Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/97-02 & 50-362/97-02 on 970313
ML20148B522
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
50-361-97-02, 50-361-97-2, 50-362-97-02, 50-362-97-2, NUDOCS 9705130124
Download: ML20148B522 (4)


Text

, \

9 44"4 9 UNITED STATES

  1. 1 . t NUCLEAR REGULATORY COMMISSION

= sg

{ REGloN iv S 611 RYAN PLAZA oRIVE, butte 400

+9 . . . . + /[ AR LINoToN, T EXAS 760118064 May 5, 1997 Harold B. Ray, Executive Vice President Southern California Edison C San Onofre Nuclear Generating Station P.O. Box 128 l San Clemente, California 92674-0128 SUBJECT: NRC INSPECTION REPORT 50-361/97-02; 50-362/97-02 Thank you for your letter of April 14,1997, in response to our letter and Notice of Violation dated March 13,1997. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine Your letter provides your position, for the second violation, that the steam generator system was out of service for testing and that the procedural noncompliance could not have had any safety significance. You also stated your confidence that your subsequent review of test data would have identified the error prior to returning the system to operation. We accept that there was minimal samty significance to the violation; but do not agree that there was not any safety significance associated with the procedure .

violation, because we do not consider holding pressure for only 1 minute to be equivalent to the testing procedure provision that 5 minutes of pressure application was necessar Accordingly, we consider that departure from your established standard, without prior approval, had some safety significance. We also cM not share your confidence that the error would have been identified prior to returning the steam generator to operation. We observed that your procedures did not require the review and acceptance of test data prior to returning the steam generator system to service, because your procedure data table did not provide specific acceptance criteria for the test data entered in the " leak test clapsed time" block, if you have further questions regarding our positions, please contact Dennis Kirsch (510-975-0290) of my staf

Sincerely bk Thomas P. Gwynn, Director Division of Reactor Projects 9705130124 970505 i PDR ADOCK 05000361 {

G PDR IflllllffllI,0,li}f I g o/

.. ... .. .- .._.. - .-. - . _- . - . , - - _ - - -

. \

i l l

'

!

Southern California Edison C l l

l Docket Nos.: .50-361 50-362 i

License Nos.: NPF-10 j i NPF-15 cc: I

,

'

Chairman, Board of Supervisors

'

County of San Diego 1600 Pacific Highway, Room 335 I San Diego, California 92101

Alan R. Watts, Esq.

'

! Woodruff, Spradlin & Smart 701 S. Parker St. Suite 7000

$ Orange, California 92868-4720 j . Sherwin Harris, Resource Project Manager i Public Utilities Department

City of Riverside

.

3900 Main Street Riverside, California 92522 l 3 R. 'W. Krieger, Vice President j Southern California Edison Company l l

San Onofre Nuclear Generating Station l

l P.O. Box 128- '

j San Clemente, California 92674-0128 t 1 Dr. Harvey Collins, Chief

Division of Drinking Water and

'

Environmental Management California Department of Health Services i P.O. Box 942732

. Sacramento, California 94234-7320 i Terry Winter, Manager

! Power Operations San Diego Gas & Electric Company

P.O. Box 1831
San Diego, California 92112

l Mr. Steve Hsu

} Radiological Health Branch State Department of Health Services

-

P.O. Box 942732 Sacramento, California 94234

!

. _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ _ . - , _

_ _ . . _ . _ . _ _ . . _ . _ . . . _ _ _ . _ _ _ . _ _ _ _ _ _ . . _ _ _ _ _ _ . _ . _ _ _ _ . - _ _ . . _ _ _ _ . ~

-

- . _ . _ . _ _ _ _ . _ .

. s I

a i

? i

'

.

Southern California Edison C #

!

I

l

,

l

-

Mayor l

,

City of San Clemente ]

.100 Avenida Presidio -1 i
San Clemente, California 92672 '

1, l Mr. Truman Burns \Mr. Robert Kinosian

California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102

- .

.

I d'

a

!

F

.I f

)' s

l l

.

'

t

~

\

i l l

.

_

f

$

.-

.

. .

i

!  !

i

!

i i

. _ . __ _ _

_ .

. 6 Southern California Edison C ,

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident Inspector DRP Director DRS-PSB Branch Chief (DRP/F, WCFO) MIS System Senior Project Inspector (DRP/F, WCFO) RIV File Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO)

WCFO File DOCUMENT NAME: R:\_SO23\SO702AK.DFK To receive copy of document, indicate in bor: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/F D:WCFO/E j) l l l DFKirsch K' KEPerkinktf)

_

04//fl97 08,597 V OFFICIAL RECORD COPY