September 1, 2020

SUBJECT:

UPDATED INSPECTION PLAN FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2020005)

Dear Mr. Dietrich:

The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Fermi Power Plant, Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The NRC plans to perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants at your facility.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these baseline inspections are being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

Additionally, during this period the NRC will perform inspections per Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01). This includes sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9739 with any questions you have regarding this letter.

Sincerely,

/RA/

Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket No. 05000341 License No. NPF-43 Enclosure(s):

Inspection Plan cc: Distribution via LISTSERV Letter to Peter Dietrich from Néstor J. Féliz Adorno dated September 1, 2020.

SUBJECT: UPDATED INSPECTION PLAN FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2020005)

DISTRIBUTION:

Jessie Quichocho Elise Burket RidsNrrDorlLpl3 RidsNrrPMFermi2 Resource RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML20244A328 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME RNg:wc via email NFéliz Adorno: via email DATE 8/24/2020 8/25/2020 OFFICIAL RECORD COPY

IP 22 Inspection Activity Plan Report Fermi 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count 2020 Fermi IMC 2561 Inspections 1 1 01/06/2020 12/31/2020 IP 37801 000009 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 1 01/06/2020 12/31/2020 IP 40801 000010 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 01/06/2020 12/31/2020 IP 71801 000023 Decommissioning Performance And Status Review At Permanently Suhutdown Reactors 1 01/06/2020 12/31/2020 IP 83750 000035 Occupational Radiation Exposure 1 01/06/2020 12/31/2020 IP 84750 000040 Radioactive Waste Treatment and Effluent And Environmental Monitoring 1 01/06/2020 12/31/2020 IP 86750 000045 Solid Radioactive Waste Management And Transportation Of Radioactive Materials Triennial Fire Protection Inspection 3 2 06/29/2020 07/23/2020 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Security Baseline Inspection 1 2 07/01/2020 08/31/2020 IP 71130.08 000740 Fitness For Duty Program 2 07/01/2020 08/31/2020 IP 71151 001338 Performance Indicator Verification 2 08/26/2020 08/27/2020 IP 71130.02 000734 Access Control 3Q CAL Follow-up - Torus Coatings 2 2 07/01/2020 09/30/2020 IP 92702 000238 Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders Security Baseline Inspection 1 2 09/08/2020 09/11/2020 IP 71130.05 000737 Protective Strategy Evaluation 2 09/08/2020 12/31/2020 IP 71130.09 001656 Security Plan Changes 2 09/14/2020 09/18/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance This report does not include INPO and OUTAGE activities. Page 1 of 5 This report shows only on-site and announced inspection procedures.

8/31/2020 1:27:25 PM

IP 22 Inspection Activity Plan Report Fermi 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline Inspection 1 2 10/12/2020 10/16/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation Fermi December 2020 Initial License Exam 3 2 11/15/2020 11/21/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 12/06/2020 12/12/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

OPC Temporary Instruction 2515/194 1 2 12/07/2020 12/11/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

Emergency Preparedness Exercise Inspection / Performance Indicator Verification 4 2 12/14/2020 12/18/2020 IP 71114.01 000716 Exercise Evaluation 2 12/14/2020 12/18/2020 IP 71151 001397 Performance Indicator Verification Design Bases Assurance Inspection (Programs) 3 2 01/11/2021 01/29/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Security Baseline Inspection 1 2 01/18/2021 01/22/2021 IP 71130.01 000733 Access Authorization 2 04/05/2021 04/09/2021 IP 71130.02 000734 Access Control 2 04/05/2021 04/09/2021 IP 71130.14 000743 Review of Power Reactor Target Sets Fermi May 2021 Initial License Exam NRC Developed 5 2 02/15/2021 02/19/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 04/04/2021 04/10/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 05/09/2021 05/15/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

This report does not include INPO and OUTAGE activities. Page 2 of 5 This report shows only on-site and announced inspection procedures.

8/31/2020 1:27:25 PM

IP 22 Inspection Activity Plan Report Fermi 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Fermi May 2021 Initial License Exam NRC Developed 5 2 05/16/2021 05/22/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Fermi 2021 Biennial Licensed Operator Requal Program Inspection 2 2 05/23/2021 05/29/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Radiation Protection Baseline Inspection 1 2 06/07/2021 06/11/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation Radiation Protection Baseline 1 2 06/21/2021 06/25/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Evaluations of Changes, Tests, and Experiments Inspection 3 2 06/25/2021 06/25/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments Radiation Protection Baseline Inspection 2 2 08/16/2021 08/20/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Inservice Inspection Fermi 2 1 2 09/13/2021 10/11/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Emergency Preparedness Baseline Inspection / Performance Indicator Verification 1 2 10/04/2021 10/08/2021 IP 71114.02 000717 Alert and Notification System Testing 2 10/04/2021 10/08/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2 10/04/2021 10/08/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 2 10/04/2021 10/08/2021 IP 71114.08 000723 Exercise Evaluation  Scenario Review This report does not include INPO and OUTAGE activities. Page 3 of 5 This report shows only on-site and announced inspection procedures.

8/31/2020 1:27:25 PM

IP 22 Inspection Activity Plan Report Fermi 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline Inspection 1 2 10/04/2021 10/08/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 10/04/2021 10/08/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Baseline Inspection 1 2 10/18/2021 10/22/2021 IP 71130.07 000739 Security Training 2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification 2 11/01/2021 12/31/2021 IP 71130.09 001656 Security Plan Changes Biennial Problem Identification and Resolution Inspection 4 2 10/18/2021 11/05/2021 IP 71152B 000747 Problem Identification and Resolution Security Baseline Inspection 1 2 02/14/2022 02/18/2022 IP 71130.02 000734 Access Control 2 02/14/2022 02/18/2022 IP 71151 001338 Performance Indicator Verification 2 03/07/2022 03/11/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance RP Baseline Inspection 1 2 03/07/2022 03/11/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2 03/07/2022 03/11/2022 IP 71124.04 000728 Occupational Dose Assessment Emergency Preparedness Exercise Inspection / Performance Indicator Verification 4 2 03/16/2022 05/20/2022 IP 71114.08 000723 Exercise Evaluation  Scenario Review 2 05/16/2022 05/20/2022 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 2 05/16/2022 05/20/2022 IP 71151 001397 Performance Indicator Verification Ultimate Heat Sink 2 2 03/28/2022 04/01/2022 IP 71111.07T 000700 Heat Sink Performance This report does not include INPO and OUTAGE activities. Page 4 of 5 This report shows only on-site and announced inspection procedures.

8/31/2020 1:27:25 PM

IP 22 Inspection Activity Plan Report Fermi 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count RP Baseline Inspection 1 2 05/16/2022 05/20/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program ISFSI Cask Loading Inspection 2Q2022 1 2 06/13/2022 06/17/2022 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities. Page 5 of 5 This report shows only on-site and announced inspection procedures.

8/31/2020 1:27:25 PM