IR 05000338/1985037

From kanterella
Jump to navigation Jump to search
Insp Repts 50-338/85-37 & 50-339/85-37 on 851209-13.No Violation or Deviation Noted.Major Areas Inspected:Welding & NDT Associated W/Design Changes & Licensee Action on Previous Open Items
ML20140C915
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/07/1986
From: Blake J, Economos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20140C906 List:
References
50-338-85-37, 50-339-85-37, NUDOCS 8601290024
Download: ML20140C915 (8)


Text

.. - __ - - - - . . . . --. . .. . . . . . . . -

\

nafdo UNITED STATES l f 'o NUCLEAR REGULATORY COMMISSION

+

[ s # ,$ REGION 11 y 101 MARIETTA STREET,N.W.

i, * i *j ATLANTA, GEORGI A 30323

\...../

i

! Report Nos.': 50-338/85-37 and 50-339/85-37 Licensee: Virginia Electric and Power Company Richmond, VA 23261 Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7 Facility Name: North Anna 1 and 2

!

Inspection Conduct : December 9-13, 1985

~

Inspector: / 7 8(-

4 con Date Signed Appro ed by. . - / G

! d. 'J. Blake, Section Chief Date Signed l /EngineeringBranch

/ Division of Reactor Safety i

SUMMARY

i Scope: This routine, unannounced inspection entailed 32 inspector-hours on site in the areas of welding and nondestructive testing associated with design changes, licensee action on previous open items, review and evaluation of 4 ._ inservice inspection results, and eddy current tests of steam generator (SG)

tubes.
Results
No violations or deviations were identified.

I i

i

,

J

O

12g@$$IO G

l

!

- _ - -. - - - _ - - - . . . - . - - .

.--- - - . - _ - -.-

.

REPORT DETAILS Persons Contacted Licensee Employees E. W. Harrell, Station Manager

  • E. Kane, Assistant Station Manager
  • E. R. Smith, Jr. , Assistant Station Manager
  • J. A. Stall, Superintendent Technical Services
  • E. R. Bane, Superintendent Technical Projects
  • L. N. Hartz, Engineering Supervisor
  • Jay Leberstein, Licensing Coordinator J. C. Paul, NDE Coordinator R. E. Tegethoff, Staff Engineer, ISI Group K. B. Chrisman, Jr. , Welding Foreman B. C. Davis, Welding Foreman H. L. Travis, NDE-Level III Other licensee employees contacted included construction craftsmen, engineers, technicians, operators, and office personne NRC Resident Inspector
  • Branch, Senior Resident Inspector
  • Attended exit interview Exit Interview The inspection scope and findings were summarized on November 13, 1985, with those persons indicated in paragraph 1 abov Inspection findings listed below were discussed in detai (0 pen) Inspector Followup Item (IFI) 338, 339/85-37-01: Review of CAD Program, paragraph (0 pen) IFI 338/85-37-02: Examination of Transition Welds in S/Gs "A" and "C", paragraph The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspection. Licensee Action on Previous Enforcement Matters (907028)

(Closed) Unresolved Item (UNR) 339/83-10-02, U/T Procedure ISI-205 Calibra-tion Provisions and Examination of Accumulator Tank B Weld "3". In refer-ence to this item, previously discussed in Report No. 339/85-02, the

.

inspector noted that the calibration block needed for U/T examination of these welds has been purchased and was used in the current outage to examine weld No. 4 of Tank "C" in Unit 1. In that provisions for performing the required examination in Units 1 and 2 have been added to the ISI plan, this item is now close (Closed) Violation 339/84-34-01, Failure to Maintain Control Over Welding and Welding Materials. The licensee's closing action (s) on this item were reviewed on a previous inspection and documented in Report No. 339/85-1 However, the item remained open pending review and evaluation of the radio-graphs of the weld in question. The radiographs were reviewed during the current inspection and the item is closed.

4. Unresolved Items Unresolved items were not identified during this inspection.

5. Inspector Followup Items (927018)

(Closed) Inspector Followup Item (IFI) 339/84-34-02, Valve 2-RS-125 Threaded Fastener Corrective actions to prevent water from entering the safeguards building (valve pit) of Unit 2 have been implemented. Periodic inspections of this area are being conducted to verify that dry conditions are being maintaine Also, by memo from V. C. West to inspector N. Economos dated August 13, 1985, the licensee's cognizant engineer indicated that an inspection of all recirculation spray and safety injection valves in the pit showed the threaded fasteners had experienced some corrosion, and as a precautionary measure, steps were taken to replace them. While performing that task, the licensee discovered that the valves' bonnet bushings were frozen. A decision has been made to replace the existing Rockwell Edwards valves with a new type valv Because of Technical Specification time constraints on removing safeguard equipment from service while the plant is on line, it was decided to replace the valves during the next refueling outage. The inspector will follow this activity on a routine basis at that tim (Closed) IFI 338/84-34-03, Recirculation Spray HX Corrective Action. The licensee's corrective actions, planned and implemented, on this item were reviewed and documented in Report 338, 339/85-17. In that the measures taken to address the problem were applicable to both units, this item is close .

6. IE Bulletins (IEBs) (927038)

(Closed) IEB 82-02, Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary Components of PWR Plant By memoranda dated July 30, 1982, July 28, 1983, and November 28, 1984, the licensee submitted results of examinations and thereby has provided the staff the information requested by this Bulleti I

. . - - . -. - _ . - - __ -- _ _ . __ _ _ _

.

l Independent Inspection Effort (92706, 55050) Replacement of Isolation Valves at No. 4 Letdown Filte Replacement of two filter isolation valves, numbers 1-CH-302 and 1-CH-306 was in progress. This work was being done to correct leaking

'

valve seats which hampered line isolation and filter changes during power operation. Discussions with cognizant personnel disclosed that valve design and ALARA considerations made repair of the existing two inch Rockwell-Edwards globe valves, very difficult. The valves are in

line no. 2-CH-76-1502-QC, isometric drawing CH-19A. Welding procedures and welders were qualified per ASME Section IX requirements. Construc-

tion Code, ANSI B31.7-69, was invoked for acceptance criteria of welds

'

and subsequent nondestructive testing requirement Within these areas, the inspector observed the tack welds for field welds FW-5 and FW-6 and reviewed quality records for the following

items:

'

Component Serial Number / Heat Number Purchase Order Number Valve S/N BC-625 NS46325 Pipe Ht # 469916 NS12406 Elbow 90 , 2"0 ----

NS30683 Sock-o-l et Ht # 824AN NS30684 The modification was made on line GW-30-154-Q3 which appears on drawing

number GW-1161 The referenced engineering drawing was Stone and
Webster 730362/8447-M-303 Rev. O. The applicable code was identified as ANSI B31.7-69. Most of replacement piping had been prefabricated to

"

expedite task completion and minimize radiation exposure. The inspec-tor reviewed field documents, e.g., signoff sheets, IS0s, weld tickets, etc., to verify compliance with Code and regulatory requirements.

Also, the inspector observed completed weld Nos. 6D, 7D, 10D, 20D, 25D, i and 270 and reviewed quality records for the following welding material

3/32" E308-15 Ht. # 01714 i In addition, qualification records for the applicable weld procedure and welder assigned to this task were reviewed and found to be in order.

! The task of welding the replacement valves on the line was still in progress at the close of this inspectio Therefore, observation of the completed welds and review of completed quality records / package will be accomplished durin a future inspection.

,

I I

'

!

t

l

- - . - - - . . . _ . _ _ _ _ _ _ _ _ _ _ _ , , , - . _ _ _ __ ._ ,, _ _ __-__.- - __ --- -- _ _- -, - . - -

.

4 Design Change Package 84-47, Regulatory Guide (RG) 1.97, Transmitter Modification Rerouting of a gaseous waste vent line section to accommodate trans-mitter modification per RG 1.97 was in progress at the time of this inspectio Heat Number / Purchase Component Serial Number Order Number Pipe, 4" 0 Sch. 80 V 72258 58473 Pipe, 4" 0 Sch. 40 L 01026 64049 Elbow 90 D-42 64049 Elbow 45 D-14, K5EX 64049 Cap A234WPB/Ht3607 58473 E705-2, 3/32" 0 411 x 9641 031 E70S-2, 1/8" 0 97402 033 Qualification records for the applicable weld procedure (procedure qualification record (PQR) 101) and welders with S/Ns N-200, -216,

-220, -227, and -246 were reviewed and found to be consistent with applicable code requirement Welding on the modification was in progress at the completion of this inspection. Therefore, observation of the completed welds and a review of the completed work package will be accomplished during a future inspectio Within the areas inspected, no deviations or violations were identified.

8. Inservice Inspection - Program Review (73051) (Unit 1)

The inspector reviewed aspects of the licensee's inservice inspection (ISI)

program for completeness and conformance with regulatory requirements and the licensee's commitments. Based on the licensee's Technical Specification and 10 CFR 50.55a, the applicable code for ISI is currently ASME Section XI (74575). Steam generator tube eddy current examinations are required to be in accordance with NRC Regulatory Guide 1.83, Rev.1. Augmented ISI exami-nations are specified for certain steam generator (SG) support welds in Section 4.4.10.2 of the Technical Specifications; and in accordance with licensee augmented ISI requirements for SG snubbers are described in the FSAR Sections 5.5 and 5.7 In addition, the FSAR (Section 3.6.2 and Comment C.2) indicates increased inspection for certain high energy piping welds and valve The inspector reviewed and discussed the licensee's ISI examination program documents with cognizant site personnel to determine whether the documents included:

-- .-_ _ _ _ _ . _

. _ . _ _ _ _

__

.

5 Appropriate licensee approvals Identification of proper scope of inspection including:

(1) ASME Section XI required examination areas, categories, methods and extent (2) Augmented ISI and steam generator tube ISI examinations specified as described in the FSAR and Technical Specifications Properly specified inspection intervals and extent of inspection during each interval. Provisions for proper administrative controls and records including:

(1) Examination results and data sheets (2) Identification of equipment used (3) Calibration data (4) Identification of calibration blocks Documents reviewed by the inspector relative to the above areas included:

-

Inservice Inspection Plan of the North Anna Nuclear Power Plant Unit 2

-

ADM 5.28, Procedure Revisions Due to Design changes The inspector discussed the ISI program with cognizant licensee personnel and noted that the IS0s in the ISI plan for North Anna do not necessarily reflect existing as-built condition Therefore, the inspector could not verify that the number of welds identified for ISI examinations meet inspection requirements of the categories under Tables IWB-2500/IWC-2500 of Section XI of the ASME Code.

In response to this observation, the inspector was informed that NUTECH is under contract to review the licensee's entire ISI program and this is one of the areas being addressed. Specifically, NUTECH is developing a computer aided drafting (CAD) program that will assist the licensee's corporate ISI group to keep abreast with design changes that may impact the ISI program requirement The inspector expressed interest in reviewing NUTECH's program and changes to the ISI program resulting from this work. Inspector Followup Item 338, 339/85-37-01, Review of CAD Program, was identified until this review can be performed on a future inspectio I I

l l

l

b

_ . _ _ . .._ __ _ _ . _ _ .. _ . . _ - - . _ _ . _ _ _ ._ _ .-- _

.

.

6 Inservice Inspection - Data Review and Evaluation (737558) (Unit 1) Eddy Current Inspection Steam Generator Tube ,

Results of the eddy current inspection were discussed with cognizant

! licensee engineer The inspector was advised that the examination was expanded to include 100% of the tubes in each of the three steam generators (S/Gs) with the following results:

!

S/G Tubes Plugged A 9

-

B 17 C 47 i

Two tubes were pulled from S/G "C" by Westinghouse. These tubes will

! be examined to determine the cause for pronounced wall degradation j identified by eddy current in this steam generato Results of this

, examination will be reviewed as they become availabl i l Ultrasonic Examination Record Review j Selected records of ultrasonic examination (U/T) results were reviewed i for accuracy completeness and compliance with Code and regulatory requirements. The applicable Code is identified in paragraph 8 of this repor Comments /

Component Weld Examination Method Results

!

j 1. Accumulator FW-4 U/T 0, , 45 , 60 Clear l Tank C i

! 2. S/G "B" Girth Inspected four, two No

Weld 6, foot sections on ID Recordable Transition of S/G by MT; Indication i weld inspected weld and noted j' 2" below and 6"

! above joint 3. M.S. Header Weld U/T 0 , 46 , 60 Clear FW-343 In reference to item two (2) above, the inspector reviewed the exami-

. nation results and related documents which included internal memoranda

! discussing the potential for cracking in this weld using Surry and l Indian Point-3 as examples. Because of these experiences, the memo-i randa requested the site to examine the transition weld in each of the j three S/Gs during this outage. However, because of difficulties in i

O

.

scheduling and other considerations, management decided to examine S/G

"B" weld during this outage and schedule S/Gs A and C for the 1987 refueling outage. The inspector stated that an inspector followup item would be identified pending examination of these S/G welds and evalua-tion of results, IFI 338/85-37-02, Examination of Transition Welds in S/Gs "A" and "B".

Within the areas inspected, no violations or deviations were identifie !