IR 05000341/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2017005)
ML17240A334
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/28/2017
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Fessler P
DTE Energy
References
IR 2017005
Download: ML17240A334 (5)


Text

P. Fessle UNITED STATES ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2017005)

Dear Mr. Fessler:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Fermi Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC staff completed Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans at Fermi Power Plant, Unit 2 on January 27, 2017, to confirm full implementation of orders Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The results of the inspection can be found in inspection report 05000341/2017008.

P. Fessle -2-This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9827 with any questions you have regarding this letter.

Sincerely,

/RA/

Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 50-341 License No. NPF-43 Enclosure:

Inspection Plan cc: Distribution via LISTSERV