Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken
ML18219B575
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/29/1978
From: Shaller D
American Electrtic Power System, Indiana Michigan Power Co
To: James Keppler
NRC/RGN-III
References
LER 1978-037-00
Download: ML18219B575 (19)


Text

1~M REGULATORY f3XglMBUTIO5 FOR REC:'KEPPI ER J G NRC INFORMAT('ON'ISTRIBUT'ION SYSTEM (RIDS)WNCOMING NA'TERIAL.*50-316 1f~'I ORG: SHALLER D V DOCDATE: 06/29/78 IN 5 MI PWR DATE RCVD: 07/05/78 t DOCTYPE: LETTER NOTARIZED:

NO COPIES RECEIVED SUBJECT: LTR 1 ENCL 1 LICENSEE EVENT'EPT (RO 50-316/78-037>

ON 06/15/78 CONCERNlNG BOTH EMERGENCY DIESEL GFNERATORS WFRF PLACED Ihl A CONDITION WHERE NEITHER ENGINE WAS CAPABLE OF AUTOMATIC START, IN VlOLATION OF APPENDIX ATECH, SPEC 3.8.1.1....W/ATT.i PLANT NAME: COOK-UNI T 2 REVlEWER INITIAL: XJM DISTRIBUTOR INITIAL:~HHHH~4+4HHHHI+~>~+

DISTRIBUTION'F" TH'IS MATERIAL'IS AS FOLLOWS NOTES: 1..EhlD 3 COPIES OF Al L MATERIAL TO ISE ED REEVES-1 CY ALL MATERIAL INCIDENT REPORTS (DISTRIBUTION CODF AOOZ)FOR ACTION: INTERNAL: BR C.F LWRNZ BC~~~W/4 ENCL ECi-wwW/ENCL E~~Wf9 ENCL 5 C SYSTEMS BR+<W/ENCL NOVAK/CHECK++W/ENCL AD FOR ENG4+W/ENCL HANAUER~~W/ENCL AD FOR SYS 4 PRO J~HEW/ENCL ENGINEERING BR+4kW/ENCL KREGFR/J.COLL INS+~W/ENCL K SEYFRI 7/IE++W/ENCL NRC PDR4+W/ENCL MIPC+@W/3 ENCL P EMERGENCY PLAN BR<<W/ENCL EEB++W/ENCL PLANT SYSTEMS BR<<W/EhlCL AD FOR PLANT SYSTEMS~+W/FNCL REACTOR SAFETY BR<<W/ENCL VOLLMER/BUNCH~4W/ENCL POWER SYS BR4+W/ENCL EXTERNAL: LPDR S ST.JOSEPH M I 4 4ll/ENCL T I C++W/ENCL NSI C~~~W/ENCL ACRS CAT B~~~W/16 ENCL DISTRIBUTION:

LTR 45 ENCL 45 SIZE: 2P+iP+6P%%%%%%%%%%%%%%%%4%%4%%%%%%%%4HHHM+%

THE END CONTROL NBR: 781870118 IVISION ITLE ITY MASTER ROSTER PUBL ICATIONS ST~ZIP DISTRIBUTION CODES 1 D ISTR I BUT ION QTY 1 D ISTRIBUTION CODES 18 17--~;,-I 17 34----J I------DISTRIBUTION CODES 55-50--I I-----DISTRIBUTION QTY 55-50--....-I QggQggQQgQgg~gg+QggQggQg+Qg~

gggCQggggggCg+Qgggggg+IttI+gggg+g+ggggggQQg+gQgQ+gQ+QPgQQ A J OLLA SN SR SF SE SM SP ST SO SA SG 1 1 1 1 1 1 1 1 1 l.CA 92038 A J OLLA S f=SH 5~Sf 0 S 1 1 1 1 I 1 1 1 1 1 CA 92038 JOLLA CA 92038 AD CW 1 1 JOLLA CA 92038 CW 1 JOLLA, 1 CA 92038 JOLLA CA 92038 CH SN SR SF SE SM SP ST SO SA SG Yf AY CW 1 CA 92064 TA 1 1 1 1 CA 92083 OF P VS OC O L RAR DIEGO LA JOLLA CA 92093 Ct p ETlOPIDhh INDIANA&NlCHIGAN PDWER CDNPANY DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 June 29, 1978 Mr.J.G.Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 C)(/)Cf~%~C.)Car)r.'c re)Ctt)Operating License DPR-74 Docket No.50-316 fig c hen r"~~"<Pl 4c CD V>C))~C))CD t

Dear Mr.Keppler:

On June 16, 1978, we informed NRC Region III verbally and in writing of a violation of the Unit 2 Appendix A Technical Specification Section 3.8.1.1b wherein both emergency diesel generators were inadvertently removed from service during maintenance.

Our investigation into this event is completed and this report is submitted as required by Appendix A Technical Specification Section 6.9.1.8~We have discussed this serious matter with management of the American Electric Power Service Corporation and together formulated the"Corrective Actions Taken to Prevent Recurrence." I believe these actions will go a long way towards not only preventing recurrence of this event on the emergency diesel generators, but will also prevent similar incidents from occurring on other safety-related equipment.

The American Electric Power Service Corporation management was at the'plant on May 3-4, 1978, to discuss the urgent need to reduce the number of Licensee Event Reports,.'t that time we jointly, came up with several action items which are being fol'lowed through to stem potential:problems at the source.Although this recent incident is particularly disturbing, we in management are taking positive steps to enhance the quality of our operations and the support of.the plant by the American Electric Power Service Corporation.

In addition to the corrective actions stated in the attached Licensee Event Report, we will review our current practice of training the plant operating and maintenance staff for work of this type and will augment retraining and requalification as necessary.

Sincerely, D.V.Shaller Plant Manager cc: See Attached List JUL 03 f978 1~'

r.J.G.Keppler~~une 29, 1978 Page 2 of 2/bab cc: J.E.Dolan R.W.Jurgensen R.F.Kroeger R.Kilburn R.J.Vollen BPI K.R.Baker RO: III R.C.Callen MPSC P.W.Steketee, Esq.R.Walsh, Esq.G.Charnoff, Esq.G.Olson J.M.Hennigan PNSRC J.F.Stietzel R.S.Keith Dir., IE (40 copies)Dir., MIPC (4 copies)

J (y r p','~j'

1)IRC FORM 366 I7.7J)LICENSEE EVENT REPORT U.S.NUCLEAR REGULATORY COMMISSION

~o 7 8 CON'T~O 7 8 CONTROL BLOCK I M I D C C 2 02 9 I.ICENSEE CODE 14 15 ,Q (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

LICENSE NUMBER 3 Q~Q 25 26 LICENSE TYPE 30 57 CAT 58 0 Qs 0 EVENT DATE 74 75 REPORT DATE 80 sooo,~LQs 0 5 0 0 0 3 I 6 Q7 60 61 DOCKET NUMBER 68 69 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES 010 UNIT OPERATING IN MODE 1.BOTH EMERGENCY DIESEL GENERATORS WERE PLACED I~O3~O4~OS~OB~O7 N A CONDITION WHERE NEITHER ENGINE WAS CAPABLE OF AUTOMATIC START IN'IO LATION OF APPENDIX A TECHNICAL SPECIFICATION 3.8.1.1.THE TWO INDEPENDEN T OFFSITE POWER SUPPLIES WERE AVAILABLE AND OPERABLE FOR THE TWO HOURS A ND 54 MINUTES THAT THE EMER.DIESEL GENERATORS WERE INOPERABLE.

THIS IS THE FIRST EVENT OF THIS TYPE.~OB 7 8 80 7 8 SYSTEM CAUSE CAUSE COMP.VALVE.CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE Q11 LJLj Q12~LJLI Q13 Q14~Q13 LZI Q13 9 10 11 12 13 18 19, 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERiRP EVENT YEAR REPORT NO.CODE TYPE NO.Q"27337~76~~03 7 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDR PRIME COMP.COMPONENT TAKEN ACTION ON PLANT.METHOD HOURS 022 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER

~H.Q13~HQ73~ZQ23~ZQ>>0 0 0 0 Y Q23~NQ24'ZQ23 Z 9 9 9 Qos 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 027 o THE AUXILARY E UIP I ILOT VALVES ON THE AB EMER DIESEL GEN INSTEAD OF CD EMER DI 4 ISTAKE.DOORS TO ALL 4 EMER DIESEL GEN ROOMS WERE LABEL'ED.'"AUXIL'IARY'E U IPMENT7 OPERATOR WAS REPRIMANDED.

EVENT WAS DISCUSSED WITH ALL SENIOR SHI FT OPERATING PERSONNEL BY OPERATIONS SUPERIHEMDENT.

7 8 9 FACILITY~3P METHOD OF STATUS 96 POWER OTHER STATUS~-DISCOVERY 3~BQ23~06 3 Qos NA~AO3i RELEASING 7 8 9 10 12 i3 44 45 46 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY~~Z 033 Z 034 NA 7 8 9 10 44 45 PERSONNEL EXPOSURES NUMBER TYPC DESCRIPTION 039 7~00 0 Q37 Z Qos NA 7 8 9 11 12 13 PERSONNEL INJURIES[ii~]~00 0 Qo NA 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY 043 TYPE DESCRIPTION g Z 042 NA 7 8 9 10 PUBLICITY ISSUED DESCRIPTION 046 o~NO44 NA 8 9 10 NAME OF PREPARER 80 80 80 80 80 PHONE: 80 NRC USE ONLY 2 80 o 0 DISCOVERY DESCRIPTION 02 CLEARANCE PERMIT LOCATION OF RELEASE 0 II 1 (A)Descri tion of the Event: SUP LEMENT TO LER 78-037/01T-0 In Mode 1 the Emergency Diesel Generators are normally lined up for automatic start and loading if required.At 1109 hours0.0128 days <br />0.308 hours <br />0.00183 weeks <br />4.219745e-4 months <br /> on June 15, 1978 the DD Emergency Diesel Generator (EDG)was started manually and paralleled with the system because it had been reported there was a fuel oil leak on an injector.The CD Emergency Diesel Generator was stopped at 1153 hours0.0133 days <br />0.32 hours <br />0.00191 weeks <br />4.387165e-4 months <br /> after locating the fuel leak.The"AB" Emergency Diesel Generator was started manually at 1213 hours0.014 days <br />0.337 hours <br />0.00201 weeks <br />4.615465e-4 months <br /> to verify its operability as required by Technical Specification 3.8.1.1 Action a.The"AB" Emergency Diesel Generator was stopped at 1322 hours0.0153 days <br />0.367 hours <br />0.00219 weeks <br />5.03021e-4 months <br /> after being proven operable.Clearance Permit 9350 was prepared by the Shift Operating Engineer (SOE)at 1345'n June 15, 1978 to place the CD-EDG out of service to repair the leaking injector.The SOE gave the Clearance Permit to the Unit Supervisor (US)for performance.

The US instructed the Auxiliary Equipment Operator (AEO)to hang the Clearance Tags.The CD-EDG output breaker control switches located in the Unit 2 Control Room were placed in the"Pull to~Lockout" position by the US.arid the AEO placed the tags on the control switches.Placing the circuit breaker control switches'n the"Pull to Lockout" position prevents any automatic signal from starting the engine.The AEO then proceeded to the EDG rooms to close and place tags on the Starting Air Pilot Valves for the engine.The Starting Air Pilot Valves were being closed to prevent being able to start the engine manually.The AEO entered the wrong EDG room and closed and tagged the Starting Air Pilot Valves for the AB-EDG.The four tags for Clearance Permit 9350 were recorded as being in place at 1351 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.140555e-4 months <br /> on June 15, 1978.The Maintenance

2.Man who was to repair the leaking fuel injector recorded he checked and accepted the Clearance Permit at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> on June 15, 1978.The Maintenance Man made the repairs and released his Clearance Permit at 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> on June 15, 1978.By this time, the Operating Shift had changed and a new shift was in charge of the plant.The SOE directed the US to have the Clearance Permit Tags picked up and the circuit breaker control switches and Starting Air Pilot Valves returned to their normal position.The US directed the AEO to remove the tags from the CD-EDG Starting Air Pilot Valves and to open the valves.The AEO entered the CD-EDG room and found the Starting Air Pilot Valves open and no tag on them.Ke immediately reported this to the US.The US directed the AEO to check the AB-EDG to see if the tags were incorrectly placed.The AEO found that the AB-EDG Starting Air Pilot Valves had been closed and tagged.The AB-EDG valves were recorded as open at.1645 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.259225e-4 months <br />.Placing the CD-EDG control switches in the"Pull to Lockout" position prevented the CD-EDG from automatically starting and loading on a demand signal.Shutting the Starting Air Pilot Valves on the AB-EDG prevented air from starting the AB-EDG on any signal, manual or automatic.

Therefore both the AB-EDG and CD-EDG were inoperable in violation of Technical Specification 3.8.1.1 for a period of three hours.(B)Cause of the Event The primary cause of this event was operator error by the AEO.The AEO mistakenly entered the wrong EDG room and closed and tagged the wrong Starting Air Pilot Valves.

F I 1 I~~~

t t Secondary causes of this event were, (1)the signs to identify the EDG rooms had not been made and installed.

Most of the rooms in the two Units are mirror image from the center line of the plant.This is not true of the EDG rooms.In both Units the AB-EDG room is to the right of the center line and CD-EDG is to the left of the center line.Also the first door off the hallway a person comes to on Unit 1 is the AB-EDG room and on Unit 2 the fi rst door off of the hallway is the CD-EDG room.The Maintenance Man involved in making the repairs verified the tags correctly placed in the Control Room but did not verify the tags correctly placed on the Starting Air Pilot Valves.This would not have prevented the event but would have reduced the amount of time that both EDG were inoperable.

3.(C)Corrective Action Taken At Time Event Was Discovered The US directed the AEO to check the AB-EDG to see if the wrong Starting Air Pilot Valve had been shut.The AB-EDG Starting Air Pilot Valves were immediately opened and the tags were removed.The CD-EDG was started at 1655 hours0.0192 days <br />0.46 hours <br />0.00274 weeks <br />6.297275e-4 months <br /> and paralleled with the system.There were no more fuel oil leaks and the CD-EDG was declared operable at 1807 hours0.0209 days <br />0.502 hours <br />0.00299 weeks <br />6.875635e-4 months <br />.Opening the Starting Air Pi lot Valves had restored the AB-EDG to an operable condition.(D)Safet Evaluation of the Event The Emergency Diesel Generators provide a backup to the two Techni'cal Specification required independent off-site transmission networks.Throughout this event both of these off-si te transmission networks were operable and the ci rcuit breaker lineup as required by Technical Specification 4.8.1.l.la

~~

h 4~~e t had been performed within the required time frame when the CD-EDG was removed from servi ce.One of the independent off-site sources is available on automatic and instantaneous transfer when normal auxiliary power is lost.The second source is a 69KV transmission line which experience has shown can be manually connected to our plant busses in less than two minutes.Further than this, we recently added another source of auxiliary power supply over that required by our operating license.This power supply was also available during the time of this incident.In the event the off-site transmission sources had been lost the US would have immediately known the AB-EDG did not start.The AB-EDG could have been checked out and the Starting Air Pilot Valves opened and the engine started, in an estimated 5 minutes.This is the first instance at the Cook Nuclear Plant where both diesel generators have been inadvertently made inoperable.

Action item d in technical specification 3.8.1.1 requires that with two diesel generators inoperable at least one of the inoperable diesel generators must be restored to operable status within two hours or be in at least hot standby within the next six hours and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.During this incident both diesel generators were inoperable for three hours which is within the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time period specified by the technical specifications necessary to protect the health and safety of the public.

~~(

~.~(E)Corrective Action Taken to Prevent Recurrence (1)The Operations Superintendent directed that signs be placed directly on the doors to all four EDG rooms to identify the equipment in the room by Unit and equipment.

This was accomplished prior to 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on Dune 15, 1978.(2)The entrances to all rooms containing safety-related equipment shall be marked by placing a sign designating the unit and equipment in the room.This will be completed by October 1, 1978.(3)In the future, when an emergency diesel generator is to be removed from service, the other emergency diesel generator will be proven operable and will then be left running until the emergency diesel generator being removed from service.has been isolated, tags;placed as required and the clearance permit accepted by the individual who will be performing the designated work.(4)PMI 2110 Equipment Control-Clearance Permit System, as written, was violated in this instance.This instruction and the clearance permit form'.reaui.re the" person who accepts the clearance permit to check the proper tagging prior to accepting the clearance.

Management has taken additional steps to enforce compliance.

For all Technical Specification identified

'equipment, we will require independent verification of correct tagging and isolating i f=the plant is in a mode where the'f if equipment is required., This independent verification will be I performed by Operations Department personnel prior to presenting the clearance permit to the individual doing the work for verification prior to his acceptance.

For non-Technical Specifi-cation identified equipment, the independent verification will be performed by the person who will accept the clearance permit or his supervisor.

'0 II I 6.(5)The AEO who closed and tagged the wrong Starting Air Pilot valves was reprimanded in writing for his error.(6)The Operations Superintendent met with the SOE and Operating Engineers for all four shifts to discuss this event and the severity of other recent events which have occurred at the plant.He also pointed out that more severe disciplinary actions would be taken in the future for careless operator errors.

r~~~F