September 14, 2020

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000313/2020410 AND 05000368/2020410

Dear Mr. Dinelli:

On August 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Digitally signed by Ray L. Kellar Kellar Date: 2020.09.14 13:23:30 -05'00'

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000313 and 05000368 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2020410 and 05000368/2020410 Enterprise Identifier: I-2020-410-0000 Licensee: Entergy Operations, Inc.

Facility: Arkansas Nuclear One, Units 1 and 2 Location: Russellville, AR Inspection Dates: August 3, 2020 to August 6, 2020 Inspectors: M. Chambers, Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Arkansas Nuclear One,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the minimum

inspection elements due to the COVID-19 pandemic: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: Requirements [02.06 a, b, and d]
  • Tier III: Requirement [02.10 a]

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Review Security Plan Changes (IP Section 02.01)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) (October 2019-August 2020)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 6, 2020, the inspectors presented the security baseline inspection results to Mr. John Dinelli, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.02 Corrective Action CR-ANO-C-2020- On-Duty Security Officers Failure to Maintain Required 4/13/2020

Documents 01158 Equipment

Corrective Action CR-ANO-C-2020- Observation on train/cask search process 08/05/2020

Documents 02171

Resulting from CR-ANO-C-2020- Security PI Data recording/verification process observation 08/05/2020

Inspection 02172

Procedures 1043.002 Access Control 93

EN-NS-224 SOCA Access Controls 3

EN-NS-231 Protected Area Search 2

EN-NS-232 General Employee Security Responsibilities 2

OP-1000.019 Station Security Requirements 51

OP-1043.003 Guard Screening, Responsibilities, and Duties

71130.09 Miscellaneous Security Plan 2018

71151 Miscellaneous 4th Quarter 2019 Security Compensatory Measures Oct, Nov,

Dec 2019

1st Quarter Security Compensatory Measures 2020 Jan, Feb,

Mar 2020

5