IR 05000395/2017403

From kanterella
Jump to navigation Jump to search
NRC Material Control and Accounting and Inspection Report 05000395/2017403 (Public)
ML17201Q116
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/20/2017
From: Masters A
NRC/RGN-II/DRP/RPB5
To: Lippard G
South Carolina Electric & Gas Co
References
IR 2017403
Download: ML17201Q116 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 20, 2017 Mr. George A. Lippard, III Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065 SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000395/2017403

Dear Mr. Lippard:

On June 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Virgil C. Summer Nuclear Station. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2017, with you and other members of your staff.

The NRC inspector did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Enclosure transmitted herewith contains SUNSI material. When separated from the Enclosure this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Anthony D. Masters, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-395 License No. NPF-12 cc w/encl.: See page 3 cc w/o encl.: Distribution via ListServ cc w/encl.:

Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065 SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000395/2017403 July 20, 2017 DISTRIBUTION:

M. Kowal, RII S. Price, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ADAMS ACCESSION NO.: ML17201Q111 (Cover letter w/enclosure)

ADAMS ACCESSION NO.: ML17201Q116 (Cover letter)

Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By:

Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By:

OFFICE RII:DRP RII:DRP RII:DRP RII:DRP NAME JReece SNinh BBishop AMasters DATE 7/18/2017 7/18/2017 7/18/207 7/20/2017 OFFICIAL RECORD COPY