MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 IR 05000346/20234022023-12-19019 December 2023 Cyber Security Inspection Report 05000346/2023402 ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000346/20220062023-03-0101 March 2023 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2022006) IR 05000346/20220912023-02-10010 February 2023 NRC Inspection Report 05000346/2022091 and Apparent Violation IR 05000346/20220042023-02-0909 February 2023 Integrated Inspection Report 05000346/2022004 and 07200014/2022001 IR 05000346/20224042023-02-0808 February 2023 Material Control and Accounting Program Inspection Report 05000346/2022404 IR 05000346/20224032023-01-23023 January 2023 Security Baseline Inspection Report 05000346/2022403 IR 05000346/20220112023-01-0505 January 2023 Triennial Fire Protection Inspection Report 05000346/2022011 IR 05000346/20220032022-11-10010 November 2022 Integrated Inspection Report 05000346/2022003 IR 05000346/20220402022-11-10010 November 2022 95001 Supplemental Inspection Report 05000346/2022040 and Follow-Up Assessment Letter IR 05000346/20220102022-11-0202 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000346/2022010 IR 05000346/20224402022-10-0404 October 2022 NRC Supplemental Inspection (95001) Interim Report 05000346/2022440 IR 05000346/20220052022-08-25025 August 2022 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2022005) IR 05000346/20220022022-08-11011 August 2022 Integrated Inspection Report 05000346/2022002 ML22208A0652022-07-27027 July 2022 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 IR 05000346/20220122022-06-30030 June 2022 Phase III 71003 License Renewal Report 05000346/2022012 IR 05000346/20224012022-05-17017 May 2022 Security Baseline Inspection Report 05000346/2022401 IR 05000346/20220012022-05-12012 May 2022 Integrated Inspection Report 05000346/2022001 IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 IR 05000346/20210062022-03-0202 March 2022 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2021006) IR 05000346/20210922022-03-0101 March 2022 EA-21-155 Davis Besse - Final Significance Determination of White Finding, Notice of Violation and Assessment Follow Up Letter, NRC Inspection Report 50000346/2021092 IR 05000346/20210042022-02-0909 February 2022 Integrated Inspection Report 05000346/2021004 and Exercise of Enforcement Discretion ML22032A3142022-02-0101 February 2022 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000346/2022010 IR 05000346/20210122022-01-31031 January 2022 Temporary Instruction 2515/194 Inspection Report 05000346/2021012 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding IR 05000346/20214042021-12-0909 December 2021 Security Baseline Inspection Report 05000346/2021404 ML21340A2212021-12-0909 December 2021 NRC Inspection Report (05000346/2021090) Preliminary White Finding IR 05000346/20210502021-11-19019 November 2021 Special Inspection Reactive Report 05000346/2021050 and Apparent Violation IR 05000346/20210032021-11-10010 November 2021 Integrated Inspection Report 05000346/2021003 IR 05000346/20210112021-11-0101 November 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000346/2021011 IR 05000346/20214032021-10-14014 October 2021 Security Baseline Inspection Report 05000346/2021403 IR 05000346/20210102021-10-0707 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000346/2021010 IR 05000346/20214012021-10-0707 October 2021 Cyber Security Inspection Report 05000346/2021401 and Premliminary Greater than Green Finding and Apparent Violation IR 05000346/20210052021-09-0101 September 2021 Updated Inspection Plan for Davis-Beese Nuclear Power Station (Report 05000346/2021005) IR 05000346/20210022021-08-12012 August 2021 Integrated Inspection Report 05000346/2021002 and 07200014/2021001 IR 05000346/20215012021-06-15015 June 2021 Emergency Preparedness Inspection Report 05000346/2021501 2024-02-02
[Table view] Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1NRC TRIENNIAL FIRE PROTECTION INSPECTION; INSPECTION REPORT 05000346/2019011
Dear Mr. Bezilla:
On May 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Davis-Besse Nuclear Power Station, Unit 1. On May 2, 2019, the NRC inspectors discussed the results of this inspection with Mr. Mark Kanz, Senior Communications Representative, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Docket No.: 05000346 License No.: NPF-3
Enclosure:
IR 05000346/2019011
Inspection Report
Docket Number: 05000346 License Number: NPF-3 Report Number: 05000346/2019011 Enterprise Identifier: I-2019-011-0037 Licensee: FirstEnergy Nuclear Operating Co.
Facility: Davis-Besse Nuclear Power Station Location: Oak Harbor, OH Inspection Dates: February 17, 2019, to June 1, 2019 Inspectors: I. Hafeez, Reactor Inspector J. Hanna, Senior Reactor Analyst J. Robbins, Reactor Inspector A. Shaikh, Senior Reactor Inspector Approved By: Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Triennial Fire Protection Inspection at Davis-Besse Nuclear Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
Findings and violations being considered in the NRCs assessment are summarized in the table below.
List of Findings and Violations No findings or violations were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.05T - Fire Protection B.5.b Inspection Activities (IP Section 02.03)
Main article: IP 71111.05
The inspectors evaluated the following B.5.b Mitigating Strategies:
Makeup to Condensate Storage Tank; Portable Sprays; and Command and Control.
Fire Protection Inspection Requirements (IP Section 02.02) (4 Samples)
The inspectors evaluated Fire Protection Program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:
- (1) Fire Area AB - ECCS Pump Room 1-1 and Make Up Pump Room;
- (2) Fire Area DF - No. 2 Electrical Penetration Room;
- (3) Fire Area E - Auxiliary Feed Pump Room 1-1; and
- (4) Fire Area Y - Low Voltage Switchgear Room E Bus.
Analyzed Circuits:
- Pressurizer Pilot Operated Relief Valve, Block Valve RC11;
- Circuit for Pressurizer Sample Containment Vent Header Valve RC200 and Pressurizer Vapor Sample Valve RC239A;
- Power Feed to the Auxiliary Shutdown Panel; and
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 2, 2019, the inspector presented the Triennial Fire Protection Inspection results to Mr. Mark Kanz, Senior Communications Representative, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision
Procedure or Date
71111.05T Calculations C-FP-013.06-028 Four AFW Pump Ventilation Openings in Barriers 0
Calculation 15.12 Hydraulic Analysis for Fire Pump Sizing 07/27/1988
OPS-GOP-S119 Time Critical Operator Action Time Validation for Scenario: 07/25/2018
Serious Control Room Fire
OPS-GOP-S119 Time Critical Operator Action Time Validation for Scenario: 09/27/2012
Serious Control Room Fire
OTL-AOP-DBS101 Time Critical Operator Action Time Validation for Scenario: 08/17/2015
Serious Station Fire #1 Electrical Penetration Room
OTL-AOP-DBS102 Time Critical Operator Action Time Validation for Scenario: 08/07/2015
Serious Station Fire #2 Electrical Penetration Room
OTLC 2017SD Time Critical Operator Action Time Validation for Scenario: 01/05/2018
DBS103 TCOA (Five) Electrical Penetration Rooms 1 and 2
OTLC-2013-04 Time Critical Operator Action Time Validation for Scenario: 09/06/2013
Serious Station Fire #1 Electrical Penetration Room
OTLC-DB-2013-04 Time Critical Operator Action Time Validation for Scenario: 09/09/2013
Serious Station Fire #1 Electrical Penetration Room
Corrective Action CR 2017-05188 Rusting Fire Protection Piping 05/06/2017
Documents CR 2017-09149 Fleet Oversight Evaluation - Fire Protection Program Resolution 09/05/2017
Timeliness
CR 2018-00488 Fire Suppression Pipe Joint Connector Separation Causes Leak 01/18/2018
and Electric Fire Pump to Start
CR 2018-05840 DBAI 2018 SA Post-Fire MOVs Not De-energized 06/26/2018
CR 2018-08868 Calculation C-NSA-011.01.016 Does Not Consider Loss of UHS 10/09/2018
Inventory From TPCW Branch
CR-2018-00579 Corrective Actions to Improve Timeliness of Writing Condition 01/23/18
Reports Ineffective
Inspection Type Designation Description or Title Revision
Procedure or Date
CR-2018-03793 Additional Concerns Identified with Floor Settling on 585 Elev 04/24/2018
Near Seal Oil Room
CR-2019-03997 ACB 34564 Tripped Open 04/30/2019
Corrective Action CR 2019-03176 2019 NRC TriFP - B.5.b Hose Testing Documentation 04/04/2019
Documents
Resulting from
Inspection
Drawings 528-53116 Job No. A173D-28644 2
DB-OP-02600 Operational Contingency Response Action Plan 14
Drawing E-892, Raceway-Fire Alarm System Auxiliary Building Plan EL. 603'-0" 12
SH 4
Drawing E-892, Raceway-Fire Alarm System Auxiliary Building Plan EL. 565'-0" 9
SH 6
Drawing E-892, Raceway-Fire Alarm System Auxiliary Building Plan EL. 545'-0" 6
SH 7
E-52B Sh. 12 Elementary wiring Diagrams Reactor Cooling System RC PRZR 15
PWR RLF SHUTOFF VLV
E-699B Connection Diagram Radio System 1
E631B Sh.9 Connection Diagram Misc. Instruments Aux. BLDG. & CTMT. 3
EL.545-0
M-030A Piping & Instrument Diagram Reactor Coolant System 72
PFP-YD-STRAT Protected Area Yard Strategy 4
Miscellaneous FHAR Fire Hazards Analysis Report 28
ML033490026 Safety Evaluation of Fire Protection Measures at the Davis- 05/30/1991
Besse Nuclear Power Station, Unit No. 1, Per Appendix R to 10
CFR 50
None Staff Assignments and Fire Brigade Qualification Information for 05/01/2019
Crews 1 and 3
Inspection Type Designation Description or Title Revision
Procedure or Date
NDE Reports Report No. Visual Examination (VT) of Floor Drains in Electrical Penetration 05/06/2015
BOP-VT-15-035 Room #1
71111.05T DB-FP-00007 Control of Transient Combustibles 14
Procedures DB-FP-00009 Fire Protection Impairment And Fire Watch 22
DB-FP-00018 Control of Ignition Sources 12
DB-FP-04005 Fire Brigade Equipment Quarterly Inspection 15
DB-FP-04035 5 Year Flow Test 5
DB-ME-04100 Emergency Lighting System Test 16
DB-MM-09378 Limitorque Manual Actuator Installation When Fire Causes a 1
Motor Operated Valve to Fail (DH63, DH64, DH2733, and
DH2734)
DB-OP-02000 Emergency Procedure, RPS, SFAS, SFRCS TRIP, OR SG 31
TUBE RUPTURE
DB-OP-02501 Abnormal Procedure, Serious Station Fire 26
DB-OP-02508 Control Room Evacuation 16
DB-OP-02519 Abnormal Procedure, Serious Control Room Fire 24
DB-SP-03366 Surveillance Test Procedure for Reactor Coolant System Vent 24
Path Operability and PORV Test
DBBP-OPS-0036 B.5.b Equipment Inventory 5
ECP-16-0331 Make-up Flow Controller Valve Bailey RP1212 Converter 0
Replacement
NG-DB-00302 DBNPS Fire Protection Program 11
PFP-AB-237 Protected Area Pre-Fire Plan, Fire Area E 4
PFP-AB-427 Protected Area Pre-Fire Plan, Fire Area DF 4
PFP-AB-429 Protected Area Pre-Fire Plan, Fire Area Y 4
PFP-CB-A208 Protected Area Pre-Fire Plan, Fire Area AB 4 and 7
Inspection Type Designation Description or Title Revision
Procedure or Date
Work Orders WO 200704277 Encl 1 Emerge Light Emerg Lighting Sys Test 01/11/2019
WO 200459898 5 Year Flow Test 07/29/2014
WO 200499963 Tanks, Drains, and Basins Inspection 05/06/2015
WO 200655206 Damper Visual Inspection 18 Months 08/27/2018
WO 20084442 Door 119A Test 01/21/2019