IR 05000397/1986031

From kanterella
Jump to navigation Jump to search
Enforcement Conference Rept 50-397/86-31.Topics Discussed: Violations Identified in Insp Rept 50-397/86-12 Re Equipment Qualification Program,Violations in Insp Rept 50-397/86-11 & Repeat Violations in Control of Combustible Matls
ML20206U192
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/17/1986
From: Johnson P, Qualls P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20206U176 List:
References
50-397-86-31-EC, NUDOCS 8610070346
Download: ML20206U192 (16)


Text

.. .

, '--5 g

'

'

3, (

M - s a

i a

's .U. S.. NUCLEAR REGULATORY COMMISSION

REGION V

-

,

.

'

Report N /86-31 Docket No.' '50-397 -

,

<

License N ,NPF-21 ,

~

Licensee: ', Washington'Public Power Supply' System P.~ 0. Box 968 .

Richland, Washington 99352 -

"

l-

'

Facility Name: WNP-2 '

Hanford, Washington '

~

Inspection condu d: Augu 28, 1986 Prepared by: T!/7 [8b

" M. Qualls, eactor Inspector Date Si ned Approved By: Gwehyt / 7 (fb P.~ John 6 , Chief Da'e t Signed Reactor rojects Section 3 Summary:

An Enforcement Conference was held on' August 28, 1986. The following topics were discusse . Apparent violations identified during the inspection of the WNP-2 Nuclear Plant's Equipment Qualification Program. .(Inspection Report N /86-12). Apparent violations identified during the Region V team inspection (Inspection Report No. 50-397/86-11). Repeat violations in control of combustible materials (Inspection Report 50-397/86-22) and in tool control (Inspection Reports 50-397/85-20 and 86-21). Natters of concern to the NR The recent Systematic Assessment of Licensee Performance (SALP) for the WNP-2 facility was also discusse .

4

.

.

,

.

G DETAILS 4 Enforcement Conference Participants NRC Participants B. Martin,. Regional Administrator H. Faulkenberry, Deputy Regional Administrator Kirsch, Director, Division of Reactor Safety and Projects

'

, Chaffee, Deputy Director, Division of Reactor Safety and Projects

"'

A. Johnson, RV Enforcement Officer F. Wenslawski, Chief, Emergency Preparedness and Radiological Protection Branch

, ,

P. Johnson, Chief, Projects Section III

'

G. Yuhas, Chief, Facilities Radiological Protection Section R. Dodds, WNP-2 Senior Resident Inspector .

R. Barr, WNP-2 Resident Inspector s J..Burdoin, Reactor Inspector D. Willett, Reactor Inspector P.-Qualls, Reactor Inspector WPPSS Participants -

C. R. Duffie, Executive-Board D. Mazur, Managing Director J. Shannon, Deputy Managing Director

, Martin, Assistant Managing Director, Operations Burn, Director, Engineering Glasscock, Director, Licensing and Assurance Bouchey, Director, Support Services C. Powers, WNP-2 Plant Manager J. Eaker, WNP-2 Assista1t Plant Manager D. Feldman, WNP-2 Plant QA Manager R. Kurzawa, Bargaining Unit Representative State of Washington B. Miller, EFSEC - Certificate Compliance Commission l

M. Mills, Compliance Manager i Bonneville Power Administration

D. Williams, Nuclear Engineer

.! Enforcement Conference

On August 29, 1986, an enforcement conference was held at the NRC Region V office in Walnut Creek, California, with the individuals listed as
identified in paragraph 1, above. The conference was in regard to

'

apparent violations identified during the equipment qualification team inspection and the recent Region V team inspection, and the control of l combustible materials as discussed in Inspection Report 86-22. The

1

- _ . _ . . - - _ . , - - _ , _ . . . _ , _ - _ . , _ _ _ . _ . . _ ,_ _ - . _ _ _ , - . . _ _ . _ . _ - - -

s

.

conference was announced in a letter to the licensee dated August 25, 198 Mr. Jack Martin informed the licensee of the outline and scope of the conference. Messrs. Kirsch, Dodds and P. Johnson then outlined for the licensee the various specific violations and concerns which were to be the subject of the conference. These included: Repeat violations in the areas of:

1) Control of combustible materials 2) Control of measurement and test equipment including apparent violations in the control of HP test and measurement equipment 3) Tool inventory, tool control and cleanliness control invclving work on open systems Apparent violations from the Equipment Qualification team inspection includtng:

1) Missing conduit plugs in Rosemount Model 1181 pressure transmitters 2) Limitorque motor operated valve operator deficiencies 3) Equipment Qualification of Rockbestos cables 4) Improper documentation of Westinghouse containment penetration tests 5) Several procedural deficiencies Violations identified during the June 1986 Region V team inspection

.

. NRC concerns based on the above violations, including:

1) The effectiveness of licensee corrective actions for violations and identified deficiencies 2) A perceived difficulty in implementing plant procedures 3) NRC's perception that the licensee QA/QC organization has strained resources, is understaffed, has no detailed plan to review corrective maintenance and needs to be more aggressive in inspecting corrective maintenance Mr. J. B. Martin emphasized the need for effective attention to identified weaknesses and adherence to facility procedures. He also stressed the importance of active management involvement and followup to ensure that management's expectations are properly understood and implemented by Supply System personne Mr. A. Johnson then discussed the NRC enforcement polic Mr. J. Baker proposed and the NRC agreed to a meeting at an unspecified later date between the NRC and licensee technical experts on Equipment Qualification issue Mr. Baker also stated the Dow Corning Silicon Foam had been applied inside the Rosemount transmitters in March 1986 such that they met equipment qualification requirements. When queried by NRC representatives concerning the acceptability and testing of this method,

. .~ , . . _- - . . .

.

.

i -

.

3,

..g.

i,'

,

-

licensee management indicated that~this was testedLand acceptable, and that additional written information would be provide Mr. Di. Mazur.then stressed the Supply System's commitment to ensure that

. operation of WNP-2 is safe, effective, and consistent with NRC

~

l requirement Messers C. . Powers, J. Baker and D. Feldman dis' cussed the licensee's plan for long term program upgrades'as outlined in the attachment.

j Mr. Mazur then 'gave the concluding remarks for the license Mr. J. B. Martin noted that the enforcement conference, as conducted, had also encompassed'the scope of matters to be discussed regarding the

,

"

latest Systematic Assessment of Licensee Performance (SALP) for WNP-2, and that a separate meeting would not be. convened for that purpose. He

,

then made concluding remarks, and the meeting was adjourne *

+

-

w i e' 5

.

f

,

j.

!

4-

I l

- -- ~ , ~ , - - - - .

, ,, ,,, . ~ . . ,,..,...,-a . - , . - - . , , , - . . , . - - ., , ~, - - - - , ,

.... .

.

ENFORCEMENT CONFERENCE WASHINGTON PUBLIC POWER SUPPLY SYSTEM AUGUST 28, 1986 OPENING REMARKS

.

I ENFORCEMENT CONFERENCE ISSUES

- Management Involvement

- Housekeeping

- Fire Protection -

- Responsiveness to Identify Deficiencies

- Quality Control Program II MANAGEMENT INVOLVEMENT OVERVIEW I SPECIFIC IN-LINE MANAGEMENT MEASUREMENT CONTROL

- Housekeeping

- Fire Protection (transient combustion control)

- Measurement and Test Equipment

- Tool Control

!

! QUALITY ASSURANCE FEEDBACK

-

Independent Informal Feedback

- Surveillance Deficiency Reporting

- Minimum Quality Control Inspection Program V SUMMARY REMARKS l

.

- - , -

- , , , , . - - - - , - ,--, ,- - _ , , , - - , - e en-,-----r - - - - , , w--,, n,, - - - - - a- - - - - - - - , -- _ _

s. .

'

o

-

~

I ENFORCEMENT CONFERENCE ISSUES

.

o Management Involvement in Plant Operations o Housekeeping Performance

'

o Fire Protection Control of Transient Combus-tibles o Responsiveness to Identified Deficiencies o Minimum Quality Control Inspections of Cor-rective Maintenance Activities

>

e

.,

O e

. , . _ . . . . .. -._ - , -- - . . _ . ,._,.,--,-,..w- , . _ , _ , , , , . . _ _ . . , -----,..n,

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ .

_ _ _ -

..

.

II MANAGEMENT INVOLVEMENT OVERVIEW In-Line Management Measurement and Control

.

I I I l l Plant Expectation Obj ective/ l->l l El l- Impl ement ->l l

Defined  ; l ra l lAc eyed lI

% Quality Assurance Feedback / .

.

Management Initiatives to Improve Measurement and Control:

o Corporate Goals and Objectives Strive for Excellence

-

Periodic Directorate Reviews Focus on Performance F eedb ac k o Plant Specific Goals Formulated to Achieve Corporate Goals

- Periodic Plant Department Reviews Focus on Perform-ance o Organizational Realignments to Increase Supervision of Major Work Control Functions

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

..

.

.

.

OBJECTIVE: HOUSEKEEPING (clean "under the carpet")

PROGRAM / IMPLEMENTATION CHANGES:

o Weekly inspections '-

o Identify individual floor assignments / account-ability o More involvement by first-li ne supervisor / foreman to ensure proper housekeeping during and after a job '

o Formal i ze pl an s to hire temporary laborers with adequate Health Physic's covercge to support cleanup / decontamination of the Plent o Issue management expectation letter along with shop talks to clearly define our expectations to si te employees FEEDBACK:

o Monthly inspections by Plant Manager's Office with

" concern" expert, i.e., fire protection, equipment qualification,- inspect inside electrical gear, M&TE, administrative processes, NRC, et o Unannounced periodic inspections by corporate officials o Plant Manager's Office will tour other Region V Plants to identify potential " good practices" which can be applied to WNP-2

.

--, . , - ,, ,----r- - - - ~ - + - ~ --m n-- --

. ... _. _. ..._ __ -__ _ _ ._

.. .

.

OBJECTIVE: FIRE' PROTECTION (transient combustion control)

PROGRAM / IMPLEMENTATION CHANGES:

o Inspection identified in housekeeping o Reevaluation of program requirements o Actively determine reason for error:

o Knowledge --

train

.

o Lack of commitment --

discipline o Support Service Contractor --

fee

,

FEEDBACK:

o Weekly / monthly inspections o Bi-weekly inspections by Fire Protection Engineer with required responses by violators

.

l

..-

I

. _ . _ _ _ _ _ _ , , . _ . _ _ . . . _ _ . , _ , _ . . . , . . _ .y . . - , , , _ . _ . , , , _ _ , _ - , . . . _ . _ _ . _ _ _ _ _ . _ , _ _ _ _ _ _ _ . _ , _ _ _ . , _ . _ , -

.

. _ -_ . -

% .

.

OBJECTIVE: TOOL' CONTROL

i t

PROGRAM / IMPLEMENTATION CHANGES:

! o Tool crib attended 24-hours a day --

0 Color coded tools -

o Personalized tool chits --

one tool = one chit

-.

FEEDBACK:

o Plant inspections o Periodic audit of outstanding tool chits

<

h

!

$

i l

.

4

.

-w ---wr< n. w--.,- u-m - n_ v. ,_ .----we,-,_ _ - - ~~,-----n--,n -ww.w.--,- g- - r- m y= yn-,-

, _ _ ._ _ ____ . _

,- .

.

.

OBJECTIVE: MEASUREMENT AND TEST EQUIPMENT (M&TE)

PROGRAM / IMPLEMENTATION CHANGES:

o All M&TE activities consolidated under a single -

supervisor o Maintenance Engineer hired to oversee day-to-day operations and track compliance o Computerized check-in/ check-out program o M&TE traveler card developed o Administrative procedure revised to clearly iden-ti fy responsibili ties o Tool crib attended 24-hours a day o Verification of M&TE inventory FEEDBACK:

o Plant inspections a Weekly report'of discrepancies I

.

O

_ _ _ _ _ _ _ _ _ . _ _ _ . _ -

_ _ _ _ _ __

. .

,

.

QUALITY ASSURANCE PROGRAM L9PROVEMENTS PERFORMANCE FEEDBACK:

0 ENHANCE QA SORVEILLANCE PROGRAM TO INCLUDE ROUTINE OBSERVATION OF MAINTENANCE WORK ACTIVITIES WITH IMMEDIATE FEEDBACK TO PERFORdERS AND/OR SUPERVISIO (10-15-86)

.

9 IMPLEMENT A MONITORING PROGRAM OF PLANT INITIATIVES AND IMPROVEMENT PROGRAMS TO PROVIDE DIRECT FEEDBACK TO PLANT MANAGEMENT ON EFFECTIVEWES (9-30-86)

  1. ,

PLANT OVERVIEA : a if PLANT MAN AGEdENT -+- PdOGR Ad >-IMPLEMENTATION + d0ALS INITIATIVE ,

L JUALITY ASSURANCE V w-- + PERFORMANCE *

iiONITORING

_._. _ _ _ . - _ - _ __

. - . . _ _ _ _ . _ _ _ _ . _ _ _ _ _ ___ __ __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.. .

,

.

WNP-2 PLANT QA QUALITY CONTROL EXISTING PROGRAM CONSISTS OF:

i l

l INSPECTION:

.

A PROGRAM 0F HARDWARE INSPECTIONS TO VERIFY COMPLIANCE TO INSTALLATION PROCEDURES AND DESIGN REQUIREMENT DETAILED INSPECTION PLANS FOR MODIFICATION ACTIVITIES ARE FORMALLY ESTABLISHED EQUIVALENT TO CONSTRUCTIO CORRECTIVE MAINTENANCE INSPECTIONS ARE RANDOM WITH LEVEL OF INSPECTION BASED ON QUALITATIVE ATTRIBUTE DOCUMENT RE11ER:

REVIEWS OF WORK 00Cul1ENTS TO DETERMINE QC INVOLVEMENT Ai10 PLAN IllSPECTION ACTIVITIE _

,

.

,

.

QUALITY ASSURANCE PROGRAti IMPROVEMENTS PLANT RESPONSIVENESS TO QA/QC CONCERNS:

8 REFORMAT MONTHLY REPORT TO HI-LITE QA/QC CONCERNS AWD PROVIDE FOLLOWUP STATUS OF PREVIOUS CONCERNS TO PLANT MANAGEMENT ANO LICENSING & ASSURANCE MANAGEMEN (9-15-d6)

,

~ ~-

9 INCREASE LICENSING AND ASSURANCE MANAGEMENT IdVOLVEMENT IN DAILY WNP-2 PLANT QA ACTIVITIE (9-1-86)

e IMPROVE COMMUNICATIONS BETWEEN PLANT QA AND PLANT MANAGEMENT REGARDING QA SURVEILLANCE DEFICIENCIE (9-IS-dd)

,

I

.

1

%

. , - - - . - - - - , , , - - -

, - - - - - - - ., ., - - . - - - . . - , - - .-, -,--,-.---n- . , - , . - , , - . . . . . - - - - . , -

-

. - . _ , - - . , _ , , , , _ - . ._

_ _ _ _ _ _

s .

.

QUALITY CodTROL PROGRAM IWPROVEMENTS INSPECTION OF CORRECTIVE MAINTENANCE:

e DEVELOP A BASELINE Cd INSPECTION PROGRAM FOR CRITICAL PLANT COMPONENT (11-16-86)

e REFINE INSPECTION ATTRIBUTES APPLIED TO CORRECTIVE MAINTENANC (2 YEAR PHASE-IN STARTING 2-1-87)

e DEVELOP A SAMPLING INSPECTION PROGRAM FOR OTHER-THAN-CRITICAL COMPONENT (FINALIZE BY 9-15-87)

e PROVIDE INTERIM BASELIdE INSPECTION AND ATTdIBUTES FOR CORRECTIVE MAINTENANC (9-1-36) .

INSPECTION OF PREVENTIVE MAINTENANCE:

e ENHANCE EXISTING QUALITY CONTROL INSPECTION PROGRAM FOR IMPORTANT PREVENTIVE MAINTENANC (4-1-87)

QUALITY CONTROL PLANNING AND EFFECTIVENESS e IMPROVE EFFICIENCY AND EFFECTIVENESS OF THE QUALITY CONTROL GROUP BY SEPARATING INSPECTION PLANNING AND MONITORING FROM INSPECTION PERFORMANC (12-1-dd)

.

%

__ _ . , . _ _ . _ . . . _ . _ . _ _ _ . _ ._, , -

. . _ . _ , . _ . _ . , _ -.-

- _-___ ____ - ____

- _

  • .

,,

d

.

.

J

<

V SgNMARY REMARKS o Involve Senior Management Representative More Frequently in WNP-2 Activities l

0 Provide Periodic Feedback to NRC Regional Management on Management Effectiveness .

i I

<

.

$

.,

a - -

_ _ _ _ . _