695, 409856,

409857, 409866, 411040, 411419

Drawings 204-00,88,1 Condensate Storage Tank 1A General Plan Detail and Parts 007

Inspection Type Designation Description or Title Revision or

Procedure Date

List

204-00,89,1 Condensate Storage Tank 1B General Plan Detail and Parts 007

List

Engineering 17708

Changes

Miscellaneous Condensate Storage Tanks A & B Inspection Videos 09/24/2020

Operations Department Narrative Logs for 08/10/2020

Procedures 10.25.48 Testing Molded Case Circuit Breakers 017

FLEX-01 FLEX Program 003

OSP-FLEX-Q704 Diesel Generator 4 Quarterly Surveillance 000

OSP-SGT/IST- SGT Valve Operability (System A) 010

Q701

PPM 1.5.1 Surveillance Testing Program 043

PPM 13.10.1 Control Room Operations and Shift Manager Duties 035

SWP-IST-01 ASME Inservice Testing 004

Work Orders 02160246, 02140807, 02140808, 02145984, 02168133

71114.06 Corrective Action Action Requests 410143, 410180, 410323

Documents (ARs)

Procedures 13.1.1 Classifying the Emergency 049

13.1.1A Classifying the Emergency - Technical Bases 034

13.10.2 TSC Manager Duties 035

13.10.6 Plant / NRC Liaison Duties 025

13.10.9 Operations Support Center Manager and Staff Duties 050

71124.01 Corrective Action Action Request 00320829, 00394339, 00394466, 00394579, 00395232,

Documents (AR) 00401615, 00403475, 00404828, 00405114, 00405278,

00409019, 00409248

Procedures 4.840.A3 840.A3 Annunciator Panel Alarms 020

HPI-0.19 Radiation Protection Standards and Expectations 019

HPI-12.96 RCA Access Restriction and Reinstatement 009

PPM 11.2.13.1 Radiation and Contamination Surveys 043

PPM 11.2.6.7 Special Dosimetry 019

Radiation M-20190517-34 RB 606 SFP Inventory Following R24 Fuel Inspections 05/17/2019

Surveys M-20190523-28 RB 606 SFP Inventory Following LPRM And Dry Tube 05/23/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

Replacement

M-20190530-20 RB 606 Removal Of Framatome Hawkeye Ring From Cavity 05/30/2019

M-20190531-4 RB 606 Hawkeye ring post decon/dose rate alarm followup 05/30/2019

M-20191024-7 RB 572 Monthly 10/24/2019

Radiation Work 30004256 R24 RF Wetwork, Invessel, SFP, DSP *HR* 001

Permits (RWPs) and Associated Tasks, Pre-Job Briefing, ALARA Plan

Self-Assessments 388465-02 10 CFR 20 Annual Program Review Snapshot Self- 03/15/2019

Assessment Report

401808-01 NRC Inspection Procedure 71124.01 Snapshot Self- 03/05/2020

Assessment Report

Work Orders 02109577-01 Calibrate/Repair Outage HP Portable Air Samplers 03/26/2019

2137805-01 Calibrate/Repair HP Portable Air Samplers 04/19/2019

71124.02 Corrective Action Action Request 00371557; 00373396; 00374279; 00389652; 00393863;

Documents (AR) 00393987; 00394579; 00395197; 00395232; 00395371;

00395843; 00396076; 00398464; 00401910; 00404386;

00405192; 00405201; 00409249

Miscellaneous 2019 CGS Refueling Outage 24 CRE Report 2019

2017 CGS Refueling Outage 23 CRE Report 2017

EDEX Assessments for RWPs 30004258, 30004447,

30004470

Procedures GEN-RPP-01 ALARA Program Description 009

GEN-RPP-02 Radiological Planning and Control Process 034

GEN-RPP-13 Senior Site ALARA Committee 013

PPM 11.2.2.11 Exposure Evaluations for Maintaining TEDE ALARA 009

PPM 11.2.2.14 Radiological Planning and Reviews 004

PPM 11.2.2.7 ALARA Procedure Analysis 012

PPM 11.2.2.8 ALARA Engineering Analysis 007

PPM 11.2.8.2 Radiation Work Permit Preparation and Use 002

Radiation Work 30004256 R24 Refuel Floor Wetwork Invessel, Spent Fuel Pool, and 001

Permits (RWPs) DSP - High Risk

30004258 R24 Wetwork/Reactor Dive Inspection (Divers) - LHRA/High 000

Risk

30004318 R24 CRDM Undervessel Remove and Replace - LHRA/High 000

Inspection Type Designation Description or Title Revision or

Procedure Date

Risk

30004319 R24 CRDM Undervessel Support - LHRA 001

30004328 R24 ST/VR/DCA/Rebuild Room Miscellaneous Work - High 000

Risk

30004336 R24 Drywell/Steam Tunnel Shielding Install/REM and 000

Support Tasks - LHRA

30004340 R24 DW/ST/VR OPS HC/LC, LLRT and Valve Lineups - 001

LHRA

30004347 R24 Drywell MSRV Maintenance - LHRA 000

30004350 R24 Steam Tunnel MSIV Maintenance and Refurb Tasks - 002

HRA

Self-Assessments 00388465-02 Annual Review of the Columbia Generating Station 03/15/2019

Radiation Protection Program that Fulfills the Requirements

of 10 CFR 20.1101(c) for CY2018

401806 Pre-Inspection (71124.02) ALARA Snapshot Self- 02/28/2020

Assessment

2838 Annual Review of the Columbia Generating Station 03/25/2020

Radiation Protection Program to Meet 10 CFR 20.1101(c)

Requirements

71124.03 Corrective Action Action Request 00386503, 00387127, 00387272, 00387564, 00388740,

Documents (AR) 00390148, 00400231, 00401759, 00403834, 00404159,

00404572, 00404573, 00404716, 00404977, 00405381,

00405882

Drawings SD000195 Radwaste Building HVAC 011

SD000201 Control Room, Cable Room, and Critical Switchgear Rooms 016

- HVAC

Miscellaneous CAM Locations and Potential Sources

Breathing Air Sample Analysis - SCBA Compressor 03/18/2020

Personal Self-Contained Breathing Apparatus qualified personal with 03/17/2020

Qualification Data qualification dates

(PQD)

Procedures GEN-RPP-05 Respiratory Protection Program Description 015

GEN-RPP-10 Use of Respiratory Equipment 012

HPI-15.1 Inspection and Storage of Respirators and Attachments 012

Inspection Type Designation Description or Title Revision or

Procedure Date

HPI-15.5 Set-up and Use of Bullard Air Line Filters 003

HPI-8.2 Quantitative Respirator Fit Testing Using the PortaCount 029

System

PPM 11.2.11.3 Issuance of Respiratory Equipment 017

PPM 11.2.15.11 Use and Certification of Portable Air Handling Units 015

PPM 12.5.36 Service Air Sampling 005

Self-Assessments 378162 Respiratory Protection Program Self -Assessment 03/12/2020

2740 71124.03 SnapShot Self-Assessment

Work Orders 0211048501 Sample Plant Breathing Air 01/30/2019

211048601 Sample Plant Breathing Air 04/25/2019

SCBA Inspections 02142336, 02147151, 0215236, 02133230

71124.04 Corrective Action Action Request 00339377; 00374271; 00382896; 00393990; 00393998;

Documents (AR) 00394156; 00394272; 00395067; 00395101; 00397889

Miscellaneous Summary of Internal Exposure (5/21/2018 to Present) 06/22/2020

Columbia Generating Station Scaling Factors 03/12/2018

Columbia Generating Station Scaling Factor 03/12/2018

Columbia Generating Station CRE/Source Term Reduction 2020

5-Year Plan

100518-0 NVLAP Ionizing Radiation Dosimetry Accreditation 01/01/2020

NRC Form 5 Declared Pregnant Workers Annual Dose Forms 2018-2019

Procedures 11.2.13.8 Airborne Radioactivity Surveys 019

11.2.15.13 Control of Personnel Skin and Clothing Contamination 004

11.2.4.5 Whole Body Counts and Daily Checks Using the 016

Renaissance FASTSCAN

11.2.4.6 In Vitro Bioassay Sampling and Analysis 003

GEN-RPP-06 Dosimetry Program Description 013

HPI-0.19 Radiation Protection Standards and Expectations 019

HPI-5.9 Evaluation of In-Vivo Bioassay Results Following a Potential 014

Intake

SWP-RPP-01 Radiation Protection Program 016

Radiation Work 30004447 2018 Reactor 606 Badger Testing 000

Permits (RWPs) 30004470 2019 Reactor 522 and Reactor 548 RWCU Flow - 000

LHRA/High Risk

Inspection Type Designation Description or Title Revision or

Procedure Date

Self-Assessments 00401801 Pre-Inspection Self-Assessment of the Columbia Generating 04/09/2020

Station Internal and External Dosimetry Programs

71151 Miscellaneous MSPI Cooling Water System Derivation Reports 09/02/2020

MSPI Emergency AC Power System Derivation Reports 09/02/2020

MSPI Heat Removal System Derivation Report 09/02/2020

MSPI High Pressure Injection System Derivation Reports 09/02/2020

MSPI Residual Heat Removal System Derivation Reports 09/02/2020

Control Room Operator Logs for 7/1/2019 to 6/30/2020

Procedures HPI-0.14 Assessing and Reporting NRC Occupational Exposure 006

Control Effectiveness Performance Indicator Data

Self-Assessments 387312 RETS/ODCM PI Verification Snapshot Self-Assessment 05/11/2019

Report

401807 Occupational Exposure Control Performance Indicator 02/11/2020

Snapshot Self-Assessment Report

71153 Corrective Action Action Requests 408616, 408618, 408620, 408622, 408724, 408741, 404829,

Documents (ARs) 410817

Drawings E504-1 Vital One Line Diagram 006

Engineering 8818 Critical Instrument Bus and Alternate Source Power 11/28/2011

Changes

Miscellaneous Operator Logs: July 10 - 11, 2020 07/11/2020

Position Paper for Operator Convenience 07/10/2020

Procedures 1.3.16 Issue Management 002

4.800.C1 800.C1 Annunciator Panel Alarms 031

ABN-ELEC-INV 120 VAC Critical Distribution System Failures 017

ABN-FWH- Feedwater Heater High Level Trip 007

HILEVEL/TRIP

ABN-POWER Unplanned Reactor Power Change 016

SOP-ELEC-IN3- IN3 Operations 013

OPS

Work Orders 02131744, 02169264, 02169265

2