Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 & 2 (Report 05000317-12-001 and 05000318-12-001)
ML13060A272
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/04/2013
From: Darrell Roberts
Division Reactor Projects I
To: George Gellrich
Constellation Energy Nuclear Group
References
IR-12-001
Download: ML13060A272 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2012001 AND 05000318/2012001)

Dear Mr. Gellrich,

On February 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Calvert Cliffs Nuclear Power Plant Units 1 & 2 (Calvert Cliffs). The NRC reviewed the most recent quarterly performance indicators, in addition to inspection results and enforcement actions, from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Calvert Cliffs operated in a manner that preserved public health and safety and met all cornerstone objectives. Calvert Cliffs was in the Regulatory Response Column of the NRCs Reactor Oversight Process Action Matrix until the third quarter 2012, due to one or more greater-than-green security cornerstone inputs as described in inspection report 05000317/2011403 and 05000318/2011403 dated July 27, 2011. The NRC determined the performance at Calvert Cliffs during the third quarter 2012 was within the Licensee Response Column because all inspection findings had very low (i.e., green) safety significance, all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., Green), and a supplemental inspection was successfully completed for the greater-than-green inputs on December 15, 2011. Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and Temporary Instruction (TI) TI-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Daniel Schroeder at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-317, 50-318 License Nos.: DPR-53, DPR-54 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML13060A272 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME SShaffer SKennedy/sws for * DSchroeder DRoberts DATE 02/26/13 02/26/13 02/26/13 03/04/13

Page 1 of 2 Calvert Cliffs 02/27/2013 15:51:30 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111108P - U2 INSERVICE INSPECTION 1 2 02/25/2013 03/01/2013 IP 7111108P Inservice Inspection Activities - PWR 71124 - RADIATION SAFETY INSPECTION 1 1, 2 02/25/2013 03/01/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 71124.08 - RADWASTE 1 1, 2 04/08/2013 04/12/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION SAFETY INSPECTION 1 1, 2 05/06/2013 05/10/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 05/06/2013 05/10/2013 IP 71151 Performance Indicator Verification 71124 - RADIATION SAFETY INSPECTION 1 1, 2 07/15/2013 07/19/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 07/15/2013 07/19/2013 IP 71124.04 Occupational Dose Assessment PI&R - PI&R 5 1, 2 09/09/2013 09/13/2013 IP 71152B Problem Identification and Resolution 1, 2 09/23/2013 09/27/2013 IP 71152B Problem Identification and Resolution 7111111B - CALVERT REQUAL INSP WITH P/F RESULTS 2 1, 2 11/18/2013 11/22/2013 IP 7111111B Licensed Operator Requalification Program EP EXER - EP EXERCISE INSPECTION 2 1, 2 10/21/2013 10/25/2013 IP 7111401 Exercise Evaluation TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 10/21/2013 10/25/2013 IP 7111105T Fire Protection [Triennial]

1, 2 11/04/2013 11/08/2013 IP 7111105T Fire Protection [Triennial]

71124 - RADIATION SAFETY INSPECTION 1 1, 2 12/09/2013 12/13/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/09/2013 12/13/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/09/2013 12/13/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/09/2013 12/13/2013 IP 71124.04 Occupational Dose Assessment 1, 2 12/09/2013 12/13/2013 IP 71151 Performance Indicator Verification 7111108P - U1 INSERVICE INSPECTION 1 1 02/17/2014 02/28/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 02/27/2013 15:51:30 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71003 - U1 LR COMMITMENTS PHASE 1 INSP - OUTAGE 1 1 02/24/2014 02/28/2014 IP 71003 Post-Approval Site Inspection for License Renewal 71124 - RADIATION SAFETY INSPECTION 1 1, 2 02/24/2014 02/28/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/24/2014 02/28/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/24/2014 02/28/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/24/2014 02/28/2014 IP 71124.04 Occupational Dose Assessment 1, 2 02/24/2014 02/28/2014 IP 71151 Performance Indicator Verification TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1, 2 03/10/2014 03/14/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - RADIATION SAFETY RETS 1 1, 2 05/05/2014 05/09/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 05/05/2014 05/09/2014 IP 71151 Performance Indicator Verification 7111107T - TRIENNIAL HEAT SINK 1 1, 2 05/19/2014 05/23/2014 IP 7111107T Heat Sink Performance 71003 - U1 LR COMMITMENTS PHASE 2 INSPEC 4 1 05/19/2014 05/23/2014 IP 71003 Post-Approval Site Inspection for License Renewal 1 06/02/2014 06/06/2014 IP 71003 Post-Approval Site Inspection for License Renewal This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.