IR 05000369/2018412

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Security Inspection Report 05000369/2018412 and 05000370/2018412
ML18348A390
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 12/14/2018
From: Binoy Desai
NRC/RGN-II
To: Kinard K
Duke Energy Carolinas
References
IR 2018412
Download: ML18348A390 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 14, 2018

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000369/2018412 AND 05000370/2018412

Dear Mr. Kinard:

On November 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your McGuire Nuclear Station, Units 1 and 2, and discussed the results of this inspection with Mr. S. Snider, and other members of the McGuire Nuclear Station staff. The results of this inspection are documented in the enclosed report.

No NRC-Identified or self-revealing findings were identified during the inspection.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-369 and 50-370 License Nos: NPF-9 and NPF-17

Enclosure:

NRC IR 05000369/2018412 and 05000370/2018412, w/Attachment: Supplemental Information

Inspection Report

Docket Nos: 05000369 and 05000370 License Nos: NPF-9 and NPF-17 Report Nos: 05000369/2018411 and 05000370/201841 Enterprise Identifier: I-2018-412-0008 Licensee: Duke Energy Carolinas, LLC.

Facility: McGuire Nuclear Station, Units 1 and 2 Location: Huntersville, NC Dates: November 5 - 9, 2018 (Duke Corporate Office)

November 26 - 29, 2018 (Onsite)

Inspectors: Jon Wallo, Senior Physical Security Inspector Jared Justice, Physical Security Inspector Approved by: Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at McGuire Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations No findings were identified.

INSPECTION SCOPE

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I: All requirements Tier II: 02.05 (b, d), 02.06(a, c), 02.07(a, b), 02.08(a, b, c)

Tier III: 02.09, 02.10(a, b, c), 02.11(a, b)

71130.06 - Protection of Safeguards Information

The inspectors evaluated the safeguards information protection program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I: All requirements Tier II: 02.05(a, b), 02.06(a, b), 02.08(c)

Tier III: 02.09, 02.10 (a, b)

71130.08 - Fitness for Duty

The inspectors evaluated the fitness for duty program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I: All requirements Tier II: All requirements Tier III: All requirements

EXIT MEETINGS AND DEBRIEFS

On November 29, 2018, the inspectors presented the Baseline Security Inspection results to Mr.

S. Snider and other members of the licensee staff.

LIST OF

DOCUMENTS REVIEWED

PROCEDURES

AD-SY-ALL-0110, Protection of Information Related to Nuclear Security, Rev 4

AD-SY-ALL-0301, Nuclear Worker Unescorted Access Authorization Program, Rev 4

AD-SY-ALL-0310, Access Authorization Processing, Rev 3

AD-SY-ALL-0320, Personnel Access Data System, Rev 2

AD-SY-ALL-0340, Access Authorization Training and Qualification Program, Rev 1

AD-SY-ALL-0370, Access Processing of Foreign Nationals, Rev 0

AD-SY-ALL-0401, Fitness for Duty Program, Rev 2

AD-SY-ALL-0405, Fitness for Duty Violations, Rev 0

AD-SY-ALL-0410, Fitness for Duty Drug and Alcohol Collections, Rev 2

AD-SY-ALL-0415, Fitness for Duty Blind Performance Testing Procedure, Rev 2

AD-SY-ALL-0420, Fitness for Duty Unscheduled Callout, Rev 1

AD-SY-ALL-0440, Fitness for Duty Training and Qualification Program, Rev 1

AD-SY-ALL-0451, Behavior Observation Program, Rev 3

AD-SY-ALL-0460, Managing Fatigue and Work Hour Limits, Rev 2

PY-SY-ALL-0004, Duke Energy Nuclear Generation Fitness for Duty Policy, Rev 1

Various Nuclear Oversight and Self-Screener Audits

CONDITION REPORTS

219858 02092352 02103961 02115990

2117004 02123404 02128460 02143347

236043 02242113 02245713

Attachment