Text

ust 28, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR DAVIS-BESSE NUCLEAR POWER STATION (REPORT 05000346/2018005)

Dear Mr. Bezilla:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Davis-Besse Nuclear Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9833 with any questions you have regarding this letter.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 Enclosure:

Inspection Plan cc: Distribution via LISTSERV

Letter to Mark Bezilla from Jamnes Cameron dated August 28, 2018 SUBJECT: UPDATED INSPECTION PLAN FOR DAVIS-BESSE NUCLEAR POWER STATION (REPORT 05000346/2018005)

DISTRIBUTION:

Christopher Cook RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18240A306 OFFICE RIII NAME JCameron:lg DATE 8/28/2018 OFFICIAL RECORD COPY

IP 22 Inspection Activity Plan Report Davis-Besse 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION 2 1 09/03/2018 09/07/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance DBA TEAM INSPECTION 6 1 09/17/2018 10/05/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RADIATION PROTECTION BASELINE INSPECTION 1 1 10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls BIENNIAL REQUAL PROGRAM INSPECTION 2 1 12/03/2018 12/07/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

RADIATION PROTECTION BASELINE INSPECTION 1 1 01/28/2019 02/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls SECURITY BASELINE INSPECTION 1 1 03/25/2019 03/29/2019 IP 71130.02 000734 Access Control TRIENNIAL FIRE PROTECTION INSPECTION 3 1 04/01/2019 05/03/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

RADIATION PROTECTION BASELINE INSPECTION 1 1 04/08/2019 04/12/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation EP EXERCISE INSPECTION / PI VERIFICATION 2 1 04/15/2019 04/19/2019 IP 71114.01 000716 Exercise Evaluation 1 04/15/2019 04/19/2019 IP 71151 001397 Performance Indicator Verification BIENNIAL PI&R INSPECTION 1 1 06/24/2019 07/12/2019 IP 71152B 000747 Problem Identification and Resolution RADIATION PROTECTION BASELINE INSPECTION 2 1 07/08/2019 07/12/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

8/21/2018 8:55:27 AM

IP 22 Inspection Activity Plan Report Davis-Besse 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count ISFSI Preoperational and Initial Loading Inspection 3Q2019 4 1 07/15/2019 07/19/2019 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1 07/15/2019 07/19/2019 IP 60856.1 001002 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 1 08/12/2019 08/16/2019 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1 09/09/2019 09/13/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants SECURITY BASELINE INSPECTION 2 1 08/05/2019 08/09/2019 IP 71130.07 000739 Security Training 1 08/05/2019 08/09/2019 IP 71151 001338 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1 08/28/2019 08/30/2019 IP 71130.14 000743 Review of Power Reactor Target Sets DBA PROGRAMS (EQ) 3 1 10/21/2019 10/25/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1 11/04/2019 11/08/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RADIATION PROTECTION BASELINE INSPECTION 1 1 10/21/2019 10/25/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SECURITY BASELINE INSPECTION 1 1 02/03/2020 02/07/2020 IP 71130.02 000734 Access Control INSERVICE INSPECTION 1 1 03/02/2020 03/20/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP Baseline Inspection 1 1 03/09/2020 03/13/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 03/09/2020 03/13/2020 IP 71124.04 000729 Occupational Dose Assessment SECURITY BASELINE INSPECTION 1 1 03/16/2020 03/20/2020 IP 71130.08 000740 Fitness For Duty Program 1 03/16/2020 03/20/2020 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

8/21/2018 8:55:27 AM

IP 22 Inspection Activity Plan Report Davis-Besse 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count 50.59 Inspection 3 1 03/23/2020 03/27/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments SECURITY BASELINE INSPECTION 1 1 04/06/2020 04/10/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance RP Baseline Inspection 1 1 05/11/2020 05/15/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.