IR 05000334/1997001

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/97-01, 50-412/97-01,50-334/97-02 & 50-412/97-02 on 970703
ML20210R834
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 08/27/1997
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
References
50-334-97-01, 50-334-97-02, 50-334-97-1, 50-334-97-2, 50-412-97-01, 50-412-97-02, 50-412-97-1, 50-412-97-2, NUDOCS 9709030424
Download: ML20210R834 (2)


Text

.

.

August 27, 1997 Mr. J. President Generation Group Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077 '

SUBJECT: INSPECTION REPORT NOS, 50 334;412/97 0102 REPLY

Dear Mr. Cross:

This letter refois to your August 1,1997, correspondence, in response to our July 3,1997, letter.

Thank you forinforming us of the corrective and preventive actions documented in your im sr.

These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

.

.

Peter W. Eselgroth, Chief Project Branch No. 7

.

Division of Reactor Projects Docket Nos. 50 334; 50-412 cc:

Sushil C. Jain, Vice President, Nuclear Services-R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager W. Kline, Manager, Nuclear Engineering Department B. Tulte, General Manager,-Nuclear Operations Unit K. L. Ostrowski, Manager, Quality Services Unit J.- Arias, Director, Safety & Licensing Department

-_ M. Clancy, Mayor  !

'

(hf

,

Commonwealth of Pennsylvania State of Ohio > l 9709030424 970827 gDR ADOCK050003]4 lllll]lllll

__

- _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _

,

.

! J. Distribution:

l Region l Docket Room (with concurrences)

l PUBLIC

'

Nuclear Safety Information Center (NSIC)

NRC Resident inspector W. Axelson, DRA P. Eselgroth, DRP

' D. Haverkamp, DRP A. Keatley, DRP J. Stofr, PDI 2, NRR-D. Brinkman, PM, PDI 2, NRR W. Dean, OEDO R. Correia, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, NRR (IPAS)

i DOCUMENT NAME: G:\ BRANCH 7\BV\970102.RL-n . , .e w. .u . we.. m m. w. c . copy wiinout .it. cam.nii.ncio.u,.  : . co , . in .ti..s nti.ncio.u,, =.N..,

OFFICE Rl/DR1, I Rl/ORP 2 ,) / I I(

NAME KERTE/2.-- ESELGR P DATE 08/27/97 08/ 27/97 08/ /97 08/ /97 08/ /97 0FFICIAL RECORD COPY

. _ _ _ _ _ ._ . _ .

'i- -

-

. . . - .. _ . . . . .

.. .

_, _ ., .

. . .

-__ - _ - - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  • . .

'*' Be vet Va liy Po*+t $tahon

$Nppmpport. P A 16077 0004 HONALD L LeGRAND Hit) 393 7622 u ** erst o e a d Plant Manage'

Auguet !, 1997 1.-97-001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 0001 Subject: Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50 334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Reply to Notice of Violation EA 97-255 In response to NRC correspondence dated July 3,1997, and in accordance with 10 CFR 2.201, the attached reply addresses the Notice of Violation transmitted with the letter.

The cited events were discussed in NRC Inspection Report Nos. 50-334/97-01, 50-412/97-01 and 50-334/97-02, 50-412/97-02 and also during a Predecisional Enforcement Conference held on June 13,1997.

Please note that some of the compledon dates for the programmatic enhancements to the Technical Specification surveillance program have been revised from the dates discussed in the Predecisional Enforcement Conference to reflect changes in work scope.

The specific revisions are identified in the body of the response. These changes also supersede the applicable dates provided in Licensee Event Repoits (LER) 50 334/97-011-00 (Corrective Action No. 2), LER 50-334/97-013-00 (Corrective Action No. 6),

LER $0-334/97-014-00 (Corrective Action No. 5), and LER 50-412/97 003-00 (Corrective Action No. 5).

If there are any questions concerning this response, please contact Mr. J. Arias, Director, Safety & Licensing at (412) 393 5203.

Sincerely, q/70 g, -

.

kd Ronald L. LeGrand x '

c: ir. D. M. Kem, Sr. Resident inspector D.filyt RING Mr. H. J. Miller, NRC Region I Administrator 0UAiiIY Mr. D, S. Brinkman, Sr. Project Manager EN[RGV

.

, , , . _ . . . _ . _ - - - . -

_ - - - - - _ _ - - _ .- _ . _ _ _

,

.. .

AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER )

Subject: Beaver Valley Power Station, Unit No. I and No. 2 BV 1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, Lleense No. NPF-73 Reply to Notlee of Violation EA 97-255 ,

Before me, the undersigned notary public, in and for the County and

,

Commonwealth aforesaid, this day personally appeared Ronald L. LeGrand, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Operations and Plant Manager of the Nuclear Power Disision, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, infonnation and belief.

,

d' '% (?

-

Ronald L. LeGrand Subscribed and sworn to before me on this/I/ day of R,f/

f /9f/ .

Ide. 701 9dt/n Y

'/ Notary Public E

,yj,"{,syP

g _

g,spggon

, . = , .e,,,,,, . set

- 26.

= - -

. - -

. . .

.. . . . .

.. . . . . . . . .

.

. _ . _ _

_ __ _ _ _ _ _ _ _ _ _ _

., .

'

'

DUQUESNE LIGilT COMPANY l .

Nuclear Power Dh'ision i

Beaver Valley Power Station, Unit Nos. I and 2 Reply to Notice of Violation Letter dated July 3.1997 VIOLATION (Severity Level lilt Supplement I)

EA 97-255 Unit I and Unit 2 Technical Specification (TS) 4.0.2 require that, each surveillance requirement shall be performed within the specified time interval.

1. Unit 1 TS 4.8.1.1.2.b.5 requires that each diesel generator shall be demonstrated OPERABLE at least once per 18 months during shutdown by verifying the diesel generator operates for greater than or equal to 60 minutes while loaded to greater than or equal to 2750 KW.

Contrary to the above, on April 11,1996, and April 20, 1996, during emergency diesel generator (ECO) surveillance tests, the load test values used were inadequate to ensure that the EDGs achieved 2750 KW due to inaccuracies in the kilowatt meter instrument loop. Specifically, the EDGs had to be tested to at least 2875 KW to account for meter inaccuracies; however, EDO 11 was tested at 2850 KW on April 20,1996, and EDO l 2 was tested at 2800 KW on April 11,1996. These were the only EDG surveillance tests perfonned to meet TS 4.8.1.1.2.b.5 during the 18-month period. (01013)

2. Unit I and Unit 2 TS 4.4.6.3.1 require, in part, that leakage testing of reactor coolant system (RCS) pressure isolation valves (PlVs) listed in Table 4.4. 3 shall be accomplished prior to entering Mode 2 after every time the plant is placed in the COLD SHUTDOWN condition for refueling. Unit 1 TS Table 4.4-3 includes, in part, residual heat removal (RHR) system inlet isolation valves MOV RH-700 and MOV-RH-701. Unit 2 TS Table 4.4-3 includes, in part, RHR system inlet isolation valves 2RHS MOV701 A,2RHS-MOV702A,2RHS-MOV701B, and 2RHS-MOV702B, Contrary to the above, Unit I reactor coolant system (RCS) pressure isolation valves MOV RH-700 and 701 were not leak tested prior to entering Mode 2, after placing the unit in cold shu'Jown on March 23, 1996. Additionally, Unit 2 RCS pres:ure isolation valves 2RHS MOV701 A(B) and 2RHS MOV702A(B) were not leak tested prior to entering Mode 2, after placing the unit in cold shutdown on September 1, 1996.(01023)

_ _ _ i

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. . .

' * ,-

l Reply to Nstice cf Vi:lati:n Page 2 l

3. Unit I and Unit 2 TS 4.6.4.2.b.4 require that each hydrogen recombiner system shall be demonstrated OPERABLE at least once per 18 months by verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground test immediately following the functional test required by TS 4.6.4. 2.b.3.

Contrary to the above, on March 24, 1996, the integrity of Unit I hydrogen recombiner IA and IB heater circuitry was not verified immediately following the functional tests of the recombiners. On September 1,1996, the integrity of Unit 2 hydrogen recombiner 21A and 21B heater circuitry was not verified immediately following the functional tests of the recombiners. (01033)

4. Unit I and Unit 2 TS 4.3.1.1.1 require that each reactor trip system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CAllBRATION, and CHANNEL FUNCTIONAL TEST operations during the modes and at the frequencies shown in Table 4.3 1.

Unit I and Unit 2 TS 4.3.2.1.1 require that each engineered safety feature actuation system (ESFAS) instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION, and CHANNEL FUNCTIONAL TEST operations during the modes and. at the frequencies shown in Table 4.3-2.

Unit I and Unit 2 TS 4.3.2.1.2 require that the logic for the interlocks shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by interlock operation.

Contrary to the above, prior to March 24,1997, and March 27,1997, respectively, the Unit I and Unit 2 reactor coolant system loop stop valve position block signals were not tested during bimonthly channel functional testing for ESFAS instrumentation, and channel functional testing for reactor trip system instrumentation, in addition, an ESFAS P-4 interlock logic diode in the Unit I and Unit 2 solid state protection system logic circuits was not tested during channel functional testing. These testing omissions resulted in failure to demonstrate the interlock logic and the interlock function operable. (01043)

5. Unit I and Unit 2 TS 4.0.5.a.2 require that inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(f).

Unit 1 TS 4.7.7.2.b.1 requires that the bottled air pressurization system shall be demonstrated OPERABLE at least once per 18 months by verifying that a

_

'

chlorine / control room high radiation / containment phase B isolation test signal-from

__ _ _ ____ _ - _ _____

'

.. .

-

  • , Reply to N:tice cf Vi:lati:n Page 3 cither Unit will initiate system operation. Unit 2 TS 4.7.7.1.e.6 requires that the Control Room Emergency Air Cleanup and Pressurization System shall be demonstrated OPERABLE at least once per 18 months by verifying that a chlorine / control room high radiation / containment phase B isolation signal will initiate

- operation of the bottled air pressurization system.

Operating Surveillance Test 1/20ST-44A.ll, " Chlorine Actuation of Control Room-Isolation /CREBAPS Systems," implements the surveillance requirements and requires that the stroke times for the discharge trip valves do not exceed a prescribed ASME limiting stroke time. The test also requires that, if the discharge trip test valves exceed their previously recorded stroke times by greater than 50%, the test frequency will be increased to monthly.

Contrary to the above, CREBAPS discharge trip valves TV VS-101 B, D, and E were not stroke time tested between January 29 and March 22, 1997, following a 50%

stroke time increase measured during performance of I /20ST-44 A.11 on January 28,

-1997.(01053)

6. Unit 1 TS 4.1.2.2.b and Unit 2 TS 4.1.2.1.b require that at least oac of the required boron injection flow paths shall be demonstrated OPERABLE at leist once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, scaled or otherwise secured in position, is in its correct position.

Contrary to the above, prior to March 25,1997, the monthly boron injection flowpath operability verifications were not satisfactorily completed. Specifically, position verifications for boron injection flowpath valves MOV-lCH-289 and 310 and ICH-83 and 86 on Unit I and 2CHS MOV289 and 310 on Unit 2 (valves which were not locked or secured in position) were not performed. (01063)

These violations are classified in the aggregate as a Severity Level III problem (Supplement I),

Reason for the Violations The root cause of the violations was inadequate management oversight and control of the TS surveillance program. Contributing factors were weaknesses in the procedures, scheduling, coordination and communication processes used for surveillance testing.

.- _

_ _ _ _ - _ _ _

'

.. :.

,i -- Reply to N:tice of Violation -

Page 4 Corrective Actions Taken and Results Achieved ~

li The specific details regarding this violation including corrective actions were provided by Licensee Event Report (LER) 50-334/97-002-00 dated March 19,1997, 2. The specific details regarding this- violation including corrective actions were provided by LER 50-334/97-003-00 dated March 24,1997,

- 3, The - specific- details regarding this violation including corrective actions were

_

provided by LER 50-334/97-004-00 dated March 28,1997,

,

4 The specific details regarding this violation including corrective actions were provided by LER 50-334/97-006-00 dated April 21,1997,

' 5. The specific details regarding this violation including corrective actions were provided by LER 50-334/97-007-00 dated April 21,1997, 6. The specific details regarding this violation including corrective actions were provided by LER 50-334/97-008-00 dated April 22,1997, An assessment of the TS surveillance requirements for Units 1 and 2 was performed by -

the- Quality Services Unit by April 10,1997, .This assessinent reviewed- each TS surveillance requirement to determine if the wording implied that the surveillance was to be performed in a specific scheduling sequence or if it was mandated following a specific plant event. This essessment was reviewed by Opersions, and-procedure changes ~were initiated to incorporate clarifications when necessary.

- Actions Taken to Prevent Recurrence The following programmatic enhancements to the TS surveillance program are being made:

+ v evaluation of the adequacy of surveillance procedures that implement TS will be coCucted to ensure that the procedures implement the required testing. This evaluation and-appropriate procedure revisions will be completed for Units 1 and 2 by Januaiy 30,1998.

  • The current processes for revising / preparing TS surveillance procedures will be revised to include a technical review led by the System and Performance Engineering -

Department (SPED) for intent changes. These processes will be revised by August 29,1997, This date has been revised from the July 31,1997 date discussed at

_ .

-

--

- _ - _ _ _ _ - _ _ - _ _ _ _ _ _ _

.',

_ ._

.;, Reply to Notice of Violation Page 5 the Predecisional Enforcement Conference on June 13,1997, due to changes in work scope, e The coordination and scheduling process for TS surveillances will be centralized under the responsibility of the Work Management Manager. Additional resources will be allocated to incorporate the surveillance schedule into the on-line scheduling system. These improvements will be completed by November 30,1997. This date has been revised from the July 31, 1997 date discussed at the Predecisional Enforcement Conference, due to changes in work scope.

A self-assessment of the TS surveillance program will be conducted during the second quarter of 1998. Any significant deficiencies resulting from this self-assessment will be addressed through the Condition Report program.

Date When Full Comoliance Will Be Achieved Full compliance was achieved for each of the six violations discussed above with the completion of the immediate corrective actions for the LERs referenced above.

The procedure revisions that are being made as a result of the Operations review of the QSU assessm:nt will be completed by October 1,1997.

The programmatic enhancements to the TS surveillance program will be completed as follows: >

e The evaluation of the adequacy-of TS surveillance procedures and . appropriate procedure revision will be completed for Units 1 and 2 by January 30,1998.

. The processes for revising / preparing TS surveillance procedures will be revised to include a technical review led by SPED for intent changes by August 29,1997.

. The coordination and scheduling process for TS surveillances will be improved by November 30,1997.

The self assessment of the TS surveillance program will be completed by June 30,1998.

..

.