Annual Assessment Letter for San Onofre, Units 2 & 3 (IR 05000361-13-801 and 05000362-13-801)
ML13063A574
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/04/2013
From: Kennedy K
NRC/RGN-IV/DRP
To: Peter Dietrich
Southern California Edison Co
References
IR-13-801
Download: ML13063A574 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (REPORT 05000361/2013801 AND 05000362/2013801)

Dear Mr. Dietrich:

On February 14, 2013, the NRC completed its end-of-cycle performance review of San Onofre Nuclear Generating Station, Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that performance at San Onofre Nuclear Generating Station, Units 2 and 3, during the most recent quarter was within the Regulatory Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs, as described in NRC Inspection Report 05000361; 05000362/2012403 dated August 14, 2012 (ML12229A106). On December 20, 2012, the NRC completed Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC concluded that your staff performed an acceptable evaluation of the greater-than-green finding(s). As indicated in our letter to you dated January 31, 2013 (ML13032A203), the NRC considers this finding closed. However, the finding will be considered for Action Matrix input until March 31, 2013. On April 1, 2013, San Onofre Nuclear Generating Station, Units 2 and 3, will be returned to the Licensee Response Column of the Action Matrix, unless additional Action Matrix inputs are identified.

In our midcycle assessment letter dated September 4, 2012, the NRC discussed a new cross-cutting theme in the human performance area (work practices component) associated with the aspect of procedural compliance. Specifically, the NRC identified four findings associated with the definition and effective communication of expectations regarding procedural compliance and personnel following procedures H.4(b). The NRC staff has determined that this cross-cutting theme continues, based upon identification of four findings associated with H.4(b) during the current assessment period. The NRC staff has reviewed the actions proposed and being implemented by your staff to address the continuing theme and determined that these actions, if successfully implemented, should result in an improvement in this area. Therefore, the NRC staff determined that a substantive cross-cutting issue associated with H.4(b) does not

Mr. Peter Dietrich -2-exist because the NRC does not have a concern with your staff's scope of effort and progress in addressing the cross-cutting theme. The NRC will continue to monitor your staff's effort and progress in addressing this theme until the theme criteria are no longer met.

San Onofre Units 2 and 3 have been shut down since January 2012. Some baseline inspection procedures, as well as performance indicators (PIs), cannot be accomplished or are invalid for plants in an extended (greater than 6 months) shutdown. The staff has determined that the following no longer provide valid indications of performance: Unplanned Scrams, Unplanned Power Changes, Unplanned Scrams with Complications, Reactor Coolant System Activity, Reactor Coolant System Leakage, and Mitigating Systems Performance Index. You should continue to submit PI data to the NRC in accordance with NEI 99-02 and superseding resolutions to frequently asked questions.

The NRC plans to conduct ROP baseline and supplemental inspections at your facility, in accordance with Inspection Manual Chapter (IMC) 0351, "Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Other Than Significant Performance Problems." The NRC transitioned oversight of San Onofre Units 2 and 3 to IMC 0351 on September 4, 2012, due to the extended shutdown of both units caused by unusual steam generator tube degradation in the recently replaced steam generators. IMC 0351 provides guidance for implementation of the Reactor Oversight Process for plants such as San Onofre where the shutdown is a result of a significant technical issue, and not widespread performance issues.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. Due to transition to IMC 0351, some scope changes to baseline inspections, as well as those inspections performed by the resident inspectors, have been planned. These changes are described in the memorandum dated September 4, 2012, from Mr. Kriss Kennedy, Director, Division of Reactor Projects, Region IV, to Mr. Ho Nieh, Director, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation (ML12242A518). The inspections listed during the last 9-months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Mr. Peter Dietrich -3-Please contact Mr. Ryan Lantz, Chief, SONGS Project Branch, at 817-200-1173 with any questions you have regarding this letter.

Sincerely,

/RA/

Kriss M. Kennedy, Director Division of Reactor Projects Docket Nos. 50-361, 50-362 License Nos. NPF-10, NPF-15 Enclosure:

San Onofre Nuclear Generating Station Inspection/Activity Plan

Mr. Peter Dietrich -4-Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Acting Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Acting Senior Resident Inspector (Gerond.George@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Site Administrative Assistant (Heather.Hutchinson@nrc.gov)

Branch Chief, ORA/SPB (Ryan.Lantz@nrc.gov)

Senior Project Engineer, ORA/SPB (Nick.Taylor@nrc.gov)

Project Engineer, ORA/SPB (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV State Liaison Officer (Bill.Maier@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

Branch Chief/DRS/EB1 (Thomas.Farnoltz@nrc.gov)

Branch Chief/DRS/EB2 (Geoff.Miller@nrc.gov)

Branch Chief/DRS/PSB1 (Mark.Haire@nrc.gov)

Acting Branch Chief/DRS/PSB2 (James.Drake@nrc.gov)

Branch Chief/DRS/OB (Vincent.Gaddy@nrc.gov)

Director, DIRS, NRR (Ho.Nieh@nrc.gov)

Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)

Director, DORL, NRR (Michele.Evans@nrc.gov)

Deputy Director, DORL, NRR (Louise.Lund@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (John.Cassidy@nrc.gov)

ROPassessment.Resource@nrc.gov ROPreports.Resource@nrc.gov OEMail.Resource@nrc.gov G:\ORA\SPB\SONGS EOC Letter ADAMS: No Yes SUNSI Review Complete Reviewer Initials: REL Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV:SRI:SPB SPE:SPB C:SPB D:DRS GAGeorge NHTaylor RELantz TBlount T - RELantz /RA via Email/ /RA/ /RA/ JAClark for 2/27/13 2/25/13 2/27/13 2/28/13 DD:DRP TM:SONGS SP D:DRP MLScott ATHowell KMKennedy

/RA/ /RA via Email/ /RA/

2/27/13 3/4/13 3/4/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax