UNITED STATES August 14, 2018

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2NRC INTEGRATED INSPECTION REPORT 05000373/2018002; 05000374/2018002 AND EXERCISE OF ENFORCEMENT DISCRECTION

Dear Mr. Hanson:

On June 30, 2018, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your LaSalle County Station, Units 1 and 2. On July 9, 2018, the NRC inspectors discussed the results of this inspection with Mr. W. Trafton and other members of your staff. The results of this inspection are documented in the enclosed report.

A violation of the licensees current site-specific licensing basis for tornado-generated missile protection was identified. Because this violation was identified during the discretion period covered by Enforcement Guidance Memorandum 15-002, Enforcement Discretion for Tornado Missile Protection Noncompliance and because the licensee was implementing compensatory measures, the NRC is exercising enforcement discretion by not issuing an enforcement action for the violation and allowing continued reactor operation.

Based on the results of this inspection, the NRC has identified three issues that were evaluated under the risk significance determination process as having very low safety significance (Green). The NRC has also determined that one violation was associated with these issues.

Because the licensee initiated condition reports to address these issues, the violation is being treated as Non-Cited Violation (NCV), consistent with Section 2.3.2 of the Enforcement Policy.

The NCV is described in the subject inspection report. Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at the LaSalle County Station. If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC resident inspector at the LaSalle County Station.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Billy Dickson, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Enclosure:

IR 05000373/2018002; 05000374/2018002 cc: Distribution via LISTSERV

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting an integrated quarterly inspection at LaSalle Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below. A Licensee-identified non-cited violation is documented in report section: Follow-up of Events and Notices of Enforcement Discretion.

List of Findings and Violations Failure to Implement a Preventative Maintenance Strategy for Residual Heat Removal Service Water Pump Shorting Relays Cornerstone Significance Cross-Cutting Report Section Aspect Mitigating Green None 71111.18 Systems FIN 05000373/2018002-01 Plant Closed Modifications A self-revealed Green finding of very low safety significance was identified for the licensees failure to implement a preventative maintenance (PM) strategy for the residual heat removal service water (RHRSW) pump shorting relays in accordance with procedure MA-AA-716-210, Performance Centered Maintenance (PCM) Process, Revision 11.

Specifically, a PCM template was issued in 2002 that required periodic as-found testing and calibration for control and timing relays, but a maintenance strategy was never implemented.

As a result, one of the normally closed contacts on the Unit 1 D RHRSW pump shorting relay developed a high contact resistance and prevented the Unit 1 D RHRSW pump from starting.

Failure to Follow Procedure and Perform Database Revision Review Requirements Cornerstone Significance Cross-Cutting Report Section Aspect Mitigating Green None 71153 Systems FIN 05000373/2018002-02 Follow-Up of Closed Events and Notices of Enforcement Discretion The inspectors identified a Green finding of very low safety significance for the licensees failure to follow station procedure NSWP-WM-03, Predefine Database Revisions,

Revision 0, for retiring station procedure LES-GM-108, Inspection of 480V Motor Control Center Equipment, that performed bus bar inspection on Division 3 motor control centers.

Specifically, instead of completing step 6.5 Database Revision Review Requirements, of NSWP-MW-03, to retire the bus bar inspections for Division 3 motor control centers the licensee retired the procure based solely on having previously retiring the bus bar inspections for Division 1 and Division 2 in 2002 without the required review.

Additional Tracking Items Type Issue Number Title Report Status Section LER 05000374/2017-004-00; Two Main Steam Safety 71153 Closed 05000374/2017-004-01; Relief Valves Failed Inservice 05000374/2017-004-02 Lift Inspection Pressure Test LER 05000373/2018-002-00 Damaged Bus Bar Identified 71153 Closed Potentially Affecting High Pressure Core Spray System EA 18-035 Licensee Implementation of 71111.15 Discussed Enforcement Guidance Memorandum 15-002,

Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance LER 05000373/2018-001-00; Unanalyzed Condition 71153 Closed 05000374/2018-001-00 Affecting Accident Mitigation for Tornado Generated Missile Protection Non-Conformance

TABLE OF CONTENTS

PLANT STATUS

INSPECTION SCOPES

................................................................................................................

REACTOR SAFETY

................................................................................................................

OTHER ACTIVITIES - BASELINE

.........................................................................................

INSPECTION RESULTS

..............................................................................................................

EXIT MEETINGS AND DEBRIEFS

............................................................................................ 16

DOCUMENTS REVIEWED

......................................................................................................... 16

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period.

Unit 2 began the inspection period at rated thermal power. On April 29, 2018, the unit was

down powered to 65 percent for ecomonic dispatch. The unit was returned to rated thermal

power on April 30, 2018. Later on April 30, 2018, the unit was down powered to 70 percent

for ecomonic dispatch. The unit was returned to rated thermal power on May 1, 2018. On

May 5, 2018, the unit was down powered to 90 percent for ecomonic dispatch. The unit was

returned to rated thermal power on May 6, 2018 and remained at or near rated thermal power

for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection

Summer Readiness (1 Sample)

The inspectors evaluated summer readiness of offsite and alternate alternating current (AC)

power systems.

71111.04Equipment Alignment

Partial Walkdown (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Unit 1 standby gas treatment system during maintenance on the Unit 2 standby gas

treatment system;

(2) Unit 2 high pressure core spray (HPCS) following room cooler maintenance window;

(3) Unit 1 reactor core isolation cooling system (RCIC) with HPCS inoperable and

unavailable; and

(4) Unit 1 A emergency diesel generator.

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 1

low pressure core spray system on June 28, 2018.

71111.05QFire Protection Annual/Quarterly

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Unit 1 Reactor Building, Elevation 740, fire zone 2F;

(2) Unit 2 Auxiliary Building, Elevation 731, Division 2 switchgear room, fire zone 4E4;

(3) Unit 1 Reactor Building, Elevation 673, fire zone 2I2;

(4) Unit 1, Elevation 710, Division 1 switchgear room, fire zone 4F1; and

(5) Unit 2, Elevation 6870, high pressure core spray switchgear room, fire zone 5D2.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated simulator Out-of-the-Box Evaluation, OBE 18-2-2, on

April 24, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated control room activities on May 20, 2018.

71111.12Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Unit 1 D RHRSW pump failure to start, unavailability tracking for LES-DC-103A/B; and

(2) Hydrogen recombiner Maintenance Rule availability criteria exceeded.

71111.13Maintenance Risk Assessments and Emergent Work Control (6 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Unit 1 online risk yellow due to B/C residual heat removal (RHR) pump room cooler fan

breaker replacement;

(2) Online work management risk assessment for downpower due to grid conditions;

(3) Unit 1 online risk orange risk due to Unit 1 motor-driven reactor feed pump maintenance

window in conjunction with thunderstorm warning;

(4) Unit 1 and Unit 2 online risk yellow due to replacemnent of the unit common diesel fuel

oil transfer pump breaker;

(5) Unit 2 online risk yellow for emergent work on B/C RHR pump room cooler coil; and

(6) Unit 1 and Unit 2 online risk yellow due to a severe thunderstorm warning.

71111.15Operability Determinations and Functionality Assessments (6 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) Unit 1 Division 3 bus 143-1 degraded phase on breaker 2B;

(2) Standby gas treatment upstream HEPA filter could not be tested;

(3) Unit 1 reactor core isolation cooling discharge piping void;

(4) Unit 1 safety relief valve snubber failed functional test;

(5) A train control room HVAC following downscale failure of C radiation monitor; and

(6) Unit 1 B/C RHR pump room cooler coil pipe patch.

71111.18Plant Modifications (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Operability Evaluation (OE)05-004, emergency lighting pack on cart; and

(2) Engineering Change (EC) 380786, multiple spurious operations modification for pumps.

71111.19Post Maintenance Testing (5 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 1 standby gas treatment system testing;

(2) Unit 2 HPCI room cooler testing;

(3) Unit 2 RCIC system testing;

(4) Unit 1 A RHR room cooler testing; and

(5) Unit 1 turbine stop valve #3 limit switch testing.

71111.22Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (4 Samples)

(1) LOS-DG-R0, common diesel generator, 0DG01K, twenty-four hour run surveillance;

(2) LIS-NB-219A, Unit 2 reactor vessel low water level alternate rod insertion/anticipated

transient without SCRAM instrument channel A&C calibration;

(3) LOS-RD-SR12, Unit 1 SCRAM insert times; and

(4) LOS-AA-W1, Technical Specification weekly surveillances.

In-service (1 Sample)

(1) LOS-LP-Q1, Unit 1 low pressure core spray system in-service test.

71114.06Drill Evaluation

Emergency Planning Drill (2 Samples)

(1) The inspectors evaluated a site emergency preparedness drill, initiated from the site

simulator with a licensed operator crew that staffed the Technical Support Center and

Operations Support Center on 5/30/2018; and

(2) The inspectors evaluated a site emergency preparedness drill, initiated from the site

simulator with a licensed operator crew that staffed Technical Support Center and

Operations Support Center on 6/6/2018.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification (2 Samples)

The inspectors verified licensee performance indicators submittals listed below:

(1) BI02: RCS Leak Rate Sample2 Samples (April 1, 2017 - March 31, 2018).

71152Problem Identification and Resolution

Semiannual Trend Review (1 Sample)

The inspectors reviewed the licensees corrective action program for trends that might be

indicative of a more significant safety issue.

Annual Follow-Up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1) Leak Detection Capabilities for RCIC Steam Supply.

71153Follow-Up of Events and Notices of Enforcement Discretion

Licensee Event Reports (5 Samples)

The inspectors evaluated the following licensee event reports (LERs) which can be

accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) LER 05000374/2017-004-00, -01 and -02, Two Main Safety Relief Valves Failed

Inservice Lift Inspection Pressure Test;

(2) LER 05000374/2018-001-00, Unanalyzed Condition Affecting Accident Mitigation for

Tornado-Generated Missile Protection Non-Conformances; and

(3) LER 05000374/2018-002-00, Damaged Bus Bar Identified Potentially Affecting High

Pressure Core Spray System.

INSPECTION RESULTS

71111.18Plant Modifications

Failure to Implement a Preventative Maintenance Strategy for Residual Heat Removal

Service Water Pump Shorting Relays

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green None 71111.18

Systems FIN 05000373/2018002-01 Plant

Closed Modifications

A self-revealed finding of very low safety significance was identified for the licensees failure

to implement a PM strategy for the RHRSW pump shorting relays in accordance with

procedure MA-AA-716-210, Performance Centered Maintenance (PCM) Process,

Revision 1. Specifically, a PCM template was issued in 2002 that required periodic as-found

testing and calibration for control and timing relays, but the maintenance strategy was never

implemented. As a result, the Unit 1 D RHRSW pump shorting relay developed a high

contact resistance on one of the normally closed contacts that prevented the Unit 1 D

RHRSW pump from starting.

Description:

On February 5, 2018, when operators attempted to start the Unit 1 D RHRSW pump from the

main control room, the pump immediately tripped. The licensee declared the system

inoperable and entered TS 3.7.1 for one RHRSW subsystem inoperable and TS 3.6.2.3 for

one suppression pool cooling subsystem being inoperable. Subsequent troubleshooting

determined that normally closed contact 3-7 on control relay 1E12-K300D indicated open

when it should have been closed. This caused the relay to block the start signal from the

main control room hand switch. However, the licensee still has the ability to start the pump

locally or from the remote shutdown panel. The licensee could also throttle the Unit 1 C

RHRSW pump to partially make up for the loss of Unit 1 D RHRSW flow to the heat

exchanger. The relay was replaced and the Unit 1 D RHRSW pump was declared operable

on February 6, 2018.

Normally, shorting relay 1E12-K300D does not prevent the RHRSW pump from starting. In

the event of a hot short due to a fire in the control room, the shorting circuit would open the

normally closed contact 3-7 and blocks a start signal to the RHRSW pump to prevent

damage to the pump. The licensee completed an equipment apparent cause evaluation and

determined that high resistance across contact 3-7 caused the failure of the 1 D RHRSW

pump to start. Additionally, the evaluation determined that EC 380786, MSO [Multiple

Spurious Operations] Mod for Pumps 1E12-C300C and D, implemented on January 9, 2012,

did not include a component classification for shorting relay 1E12-K300

D. Therefore, by

default, shorting relay 1E12-K300D had a run to failure PM strategy resulting in a buildup of

surface contamination and eventual failure of the pump to start.

The inspectors conducted a review of the RHRSW MSO modification performed by the

licensee under EC 380786. During this review, the inspectors noted that steps 7 and 8, of

CC-AA-102-F-10B, Plant Engineering Configuration Change Review Process, Revision 1,

Plant Engineering Configuration Change Review Process, that provide instructions to

classify new components and designate an appropriate PM strategy were annotated as

completed on April 25, 2011. However, the inspector concluded that the evaluation was

performed adequately. Had the shorting relays been classified in accordance with

MA-AA-716-210, Performance Centered Maintenance (PCM) Process, Attachment 1,

Component Classification, they would have been classified as critical per step 1.B as a relay

failure would result in a TS shutdown clock of 7 days or less. Further, the classification of

critical would have resulted in the development of a PCM template since a run to failure PM

strategy is not permitted by MA-AA-716-210 for critical components. The prevailing

guidance at the time of the modification for PCM templates associated with control and timing

relays required periodic as-found testing and calibration for control and timing relays on a

recommended periodicity of 6 to 8 years.

Corrective Actions: The licensee conducted extent of condition inspections for the Unit 1 and

Unit 2 RHRSW pump shorting relays, classified the shorting relays as critical components,

and implemented an 8-year as-found inspection and calibration PM template. Additionally,

the licensee verified that shorting circuits installed under a similar modification, EC 380792,

were properly classified and evaluated for appropriate PM strategy.

Corrective Action Reference: AR 4100844

Performance Assessment:

Performance Deficiency: The inspectors determined that the failure to implement a PM

strategy for RHRSW pump shorting relays in accordance with procedure MA-AA-716-210,

Performance Centered Maintenance (PCM) Process, was a performance deficiency.

Specifically the licensee did not implement a PCM strategy that required as-found testing and

calibration for the Unit 1 D RHRSW pump shorting relay, resulting in the pump failing to start

on February 5, 2018.

Screening: The inspectors determined the performance deficiency was more than minor

because it adversely affected the equipment performance attribute of the mitigating systems

cornerstone objective of ensuring the availability, reliability, and capability of systems that

respond to initiating events to prevent undesirable consequences. Specifically, the

performance deficiency resulted in the inoperability of the Unit 1 D RHRSW pump.

Significance: Using IMC 0609, Appendix A, The Significance Determination Process for

Findings At-Power, issued June 19, 2012, the finding was screened against the Mitigating

Systems cornerstone and determined to be of very low safety significance (Green) because

the answer to each of the screening questions was no.

Cross-cutting Aspect: No cross cutting aspect was assigned to this finding because the

inspectors determined the finding did not reflect present licensee performance.

Enforcement:

The inspectors did not identify a violation of regulatory requirements associated with this

finding.

71152Problem Identification and Resolution

Observation IP 71152Problem Identification and

Resolution

Annual Followup of Selected Issues: Leak Detection Capabilities for RCIC Steam Supply

The inspectors performed a selected review of the licensees correction action program

documents; specifically, AR 4091820, Non-Tech Spec Flow Switch Broke Causing RCIC

Isolation, and AR 1435575, Spurious Isolation of RCIC on High Steam Flow. The

inspectors performed walkdowns and verified the completion of and assessed the adequacy

of the corrective actions taken in response to a spurious closure signal from a RCIC steam

supply break detection system flow switch, 1E31-N007BA, which resulted in an unintended

isolation of the RCIC steam supply valve on January 9, 2018.

The inspectors review and evaluation was focused on the licensees corrective actions to

ensure that consideration of the extent of condition, generic implications, common cause, and

previous occurrences was taken and the licensee classified and prioritized the resolution of

the problem commensurate with safety significance. Of particular interest to the Inspectors

was the isolation of flow switch 1E31-N007BA by the licensee upon system restoration from

the unplanned period of inoperability on January 9, 2018, and the impact of this configuration

on the current licensing basis for the RCIC leak detection system.

The inspectors noted that the licensee had previously evaluated isolating 1E31-N007BA as

part of AR 1435575, assignment 12, Present Abandonment Option of 1E31-N007 Switches

to Plant Health Committee, on August 6, 2014. This evaluation concluded that the switches

were required to monitor an approximately 80 foot section of piping for breaks, and therefore

could not be abandoned. The inspectors discussed the conclusion of AR 01435575-12 with

the licensee. The licensee subsequently provided additional information, EC 623398,

1(2)E31-N007BA Flow Switch Evaluation, to support compliance with the current licensing

basis.

The licensee documented in EC 623398 that isolation of 1E31-N007BA was acceptable given

that it was originally installed to provide break detection for RHR steam condensing mode

piping. This mode of operation was removed from the LaSalle UFSAR in 1992, and the

equipment associated with this function was removed from TS in 1998 (U1) and 1999 (U2).

The physical piping associated with the RHR steam condensing mode was isolated with a

blind flange. For leak detection in RCIC steam piping that were unmonitored for steam flow,

EC 623398 stated that the system fulfills this safety design basis function utilizing steam

pressure and area temperature indications.

The inspectors reviewed the associated licensee corrective action documents, license

amendment request, and safety evaluation related to the current configuration of the RCIC

leakage detection system instrumentation. Following this review, the inspectors consulted

with individuals in the respective NRC headquarters program office and have concluded that

the licensee appears to be in full compliance with their current licensing basis.

71153Follow-Up of Events and Notices of Enforcement Discretion

Failure to Follow Procedure and Perform Database Revision Review Requirements

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green None 71153

Systems FIN 05000373/2018002-02 Follow-up of

Closed Events and

Notices of

Enforcement

Discrection

The inspectors identified a Green finding of very low safety significance for the licensees

failure to follow procedure NSWP-WM-03, Predefine Database Revisions, Revision 0, for

retiring procedure LES-GM-108, Inspection of 480V Motor Control Center Equipment, that

performed bus bar inspection on Division 3 motor control centers. Specifically, instead of

completing NSWP-MW-03, step 6.5, Database Revision Review Requirements, to retire the

bus bar inspections for Division 3 motor control centers, the licensee retired the procedure

based solely on having previously retiring the bus bar inspections for Division 1 and Division 2

in 2002, and did not perform the required review.

Description:

On February 16, 2018, the main control room received plant process computer alarm B823,

D/G 1B Oil Pump M/C Pwr Not Available, in addition to other Division 3, Unit 1 B diesel

generator alarms. The AC circulating oil pump was found not running and hot to the touch.

Approximately 15 minutes later, the Unit 1 B DG trouble alarm annunciated and the local

panel alarm for low oil pressure was identified. The licensee documented the events in

AR 04105079.

The licensee commenced troubleshooting and identified low voltage on one phase of the

circulating oil pump motor. The low voltage condition resulted in the electricians performing

an inspection at motor control center (MCC) 143-1 that houses the power supply breaker

[1AP79E-2B] for the pump motor. When the electricians removed the MCC bucket from the

bus, it was identified that the A phase of the bus bar had localized damage where the bucket

connects to the bus bar. Approximately 25 percent of the bus bar material thickness was

degraded and the A phase bucket clip was found degraded. These conditions were

determined to be the reason for the circulating oil pump failure.

The licensee performed a corrective action program evaluation that determined the apparent

cause of the degraded bus bar clip connection was due to relaxation of the bucket clip over

time. The licensee did an extent of condition review on the remaining MCC 143-1 cubicles

and noted ten discrepancies where less than optimal clip to bus bar contact was identified for

the remaining 25 cubicles. Additionally, through the review of the PM performed on

MCC 143-1, the licensee found that the last visual inspection of the bucket clip to bus bar

connection was performed in March of 1996. The PM had an eight year frequency and was

retired in 2006.

The inspectors discovered that in 2002, the Division 1 and Division 2 MCC bus bar

inspections were retired per service request (SR) 00012103 in accordance with procedure

NSWP-WM-03, Predefine Database Revisions, Revision 0. The retirement was based

upon the MCCs not having to meet environmental qualification requirements and the PMs

were not required by the PCM template for MCC bucket/breaker cubicle inspection. In 2006,

the Division 3 MCC bus bar inspections were retired per SR 00043977 based on a note that

stated Per discussion with CMO the bus bar inspection PM is no longer required. The

Division 1 and 2 inspections were already retired. Division 3 was accidentally overlooked.

It is important to note that the Division 1 and Division 2 MCCs were manufactured by

International Switchboard Corporation with General Electric components that use a similar but

different cubicle to bus connection than the Division 3 MCCs that were manufactured by

Klockner-Moeller. The Klockner-Moeller design incorporates a spring on each of the bucket

clips to maintain bus bar contact in addition to the spring tension provided by the clip material.

The International Switchboard design relies on only the spring tension of the material.

Based upon the available documentation and the difference between the clip designs, the

inspectors determined that the Division 3 bus bar inspections had been retired without

performing procedure NSWP-WM-03, step 6.5, Database Revision Review Requirements.

The inspectors could not determine if the original service request intentionally omitted the

Division 3 bus bars from deletion and that sufficient justification was provided in the

subsequent service request to document completion of the database revision review for the

Division 3 bus bars.

Corrective Actions: A temporary modification was prepared and approved to supply

temporary power to the loads supplied by breaker 1AP79E-2B utilizing a spare cubicle in

MCC 143-1. The original breaker was repaired and installed into the spare cubicle with the

power cables located in the original cubicle extended to reach the spare. The licensee

completed post maintenance testing to ensure equipment function was restored. The

discrepant clips identified during the extent of condition review were addressed by reforming

the clips, followed by visual inspection to ensure each clip to bus bar connection was restored

to line contact. Resistance checks were also performed. The licensee has reinitiated the PM

to inspect the bus bars for the Division 3 MCCs.

Corrective Action Program Reference: AR 04105079

Performance Assessment:

Performance Deficiency: The inspectors determined that failing to follow procedure

NSWP-WM-03, Database Revision Review Requirements, step 6.5 and not completing the

database revision review for retiring the Division 3 bus bar inspections was a performance

deficiency. Specifically, since the review was not performed, it is uncertain whether the

conclusion to retire the Division 3 bus bar inspections had been accidentally left out.

Screening: The performance deficiency was more than minor because it adversely affected

the procedure quality attribute of the Mitigating Systems cornerstone to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent undesirable

consequences. Specifically, not performing reviews in accordance with station procedures

could retire preventative maintenance that would reduce the availability, reliability or capability

of systems or lead to a more safety significant event.

Significance: Using IMC 0609, Appendix A, The Significance Determination Process for

Findings At-Power, issued June 19, 2012, the finding was screened against the Mitigating

Systems cornerstone and determined to be of very low safety significance (Green) because

the answer to each of the screening questions was no.

Cross-cutting Aspect: No cross cutting aspect was assigned to this finding because the

inspectors determined the finding did not reflect present licensee performance.

Enforcement:

The inspectors did not identify a violation of regulatory requirements associated with this

finding.

Licensee Identified Non-Cited Violation 71153Follow-up of Events and Notices of

Enforcement Discretion

This violation of very low safety significant was identified by the licensee and has been

entered into the licensee corrective action program and is being treated as a Non-Cited

Violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification LCO 3.4.4 (applicable for Modes 1, 2 and 3) states: The

safety function of 12 safety relief valves (S/RVs) shall be OPERABLE, and Action Statement

A states that One or more required S/RVs inoperableA.1 be in mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and A.2

be in Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Technical Specification SR 3.4.4.1 states that Verify the safety

function lift setpoints of the required S/RVs are as follows:

Number of S/RVs Setpoint (psig)

1205 +/- 36.1

1195 +/- 35.8

1185 +/- 35.5

1175 +/- 35.2

1150 +/- 34.5

Contrary to the above, during portions of previous Unit 1 and 2 operating cycles from 2012

through January of 2017, two main steam S/RVs did not meet these lift pressure setpoint

requirements. Specifically S/RV 2B21-F013C lifted at 1131 psig instead of from 1139.8

to 1210.2 psig and S/RV 2B21-F013L lifted at 1130 psig instead of from 1159.2 to 1230.8

psig (reference: Licensee Event Report 05000374/2017-004-00; -01, Two Main Safety

Relief Valves Failed Inservice Lift Inspection Pressure Test.)

Significance/Severity: This licensee identified finding affected the Initiating Events

Cornerstone and was screened in accordance with Exhibit 1 of IMC 0609, Appendix A, The

Significance Determination Process for Findings At Power. The two affected SRVs lifted low

outside of their setpoint band, which was conservative with respect to maintaining the reactor

coolant system overpressure protection safety function of these valves. Therefore, the

inspectors determined that this finding is of very low safety significance (Green) because after

a reasonable assessment of degradation, the finding would not have resulted in exceeding

the reactor coolant system leak rate for a small LOCA and did not affect other systems used

to mitigate a loss-of-coolant accident.

Corrective Action Reference: AR 3974669

Minor Violation 71153Follow-up of Events and

Notices of Enforcement Discretion

Minor Violation: For S/RV 2B21-F013L, serial number N63790-05-0012 (hereafter referred

to as S/RV 12), the licensee completed a work group evaluation as documented in

AR 03975216ACIT No. 3 to investigate the cause for two S/RVs that failed a set pressure

lift test out of specification low. For ACIT No. 3, the licensee staff incorporated a vendor letter

that documented the results of the S/RV vendors review of the S/RV 12 condition and which

recorded an out of tolerance spring condition. It stated that The spring was measured and

rate tested. The free height was found to be below the minimum original equipment

manufacturer specified tolerance. The licensees vendor subsequently replaced the

nonconforming spring with a new spring. In prior vendor correspondence with the licensee

(reference E-mail dated June 24, 2015), the vendor stated that Typically we contribute a low

as-found lift to an out-of-tolerance spring rate or free height dimension. Therefore, the

nonconforming spring free height dimension may have caused the low as-found lift setpoint

failure for this valve and as such was relevant (e.g. material) to the determination of a failure

cause that was reported in LER 05000374/2017-004-00 and -01. However, the licensee

failed to identify this during their cause investigation and erroneously reported in

LER 05000374/2017-004-00 and -01 that The vendor reported for both valves that all the

spring tolerances were within the acceptance limits. The licensee documented this violation

in AR 04134591, Potential Minor Violation for Unit 2 LER 2017-04-01. The licensee also

submitted a revision to the LER as LER 05000374/2017-004-02.

Screening: The significance determination process does not specifically consider the

regulatory process impact in its assessment of licensee performance. Therefore, it is

necessary to address this violation which could impede the NRCs ability to regulate using

traditional enforcement to adequately deter non-compliance. The inspectors determined that

this issue was a Severity Level IV violation based on Example 6.9.d.10 in the NRC

Enforcement Policy which states, A failure to identify all applicable reporting codes on a

Licensee Event Report that may impact the completeness or accuracy of other information

(e.g. performance indicator data) submitted to the NRC. In accordance with the

Section 2.2.1.c of the NRC enforcement policy, the severity level of a violation involving the

failure to make a required report to the NRC will depend on the significance of and the

circumstances surrounding the matter that should have been reported. The NRC had not

relied on information in this LER report to make a regulatory decision, and the inspector

answered no to each of the more than minor screening questions in Appendix B of IMC 0612

for the issue of concern. Therefore, the NRC determined this was a minor violation because it

was associated with a minor performance deficiency.

Violation: Failure to comply with10 CFR 50.9 Completeness and accuracy of information

and accurately report the nonconforming S/RV 12 spring tolerance in

LER 05000374/2017-004-00 and -01 to the NRC constitutes a minor violation that is not

subject to enforcement action in accordance with the NRCs Enforcement Policy.

Observation 71153Follow-Up of Events and

Notices of Enforcement Discretion

The licensee issued LER 2018-001-00,Unanalyzed Condition Affecting Accident Mitigation

for Tornado Generated Missile Protection Non-Compliance, in accordance with Enforcement

Guidance Memorandum (EGM)15-002, Enforcement Discretion For Tornado Generated

Missile Protection Non-Compliance, issued on June 10, 2015 (ML15111A269) and revised on

February 7, 2017 (ML16355A286). The LER documented tornado generated missile

protection non-compliances which resulted in violations of NRC requirements. This issue has

received enforcement discretion and has already been documented in NRC inspection report

05000373/2018001 and 05000374/2018001 (ML18131A300).

Basis for Discretion: The NRC exercised enforcement discretion in accordance with

Section 2.3.9 of the Enforcement Policy and EGM 15-002 because the licensee initiated initial

compensatory measures that provided additional protection such that the likelihood of tornado

missile effects were lessened. In addition, the licensee implemented more comprehensive

compensatory measures to address the nonconforming conditions within the required

days. These comprehensive actions were to remain in place until permanent repairs

were completed, which for LaSalle County Station were required to be completed by

June 10, 2018, or until the NRC dispositioned the non-compliance in accordance with a

method acceptable to the NRC such that discretion was no longer needed. On

March 20, 2018, the licensee submitted a request to extend the period of enforcement

discretion (ML18079B139). On April 12, 2018, the NRC approved the extension until

June 10, 2020 (ML18094A250).

The disposition of this enforcement discretion closes LER 05000373/374/2018-001-00.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public

disclosure. No proprietary information was documented in this report.

  • On July 9, 2018, the inspectors presented the quarterly integrated inspection results to

Mr. W. Trafton and other members of the licensee staff.

DOCUMENTS REVIEWED

71111.01Adverse Weather Protection

- LOA-AP-101; Unit 1 AC Power Systems Abnormal; Revision 58

- LOA-AP-201; Unit 2 AC Power Systems Abnormal; Revision 52

- LOA-LOOP-101-201; Loss of Off-Site Power; Revision 6

- OP-AA-108-107-1001; Station Response to Grid Capacity Conditions; Revision 7

- OP-AA-108-107-1002; Interface Procedure Between BGE/COMED/PECO and Exelon

Generation (Nuclear/Power) for Transmission Operations; Revision 11

71111.04Equipment Alignment

- AR 4039087; CCPConfiguration Control Recommendation

- AR 4082868; U2 LPCS/A RHR Water Leg Pump Degrading

- AR 4112499; LPCS Pump Failed to Start During RTT

- AR 4119655; 1A TDRFP Min Flow Valve Position Indication Issue

- AR 4146322; 1E21-N413 Switch is Not Like for Like

- LOP-HP-02E; Unit 2 High Pressure Core Spray Electrical Checklist; Revision 5

- LOP-HP-02M; Unit 2 High Pressure Core Spray Mechanical Checklist; Revision 18

- LOP-HP-03; Preparation for Standby Operation of High Pressure Core Spray System

(HPCS); Revision 19

- LOP-LP-01M; Unit 1 Low Pressure Core Spray Mechanical Checklist; Revision 13

- LOP-RI-05; Preparation for Standby Operation of the Reactor Core Isolation Cooling System;

Revision 34

- LOP-VG-01; Preparation for Standby Operation of the Standby Gas Treatment System;

Revision 12

- LOP-VG-01E; Unit 1 Standby Gas Treatment System Electrical Checklist; Revision 6

- LOP-VG-01M; Unit 1 Standby Gas Treatment System Mechanical Checklist; Revision 6

- LP-1; Training Diagram, Low Pressure Core Spray System; Revision 0

- M-101; P&ID Reactor Core Isolation Coolant (RCIC); Revision BH

- M-140; P&ID; Low Pressure Core Spray (L.P.C.S.); Revision AP

- M-141; P&ID High Pressure Core Spray (HPCS); Revision AS

71111.05AQFire Protection Annual/Quarterly

- FZ 4E4; Aux. Bldg. 731-0 Elev. U2 Division 2 Essential Switchgear Room; Revision 2

- FZ 2F; Rx. Bldg. 740-0 Elev. U1 General Area & CRD Repair Room; Revision 1

- FZ 2I2; Rx Bldg. 673-4 Elev. U1 HPCS Cubicle

- FZ 4F1; Aux. Bldg. 710-0 Elev. U1 Division 1 Essential Switchgear Room

- LSCS-FPR, Fire Protection Report, Appendix H, Fire Hazards Analysis; Revision 8

- AR 414390; NRC Identified Missing Signatures in W/O 1886493-01

- M-1388; Aux Bay Vent & A/C System Elevation 710-6 Revision U

- LMS-FP-22; Fire Damper Surveillance Log (Part 1) For PMID 00097162 01; 12/14/2015

- LMS-FP-22; Fire Damper Surveillance Log (Part 1) For PMID 00097162 01; 5/9/2018

- Fire Zone 5D2, HPCS Switchgear Room

- LSCS-FPR H.3-84; Unit 2 Division 2 Essential Switchgear RoomFire Zone 4E4; Revision 8

- LSCS-FPR H.3-1; Fire Zone Safety-Related Equipment Table; Revision 8

- LSCS-FPR H.3-2; Combustible Loading and Extinguishing Capability Table; Revision 8

- LSCS-FPR H.3-14; Combustible Materials FZ 2F; Revision 8

- LSCS-FPR H.3-16; Combustible Materials FZ 2G; Revision 8

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

- AR 4130643; NRC Identified IssueTraining

- AR 4138286; Div I Post LOCA Gross Gamma Rad Monitro Failed

- LaSalle Unit 1L1C18 May Sequence Exchange; 5/20/2018

- LGA-001; RPV Control; 2018

- LGA-003; Primary Containment Control; 2018

- LGP-3-1; Power Changes; Revision 66

- LGP-3-2; Reactor Scram; Revision 73

- LOA-AP-1010; Unit 1, AC Power System Abnormal; Revision 58

- LOA-EH-101; Unit 1 EHC Abnormal; Revision 35

- LOA-PWR-101; Unit 1 Unplanned Reactivity Addition; Revision 14

- LOA-RM-101; Unit 1 RCMS Abnormal Situations; Revision 20

71111.12Maintenance Effectiveness

- AR 4122070; LAS-2-HG-03 (2-1) MRule Availability Criteria Exceeded

- ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5

- Maintenance Rule System Basis Document, Function LAS-1(2)-HG-03

- Maintenance Rule Performance Criteria Selection LAS-1(2)-HG-03, 5/31/18

- Maintenance Rule Monthly Evaluation, Function LAS-1(2)-HG-03, 5/31/18

- Maintenance Rule Expert Panel Meeting Minutes, 5/31/18

71111.13Maintenance Risk Assessments and Emergent Work Control

- AR 4013471; Oversight of Risk Management Process

- AR 03981990; Op Risk Activities Review ATWS/RRCS/ARI PMS

- AR 4039087; CCPConfiguration Control Recommendation

- AR 4041051; NWS Issues Thunderstorm WarningOnLine Risk Yellow U1/U2

- AR 4041051; NWS Issues Thunderstorm WarningOnline Risk Yellow U1/U2

- AR 4043747; OPS May Be Challenged in Determining On Line Risk

- AR 4132872; 4.0 Critique for First-Time Load Following on Unit 2

- AR 4133171; Potential Missile Hazards in/near U1 Transformer Yard

- AR 4137631; LOA-TORN-001 Entered Due to Severe Thunderstorm Warning

- Emergency Procedures Postings; Emergency Messages; 4/30/2017-5/1/2018

- LOA-TORN-001; High Winds / Tornado; Revision 23

- OMB 3150-0011; GL 2006-02, Grid Reliability and the Impact on Plant Risk and the

Operability of Offsite Power, ML060180352; 2/1/2006

- OP-AA-102-101; Management of Nuclear Generation; Revision 15

- OP-AA-108-107-1001/ WC-AA-101; Work Management Guide for Weather Related Alterts

Procedural Guidance; Undated

- OP-AA-108-107-1001; Station Response to Grid Capacity Conditions; Revision 7

- OP-AA-108-117; Protected Equipment Program; Revision 5

- OP-LA-101-111-1002; Main Generator Voltage Changes; Revision 32

- U1 Ops Rounds Checklist, Control Room Rounds; undated

- WC-AA-101; On-Line Work Control Cycle / Factors List; Revision 27

- WC-AA-101; On-Line Work Control Process; Revision 27

- WC-AA-101; On-Line Work Control Process; Revision 27ER-AA-310; Implementation of the

Maintenance Rule; Revision 11

- WC-AA-104; Integrated Risk Management; Revision 25

- WC-AA-2000; Emergent Issue Response; Revision 8

71111.15Operability Determinations and Functionality Assessments

- 1E-0-4432BE; Schematic Diagram Control Room HVAC System VC Part 29; Revision R

- 1E-0-4569AB; Internal/External Wiring Diagram Control Room HVAC Intake Monitoring Panel

0PM14J Part 2; Revision 0

- 1E-1-4218ZA; Loop Schmatic Diagram Process Radiation Monitoring System PR (D18);

Revision G

- AR 2679808; Leakage Identified on Supply Header for Lower Coil 2VY03A

- AR 2690060; New IR Needed for WGE for 2VY03A Leak

- AR 4104994; 1B DG AC Circulating Oil Pump Tripped

- AR 4114241; Need High Point Vents in ECCS Systems

- AR 4122233; NRC Questions on RCIC Piping Void Cacluation

- AR 4139831; Water Leak on Piping Inside VY Cooler (2VY03A)

- AR 4140182; Limitation for 2VY03A per EC 624352 Evaluation

- AR 4141032; Rad Monitor 1D18-K751C Failed Downscale

- ASME IX-1000; Mandatory Appendix IX, 2007 Section XI, Division 1

- ASME Section XI Repair/Replacement Plan, 02/2VY03A; 5/22/2018

- EC 337814; Loss of Either the Circulating Oil Pump or the Turbochrger Soak Back Oil Pump

- EC 364833; Evaluation of Allowable L2R11 Line Stop Leakage During Testing; Revision 0

- EC 624352; 2VY03A Cooler Tubing Inlet Riser Repair Evaluation; Revision 000

- ISI-RI-1006; Inservice Inspection Isometric Reactor Core Isolation Coolant System;

Revision A

- L-004047; Allowable Gas Accumulation in Susceptible RCIC Piping; Revision 1

- LOA-PR-101; Unit 1 Process Radiation Monitoring System Abnormal; Revision 17

- Operations Log, 5/24/2018

- WO 1341616-01; Chemical Cleaning of Waterside of 2VY03A Cooler; 10/24/2011

71111.18Plant Modifications

- (Draft) Failure Analysis Report, Fuse OT15, FirstEnergy BETA, Laboratory Services Section,

Undated

- 1E-1-4220AF; Schematic Diagram Residual Heat Removal System RH (E12) Part 657;

Revisions O, P

- 1E-1-4220CJ; Schematic Diagram Residual Heat Removal System RH (E12) Part 57;

Revisions R, Q

- 1E-1-4220CJ; Schematic Diagram Residual Heat Removal System RH (E12) Part 57;

Revision T

- ANSI/ANS-3.2-1988; Administrative Controls and Quality Assurance for the Operational

Phase of Nuclear Power Plants; 6/23/2008

- AR 1321386; Comple Open Attributes for EC 380792

- AR 361872; Provide Temporary ELBP to Support Operations Evaluation 05-004

Compensatory Actions

- AR 4101058; Fuse Replacement for D RHR WS Breaker

- AR 4123073; Emergency Light on Cart in Support Operations Evaluation 05-004

- AR 4125627; NRC Follow-up Question

- CC-AA-206; Fuse Control; Revision 11

- CC-AA-206-1000; Fuse Replacement; Revision 2

- CR 2016-02048, Perry, Casual Investigation for Loss of Division 1 EH11 4160 Volt Bus; 2016

- EC 380786; 50.59 Review, MSO Mod for Pumps 1E12-C300C and D (Scenarios 5D, 16

and 22); Revision 000

- ER-AA-200-1001; Equipment Classification; Revision 4

- IR 4100844, Assignment 16; Quality Signoff, System Engineer to Classify Relays & Initiate

PMMRs, as Required; 5/18/2018

- IR 4100844; MRC Investigation Review of 1D RHRSW Pump Auto Tripped on Start; 3/30/2018

- L11-52; EC 380786; 50.59 Screening of Installation of Protective Circuitry to Prevent RHR SW

Pump Damage; Revision 000

- LER 05000-440/2016-003-00; Loss of Safety Related Electrical Bus Results in a Loss of

Shutdown Cooling; 4/8/2016

- LOP-AP-04; Racking in a G.E. 4160 Volt Motor Operated Air Circuit Breaker; Revision 15

- MA-AA-716-210; Document Site and Corporate Approval Forms, Performance Centered

Maintenance (PCM) Process; 1/10/2011 and 3/16/2011

- MA-AA-723-601; Inspection, Maintenance, and Replacement of GE Type HMA Relays;

Revision 5

- PMMR PMC-18-107934; Equipment Listing K300 Relays (RHR Service Water Pump);

6/5/2018

- RelaysControl Timining, As-Found Testing; 1/21/2002

- SRRS 1B.100; MA-AA-716-210; Performance Centered Maintenance (PCM) Process;

1/10/2011

71111.19Post Maintenance Testing

- AR 2537256; 10 CFR Part 21 Involving Limit Switches EA180 & EA170

- AR 2713703; RCIC Trip and Throttle Valve Tripped

- AR 2729757; U-1 RCIC Trip on Low Suction Pressure

- AR 2742254-05; Document RCR

- AR 3952068; U2 RCIC Governer (sic) Controls

- AR 3972964; Failed PMT on 2B21-F430B for Loss of Valve Position Lights

- AR 3985811; Maintenance Rule (A)(1) Determination for LAS-0-DG-01

- AR 4137633; Trending Valve Position changes for Div 1 VY Area Coolers

- AR 4139358; Switch 1C71-N006C Took Too Long to Actuate

- AT 2742254-XX; Root Cause: EG-R Failed Due to Inadequate Management of its Preventive

Maintenance Strategy; 5/30/2017

- SM-AA-102; Receipt 220049, Quality Receipt Inspection for: Controller, Basic, Refurbished;

1/31/2017

- WO 01923082-36; 2VY02A Cooler Leak and Flow Check; 04/18/2018

- WO 01923082-37; Differential Pressure Test Cooler 2VY02A; 04/18/2018

- WO 1471593-01; U2 RCIC Discharge Flow Controller (Rebuild/Replace); 1/3/2018

- WO 2537256-02; M. Musser Note: Supply/Procurement Engineering Applicability Review

Determine Station Impact of Affect Namco Switches; 5/2018

- WO 4622688-15; Chemical Cleaning of Waterside of 1VY01A Cooler; 5/19/2018

- WO 4684002-02; Troubleshoot U1 TSV; 5/20/2018

- WO 4759096-01; LOS-RP-Q2 U1 Turbine Stop Valves Att 1A; 5/20/2018

71111.22Surveillance Testing

- 1E-2-4205AB; Schematic Diagram Reactor Recirculation System RR (B33) Part 2;

Revision T

- 1E-2-4207BD; Schematic Diagram Alternate Rod Insertion Alarms System RD (C22) Part 4;

Revision D

- 1E-2-4207BE; Schematic Diagram Alternate Rod Insertion Alarms Sys. RD (C22) Part 5;

Revision A

- 1E-2-4655AB; Internal/External Wiring Diagram Alternate Rod Insertion Div. 1 Control

Panel 2H14-P800; Revision I

- 1E-2-4656AE; Internal/External Wiring Diagram Alternate Rod Insertion Div. 2 Control

Panel 2H13-P801; Revision F

- AR 4090577; Opportunity to Re-classify Piping

- AR 4093219; 0DG023A Failed PMT After Repairs Under WO# 01933262-01

- AR 4109393; Minor Oil Leak from 0 DG Lube Oil Cooler

- AR 4135717; Inst. OOT, 1C11-N013A, Trend Code B3

- AR 4137624; RMUnexpected Alarm 1H13-P603-A403 CRD HYD Temp Hi 30-31

- AR 4139347; RMU1 Rod 38-35 Notch 45 and 39 Within 90% of T.S. Limit

- AR 4139371; RMU1 Channel Distortion Testing Results

- EC 405467, Revise Acceptance Criteria for Quarterly Group B and Biennial Comprehensive

Pump Test on LPCS Pump 1E21-C001, Revision 0

- Figure 11-3; Fuel Oil System Non-HPCS Diesels (Training); 8/24/1999

- IST Program Plan, Technical Position TP-06, Categorization of IST Pumps (Group A or B),

Revision 1

- LIS-NB-219A; Unit 2 Reactor Vessel Low Water Level 2 ARI/ATWS Instrument

Channels A & C Calibration; Revision 11

- LOS-DG-RO; 0 Diesel Generator 24 Hour Testing; 4/11/2018

- LOS-LP-Q1, LPCS System Inservice Test, Revision 58

- PMRQ 91306-01; Surveillance History Report for RX Low Water Level 2 ARI/ATWS

Channels A & C

- WO 1876429; RX Low Water Level 2 ARI/ATWS Channels A & C; 4/27/2018

- WO 1876429-01; RX Low Water Level 2 ARI/ATWS Channels A-C; 4/26/2018

- WO 4762072-01; Tech Spec Surveillance SCRAM Time / 10% of Rods/Every 120 Days,

LOS-RD-SR12; 5/21/2018

- WO 4658557-01, U1 LPCS Biennial Comprehensive IST Pump Test, 6/13/18

71114.06Drill Evaluation

- 2Q18 Paper Driven Drill Scenario; 5/30/2018

- AR 4142614; 2Q Drill Set F&E IssuesPA Speakers and R*Time

- SRRS-5B.100; Shift Emergency Directory Checklist, EP-AA-112-100-F-01; Revision Z

71151Performance Indicator Verification

- LOS-AA-S101; Unit 1 Shiftly Surviellance; Revision 105

- LOS-AA-S201; Unit 2 Shiftly Surviellance; Revision 103

- LS-AA-2100; Monthly Date Elements for NRC Reactor Coolant System (RCS) Leakage;

Revision 6

71153Follow-Up of Events and Notices of Enforcement Discretion

- AR 04134585, Potential Finding Regarding Compliance With GE Design; 05/04/2018

- AR 04134591, Potential Minor Violation for Unit 2 LER 2017-04-01; 05/04/2018

- AR 04134599, Potential Green NCV for not Meeting OM Code Requirement; 05/05/2018

- AR 04133521, NRC Question Regarding SILs Related to SRVs; 05/02/2018

- AR 02452723, 2B21-F013M Fails Set Pressure Test for IST; 02/14/2015

- AR 02450121, 2B21-F013S - SRV S Solenoid Valve; 02/10/2015

- AR 03974669, 2B21-F013C Fails Set-Pressure Test; 02/16/2017

- AR 03975216, 2B21-F013L Fails Set-Pressure Test; 02/17/2017

- AR 00039378, DRV 2B21-F013A Failed Bench Test; 11/24/2000

- General Electric Design Specification DCA22A6441; Revision 3.

- General Electric RICSIL 44; 06/25/1989

- General Electric RICSIL 57; 04/02/1991

- General Electric RICSIL 563; 07/22/1993

- Licensee Event Report, 05000374/2017-004-01, Two Main Safety Relief Valves Failed

Inservice Lift Inspection Pressure Test, 07/14/2017

- NWS Technology, Letter; LaSalle SRV s/n N63790-05-0012As Found Failure; Undated

- NWS Technology, Letter; LaSalle SRV s/n N63790-05-0077As Found Failure; Undated

- NWS Technology, Customer Equipment Anomalies Report 17-344; 10/24/2017

- NWS Technology, Spring Data Sheet Valve Serial Number N63790-05-0012; 05/08/2017

- Purchase Order 00487681; Revision 13.

- QAI-3224 Supplement 1, Crosby Quality Assurance Instruction ASME Section III Class 1,

Revision 23

- AR 04105079; Damage to Bus 143-1

- LES-GM-108; Inspection of 480V Motor Control Center Equipment (International

Switchboard/GE); Revision 24

- EC 623373; MCC 143-1 Bus Bar Damage Extent of Condition Recommended Actions for

L1R17; Revision 001

- WO 04747663-08; Perform LES-GM-108 Attachment 2 for 1AP79E; dated 02/19/2018

21