November 9, 2020

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000313/2020003 AND 05000368/2020003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION AGING MANAGEMENT INSPECTION REPORT 07200013/2020001

Dear Mr. Dinelli:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One, Units 1 and 2. On October 15, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Arkansas Nuclear One.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Digitally signed by John L. Dixon Dixon Date: 2020.11.09 14:51:06 -06'00'

John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313, 05000368, and 07200013 License Nos. DPR-51 and NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000313, 05000368, and 07200013 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2020003, 05000368/2020003, and 07200013/2020001 Enterprise Identifier: I-2020-003-0003 and I-2020-001-0094 Licensee: Entergy Operations, Inc.

Facility: Arkansas Nuclear One Location: Russellville, AR Inspection Dates: July 1, 2020 to September 30, 2020 Inspectors: R. Alexander, Senior Emergency Preparedness Inspector L. Brookhart, Senior Spent Fuel Storage Inspector M. Davis, Transportation and Storage Safety Inspector T. DeBey, Resident Inspector M. Doyle, Operations Engineer C. Henderson, Senior Resident Inspector J. Kirkland, Senior Operations Engineer J. Melfi, Senior Resident Inspector T. Sullivan, Resident Inspector Approved By: John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone Significance Cross-Cutting Report Aspect Section Mitigating Green None 71111.15 Systems NCV 05000368/2020003-01 Open/Closed The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at full power where it remained for the rest of the reporting period except for minor reductions in power to support scheduled surveillances.

Unit 2 began the inspection period at full power and remained at full power until September 9, 2020, when the unit reduced power to 94 percent to investigate a suspected leak in high pressure feedwater heater 2E1B. After determination there was no leak, Unit 2 returned to full power on September 10, 2020, where it remained for the rest of the reporting period except for minor reductions in power to support scheduled surveillances.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk-significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal summer heat and storms for the following systems:
  • Cooling water intake structure

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 emergency feedwater while performing surveillance on emergency feedwater initiation and control on September 9, 2020
(2) Unit 2 service water system on October 1, 2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 lube oil reservoir room, Fire Area B-1, Fire Zone 175-CC, on July 1, 2020
(2) Unit 2 lower north electrical penetration room, Fire Area B-3, Fire Zone 2112-BB, on July 1, 2020
(3) Unit 2 motor-driven emergency feedwater pump room, Fire Area FF, Fire Zone 2025-JJ, on July 6, 2020
(4) Unit 1 upper north piping penetration room, Fire Area B-1, Fire Zone 79-U, on July 6, 2020
(5) Unit 2 motor control center and access corridor, Fire Area JJ, Fire Zone 2109-U, on September 22, 2020

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 2 emergency diesel generator 1 jacket water heat exchanger on September 10, 2020

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (2 Samples)

(1) The inspectors reviewed and evaluated the Unit 1 licensed operator examination failure rates for the requalification annual operating examination administered June 2020 through July 2020.
(2) The inspectors reviewed and evaluated the Unit 2 licensed operator examination failure rates for the requalification annual operating examination administered June 2020 through July 2020.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on June 12 and June 19, 2020.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Unit 2 control room during an unplanned down power to investigate a possible feedwater heater tube leak on September 9, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operator requalification training for a steam generator tube rupture on September 24, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2 in core instrument flange number 2, 4, and 6 leakage during Refueling Outage 2R27 on August 19, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 emergency diesel generator 1 maintenance outage window on September 16, 2020
(2) Unit 1 intermediate cooling water heat exchanger E-28A/B tube plugging margin on September 18, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 safety-related 4160 volt switchgear overcurrent relay Part 21 operability on September 8, 2020
(2) 2VEF-24C emergency diesel generator exhaust fan thermal overload failure on September 9, 2020
(3) Unit 1 containment cooler VCC-2A/D operability on September 9, 2020
(4) Unit 2 service water pump A failure to start due to anti-pump breaker failure operability on September 10, 2020
(5) Unit 2 emergency diesel generator B wall thinning of silencer operability on September 23, 2020
(6) Unit 2 emergency diesel generator A and B day tank level controller operability on September 29, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Containment sump isolation valve 2CV-5650-2 to emergency core cooling system B suction on August 26, 2020
(2) Unit 2 charging pump A on September 11, 2020
(3) Unit 2 emergency diesel generator A train on September 15, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 2 service water systems A and B as-left flow test on September 23, 2020

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2019, and August 30, 2020.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the licensee's Emergency Response Organization between September 1, 2019, and August 30, 2020.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following Emergency Plan Implementing Procedure changes and the licensee's Emergency Plan change review process per 10 CFR 50.54(q):
  • EN-EP-310, Emergency Response Organization Notification System, Revision 9
  • EN-EP-801, Emergency Response Organization, Revision 17
  • OP-1904.002, Offsite Dose Projections, Revisions 48 and 49 This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2019, and August 30, 2020.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Unit 2 dynamic simulator examination performance indicator opportunity on July 22,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12) ===

(1) (July 1, 2019 - June 30, 2020)

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) (July 1, 2019 - June 30, 2020)

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) (July 1, 2019 - June 30, 2020)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (July 1, 2019 - June 30, 2020)
(2) Unit 2 (July 1, 2019 - June 30, 2020)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2019 - June 30, 2020)
(2) Unit 2 (July 1, 2019 - June 30, 2020)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2019 - June 30, 2020)
(2) Unit 2 (July 1, 2019 - June 30, 2020)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (3 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 2 shutdown cooling control valve 2CV-1456-2 failure to operate on August 14, 2020
(2) Unit 2 emergency feedwater isolation valve 2CV-1039-1 failure to close on September 8, 2020
(3) Unit 2 emergency diesel generator day tank level enclosure temperature on September 29, 2020

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)

(1) The inspectors evaluated the stuck control element assemblies in Unit 2 and the licensees response on August 6, 2020.
(2) The inspectors evaluated a 5 percent down power for a suspected feedwater heater leak in Unit 2 and the licensees response on September 9,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 2690/011 - Review of Aging Management Programs at Independent Spent Fuel Storage Installations The inspectors evaluated whether the licensee had adequate procedures in place to implement an Aging Management Program (AMP) for their independent spent fuel storage installation (ISFSI) from September 17-20, 2019, and conducted an in-office review of additional information including the inspection results from July 14-16, 2020, and September 28-30, 2020.

Review of Aging Management Programs at Independent Spent Fuel Storage Installations (1 Sample)

(1) The overall program and implementing procedures that the licensee had in place to implement the AMP were inspected in accordance with paragraphs 03.01-03.10 of the temporary instruction and the inspectors found the licensees program and procedures consistent with the AMP provided in the renewed Certificate of Compliance (CoC) for the Westinghouse Electric Companys ventilated storage casks (VSCs) system (Docket No. 72-1007), formerly EnergySolutions. However, the licensee did not perform all the required AMP inspections within the period specified in the renewed CoC license Condition 5.iii and VSC's Final Safety Analysis Report (FSAR) as updated. The licensee had up to 2 years to complete the inspections after the effective date of the CoC renewal, which was September 20, 2017, or within 1 year of the 20th anniversary of the first cask loaded at the site, whichever was later. The licensee loaded the first VSC-24 cask on December 12, 1996. Therefore, the last day to implement the AMP inspections was September 20, 2019.

Following the missed AMP inspections, the licensee submitted an exemption from the regulations delineated in 10 CFR 72.212(b)(3), 10 CFR 72.212(b)(5)(i), and 10 CFR 212(b)(11) to provide additional time to perform the required AMP inspections including the lead cask inspection. The licensee proposed to conduct the missed AMP inspections within the next 6 months and concluded that nothing significant would be expected since aging is a long-term degradation issue. The NRC technical staff reviewed and assessed the information presented within the exemption request and found the information acceptable to conduct the AMP inspection within the next 6 months. The technical reviewers and inspectors determined that the risk would be extremely low because of the continuous monitoring of the storage casks and the results of previous aging management inspections conducted at two other sites, which identified no major issues on the VSC-24 storage system. Based on the NRCs technical review of the exemption request, the inspectors decided to treat this issue like a missed technical specification surveillance, which generally allows up to 25 percent additional time to perform and complete a missed surveillance. This issue was determined to constitute a violation of minor significance that is not subject to enforcement action in accordance with Section 2.2.2.e. of the Enforcement Policy.

The licensee completed the remaining AMP inspections during the final week in March 2020 and presented the results of the inspection to the inspection staff in April 2020. The results of the AMP inspections did not show any major degradation of the selected VSC-24 storage systems located on the site.

INSPECTION RESULTS

Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone Significance Cross-Cutting Report Aspect Section Mitigating Green None 71111.15 Systems NCV 05000368/2020003-01 Open/Closed The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.

Description:

On January 15, 2020, the inspectors noted that there appeared to be no cooling air flow through the electrical enclosures containing the day tank level control and indication systems for both Unit 2 emergency diesel generators. These enclosures contain the power supplies and electronic equipment needed to detect the diesel fuel oil level in the day tanks, to actuate the fuel transfer components to add fuel to the day tanks, and to provide alarms to the control room if an abnormal condition was detected. Based on the inspectors questioning, the licensee wrote Condition Report (CR) CR-ANO-2-2020-00100 to document that an air filter on the emergency diesel generator A equipment box was dirty.

Subsequently, the licensee wrote Condition Report CR-ANO-2-2020-00117 to document that the cooling fan on the emergency diesel generator B enclosure was not running.

Maintenance performed every 2 years (Work Order (WO) 52743222 and WO 52751639 in 2018) required that the enclosure ventilation filter be cleaned; however, it implied that one filter exists on each enclosure when there are actually two. The site engineering department evaluated the heat load and electrical power load for the control enclosures and identified that the original (1997) engineering evaluation had errors. The actual electrical and thermal loads were significantly higher than the original analysis. Measurements and analyses performed in July 2020 had significant uncertainty and did not support the original engineering evaluation that no cooling air flow was needed. The inspectors questioned the data and the site responded with additional measurements and analyses (with minimal uncertainty) in September 2020 that demonstrated a maximum estimated enclosure temperature that would be below the 140 °F design limit of the limiting internal components. The estimated enclosure electrical heat load started with the original analysis of ~5.5 Watts (W), increased to the July estimate of ~72 W and ended with the September value of ~43 W. The final information does support that forced cooling is not needed to maintain the electronic components within their design specifications.

Corrective Actions: The licensee replaced all enclosure filters in both emergency diesel generators fuel oil transfer electronic enclosures and replaced the cooling fan in the train B emergency diesel generator enclosure to resolve the immediate air flow issues. The bottom (inlet) filters on the enclosures were cleaned in January 2020 and then documented in July 2020 as being dirty again. A corrective action was proposed to increase the preventive maintenance frequency to semiannual for these filters. A procedure improvement form was also submitted to improve the preventive maintenance and to clearly indicate that two filters are present on each enclosure.

Corrective Action References: Condition Reports CR-ANO-2-2020-00100, CR-ANO-2-2020-00101, CR-ANO-2-2020-00117, CR-ANO-2-2020-00560, CR-ANO-2-2020-02904, CR-ANO-2-2020-02921, CR-ANO-2-2020-02924, CR-ANO-2-2020-02971, and CR-ANO-2-2020-03036

Performance Assessment:

Performance Deficiency: The licensee failed to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the errors were such that there was a reasonable doubt as to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures. The licensee performed new types of evaluations to reach the final conclusion that the enclosure components would remain within their design criteria.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the finding had very low safety significance (Green) because the finding did not involve the design or qualification of a mitigating structure, system, or component, did not represent a loss of system or function, did not represent an actually loss of function of at least a single train or two separate safety systems, and did not represent an actual loss of function of one or more nontechnical specification trains of equipment designated as high safety significance in accordance with the licensees maintenance rule program.

Cross-Cutting Aspect: None. No cross-cutting aspect was assigned because this deficiency occurred in 1997 and is not indicative of current licensee performance.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, requires, in part, that design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Contrary to the above, the licensee did not appropriately verify the adequacy of the design change made in 1997 for safety-related fuel oil transfer components located in the emergency diesel generator day tank level control enclosures by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program.

Specifically, the licensee failed to provide adequate design evaluations for the electrical and thermal loads within the day tank level control enclosures. Documentation that supported qualification of the day tank level control and indication components was not adequately developed to assure that the components would be capable of performing their functions correctly during a design basis event.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 17, 2020, the inspectors presented the annual and biennial requalification inspection results to Mr. J. Sullivan, General Manager, Plant Operations, and other members of the licensee staff.
  • On September 18, 2020, the inspectors presented the emergency preparedness program inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
  • On October 1, 2020, the inspectors presented the ISFSI aging management inspection results to Mr. R. Clark, Licensing Specialist, and other members of the licensee staff.
  • On October 15, 2020, the inspectors presented the integrated inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

2690/011 Corrective Action CR-ANO- C-2019-03560, C-2019-03563(1), C-2019-04471, C-2020-

Documents 01137, C-2020-01138, C-2020-01139

Procedures EN-FAP-OU-111 Examination of VSC Top End Steel Components AMP 0

EN-FAP-OU-112 Examination of MTC Assembly AMP 0

EN-FAP-OU-113 Dry Fuel Tollgate Assessment 0

EN-FAP-OU-114 VSC-24 Lead Cask Inspection 0

EN-FAP-OU-115 Examination of VCC Assembly Ventilation Ducts & Annulus 0

AMP

EN-FAP-OU-116 Examination of VCC Assembly Exterior AMP 0

EN-LI-102 Corrective Action Program 38

EN-LI-113 Licensing Basis Document Change Process 18

EN-OE-100 Operating Experience Program 32

OP-3401.001 Conduct of Dry Fuel Storage (DFS) 3

OP-3401.002 VSC-24 Aging Management Annual Examination of VCC 0

Exterior

OP-3401.003 VSC-24 Aging Management 5 Year Examination of VSC 0

Assembly Ventilation Ducts and Annulus

OP-3401.004 VSC-24 Aging Management 10 Year Examination of VSC 0

Top End Steel Components

OP-3401.005 VSC-24 Aging Management 20 Year Examination of VSC 0

Lead Cask

OP-3401.006 VSC-24 Aging Management 10 Year Examination of MTC 1

Assembly

Work Orders WO 50239086 5YR Inspection of VCC Interior Surface and Exterior of MSB 0

WO 52883726 20YR Examination VCC Lead Cask 1

WO 52883728 10YR Examination VCC Top End Steel 1

71111.01 Corrective Action CR-ANO- C-2019-03814, C-2020-02001, C-2020-02080, C-2020-

Documents 02131

71111.01 Procedures OP-3305.004 ANO Transformer Yard Controls 0

71111.04 Corrective Action CR-ANO- 1-2020-00290, 1-2020-00952, 1-2020-01168, 1-2020-01211,

Documents 1-2020-01215, 2-2020-01466, 2-2020-01931, 2-2020-02388,

2-2020-02389, 2-2020-02446, 2-2020-02458, 2-2020-02646,

Inspection Type Designation Description or Title Revision or

Procedure Date

2-2020-02733, 2-2020-02852

71111.04 Drawings M-2210 P&ID Service Water System

71111.04 Miscellaneous STM-2-42 Service Water and Auxiliary Cooling Water Systems

71111.04 Procedures OP-1106.006 Emergency Feedwater Pump Operation 114

71111.04 Procedures OP-2104.029 Service Water System Operations 117

71111.04 Procedures OP-3305.001 Ops System Alignment Tests 1

71111.04 Work Orders WO 52863446

71111.05 Calculations CALC-83-E-0063- Flooding Depth due to Fire Protection Discharges and 4

Known Elevations of Safety Related Electrical Equipment

71111.05 Calculations CALC-90-R-1014- Penetration 0175-1A-0088 0

71111.05 Corrective Action CR-ANO 1-2018-00221, 1-2018-00911

Documents

71111.05 Drawings FP-2103, Sheet 1 Fire Zoned Intermediate Floor Plan El. 368'-0" and 372'-0" 38

71111.05 Fire Plans PFP-U1 ANO Prefire Plan (Unit 1) 21

71111.05 Fire Plans PFP-U2 ANO Prefire Plan (Unit 2) 17

71111.05 Miscellaneous Arkansas Nuclear One - Unit 1 and Unit 2 Fire Hazard 19

Analysis

71111.05 Miscellaneous Fire Impairment 6904, 7437

71111.05 Procedures OP-1203.049 Fires In Areas Affecting Safe Shutdown 15

71111.05 Procedures OP-1203.055 Actions for Turbine Generator Fires 0

71111.05 Procedures OP-2203.034 Fire or Explosion 26

71111.05 Procedures OP-2203.049 Fires in Areas Affecting Safe Shutdown 20

71111.07A Calculations CALC 91-D-2003-

71111.07A Corrective Action CR-ANO- 2-2018-00735, 2-2020-00960, 2-2020-02617, 2-2020-02804,

Documents 2-2020-03093

71111.07A Procedures OP-2104.029 Service Water System Operations 117

71111.07A Procedures OP-2305.062 Service Water System Flow Testing 4

71111.07A Work Orders WO 354436, 499061, 517346, 52865292, 52877528, 52891262

71111.11B Corrective Action CR-ANO- 2-2019-01432, 2-2020-00206, 2-2020-02164, 2-2020-02611,

Documents C-2018-02463, C-2018-02830, C-2018-03594, C-2019-

00110, C-2019-00443, C-2019-00776, C-2019-00828, C-

Inspection Type Designation Description or Title Revision or

Procedure Date

2019-01696, C-2019-01697, C-2019-01698, C-2019-01736,

C-2019-02123, C-2019-02285, C-2019-02290, C-2019-

2300, C-2019-02435, C-2019-02605, C-2019-02759, C-

2019-02760, C-2019-02761, C-2019-04220, C-2019-04684,

C-2019-04702, C-2019-04875, C-2020-00867, C-2020-

01323

71111.11B Miscellaneous Cycle 2005 - LOR Biennial Written Exam Details - Exam - 2 - 06/19/2020

RO 71111.11B Miscellaneous Cycle 2005 - LOR Biennial Written Exam Details - Exam - 1 - 06/12/2020

SRO 71111.11B Miscellaneous JPM-A2JPM-RO- 2D-36 Battery Eliminator Startup 0

2D36

71111.11B Miscellaneous JPM-A2JPM-RO- Shift Running CCW pumps 10

CCW02

71111.11B Miscellaneous JPM-A2JPM-RO- Perform Emergency Boration (Alternate Success Path) 5

CVCS2

71111.11B Miscellaneous JPM-A2JPM-RO- Perform service water emergency makeup to the SFP (with 0

FPEM1 Loop 1 service water)

71111.11B Miscellaneous JPM-A2JPM-RO- SIT Isolation 0

SIT10

71111.11B Miscellaneous JPM-A2JPM- Classify an Emergency Event 0

SRO-EAL30

71111.11B Miscellaneous SES-2-009 Dynamic Exam Scenario, Week of 7/6/20 8

71111.11B Miscellaneous SES-2-034 Dynamic Exam Scenario, Week of 7/6/20 6

71111.11B Procedures DG-TRNA-015- Simulator Exam Security Guidelines 18

EXAMSEC 71111.11B Procedures EN-TQ-114 Licensed Operator Requalification Training Program 13

Description

71111.11B Procedures EN-TQ-210 Conduct of Simulator Training 15

71111.11B Procedures EN-TQ-217 Examination Security 9

71111.11B Procedures TQF-114- Annual Operating Exam JPM Quality Checklist 5

AOESIM

71111.11B Procedures TQF-114- Annual Operating Exam Simulator Scenario Set Quality 8

AOESIM Checklist

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.12 Calculations CALC-18-E-0007-

71111.12 Corrective Action CR-ANO- 2-2017-03388, 2-2018-00852, 2-2018-00883, 2-2019-03313,

Documents 2-2020-00513, 2-2020-00968, 2-2020-01078, 2-2020-01234,

2-2020-01395, 2-2020-01424, 2-2020-01447, 2-2020-01486,

2-2020-01611, 2-2020-01615, 2-2020-01642, 2-2020-01658,

2-2020-01665, 2-2020-01709, 2-2020-01731, 2-2020-01802,

2-2020-01928, 2-2020-01987, 2-2020-01996, 2-2020-

01928, 2-2020-02035, 2-2020-02048, 2-2020-02455, 2-

20-02807, 2-2020-02850, 2-2020-03044, 2-2020-03057,

C-2018-03338

71111.12 Drawings M-2210, Sheet 1- P&ID

4, 6

71111.12 Drawings M-2242-AA-26

71111.12 Miscellaneous GL-89-10 Safety Related MOV Testing and Surveillance

71111.12 Miscellaneous PEAR-95-0290

71111.12 Procedures OP-2507.004 ICI Flange Disassembly 17

71111.12 Procedures OP-2507.005 ICI Flange Reassembly and Cable Connections 24

71111.12 Work Orders WO 501163, 507265, 519374, 547841

71111.13 Corrective Action CR-ANO- 1-2017-04444, 1-2017-05061, 1-2020-00295, 1-2020-00481,

Documents 1-2020-00932, 1-2020-01002, 2-2020-03044, 2-2020-03057

71111.13 Engineering EC-63596

Changes

71111.13 Engineering EC-70622

Changes

71111.13 Engineering EC-72994

Changes

71111.13 Procedures EN-WM-104 On-Line Risk Assessment 22

71111.13 Procedures OP-2104.036 Emergency Diesel Generator Operations 98

71111.13 Work Orders WO 304158, 436716

71111.15 Calculations 974603P201-03 EDG Fuel Oil Day Tank Level Switches 1

71111.15 Calculations CALC-20-E-0010-

71111.15 Calculations CALC-90-D-6028-

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.15 Calculations CALC-90-E-0013-

71111.15 Calculations CALC-91-R-2013- SW Performance Testing Method 28

71111.15 Corrective Action CR-ANO- 1-2005-00816, 1-2005-02753, 1-2006-00167, 1-2020-00363,

Documents 1-2020-00585,1-2020-01025, 2-2014-02605, 2-2014-02827,

2-2018-01147, 2-2018-01686, 2-2020-00100, 2-2020-02446,

2-2020-02458, 2-2020-02584, 2-2020-02606, 2-2020-02733,

2-2020-03095, C-2020-01563, C-2020-01706

71111.15 Corrective Action CR-ANO- 2-2020-00560

Documents

Resulting from

Inspection

71111.15 Engineering EC-77690

Changes

71111.15 Engineering EC-77691

Changes

71111.15 Engineering EC-87790

Changes

71111.15 Miscellaneous 2-BOP-UT-16-

2

71111.15 Miscellaneous 2-BOP-UT-18-

006

71111.15 Miscellaneous 2-BOP-UT-18-

008

71111.15 Miscellaneous 2-BOP-UT-20-

046

71111.15 Miscellaneous 2-BOP-UT-20-

049

71111.15 Miscellaneous ER-2000-2646-

003

71111.15 Miscellaneous ER974603P201 Replace EDG Day Tank Level Control Switches 09/1998

71111.15 Procedures OP-1104.033 Supplement 5

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.15 Procedures OP-2104.029 Service Water Operations Change 117

71111.15 Procedures OP-2104.036 Emergency Diesel Generator Operations 98

71111.15 Procedures OP-2204.012H Annunciator 2K08 Corrective Action 39

71111.15 Work Orders WO 393099, 394916, 503684, 545948, 50274573, 52746504,

2858463, 52868957

71111.19 Corrective Action CR-ANO- 2-2020-03061, 2-2020-03062, 2-2020-03170

Documents

71111.19 Work Orders WO 502990, 542752, 545039, 549683, 52618649, 52858463,

2858572, 52859347, 52861717, 52868160, 52873681,

2877528

71111.22 Calculations CALC-90-E-0116-

71111.22 Corrective Action CR-ANO- 2-2018-03994, 2-2020-00960, 2-2020-01794, 2-2020-01795,

Documents 2-2020-01796, 2-2020-01797, C-2020-01460

71111.22 Corrective Action CR-RBS- 2020-01723 (CA-14)

Documents

71111.22 Engineering EC-61132

Changes

71111.22 Engineering EC-79644

Changes

71111.22 Engineering EC-86561

Changes

71111.22 Procedures OP-2104.033

71111.22 Procedures OP-2305.062

71111.22 Work Orders WO 517346

71114.02 Corrective Action CR-ANO- C-2019-03166, C-2019-03621, C-2020-01425

Documents

71114.02 Miscellaneous Design Report Update: Upgraded Public Alert and May 2009,

Notification System (ANS) - Arkansas Nuclear One as Revised

May 2016

71114.02 Miscellaneous Design Report Update: Upgraded Public Alert and Supplement

Notification System (ANS) - Arkansas Nuclear One 1 (February

2017)

71114.02 Miscellaneous FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power 06/28/2016

Inspection Type Designation Description or Title Revision or

Procedure Date

Plant Alert and Notification System (ANS) Design Report

Update

71114.02 Miscellaneous FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power 02/28/2017

Plant Alert and Notification System (ANS) Design Report

Update Supplement (1) dated February 2017

71114.02 Procedures Arkansas Dept. of Health - Guidelines for Siren Warning 10/2012

System

71114.02 Procedures Form 1903.004-K Alert and Notification System Oversight Activity 12/18/2019

71114.02 Procedures Form 1903.004-L Offsite Training Program Oversight 09/16/2019,

09/23/2019

71114.03 Corrective Action CR-ANO- C-2019-03276, C-2019-04446, C-2019-04623, C-2019-

Documents 04759, C-2020-00132, C-2020-00136, C-2020-00380

71114.03 Miscellaneous Entergy - Arkansas Nuclear One On-Shift Staffing Analysis 2

Final Report

71114.03 Procedures EN-EP-310 Emergency Response Organization Notification System 9

71114.03 Procedures Form 1903.062C 2019 3rd Quarter Staffing Drill Report - Yellow Team 09/25/2019

September 22, 2019 (Sunday) @ 0800

71114.03 Procedures Form 1903.062C 2019 4th Quarter Staffing Drill Report - Green Team 12/03/2019

November 26, 2019 (Tuesday) @ 0445

71114.03 Procedures Form 1903.062C 2020 1st Quarter Staffing Drill Report - Green Team January 01/15/2020

15, 2020 (Wednesday) @ 0530

71114.03 Procedures Form 1903.062C 2020 1st Quarter Staffing Drill Report - Red Team January 01/30/2020

27, 2019 (Monday) @ 1830

71114.03 Procedures Form 1903.062C 2020 2nd Quarter Staffing Drill Report - Yellow Team May 06/09/2020

30, 2020 (Saturday) @ 0800

71114.03 Procedures OP-1203.048 Security Event 39

71114.03 Procedures OP-1903.011 Emergency Response/Notifications 58

71114.04 Miscellaneous 10 CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose 01/08/2020

Projections, Rev. 48

71114.04 Miscellaneous 10 CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose 04/08/2020

Projections, Rev. 49

71114.04 Miscellaneous 10 CFR 50.54(q)(2) Review: EN-EP-310, Emergency 03/11/2020

Response Organization Notification System, Rev. 9

71114.04 Miscellaneous 10 CFR 50.54(q)(2) Review: EN-EP-801, Emergency 11/04/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

Response Organization, Revision 17

71114.04 Procedures EN-EP-305 Emergency Planning 10CFR50.54(q) Review Program 8

71114.05 Corrective Action CR-ANO- 1-2018-04530, 1-2019-02362, 1-2019-03789, 1-2019-03821,

Documents 1-2019-04609, 1-2020-01010, 2-2020-00305, 2-2020-00344,

2-2020-00663, 2-2020-02801, C-2019-01494, C-2019-

03094, C-2019-03102, C-2019-03203, C-2019-03223, C-

2019-03229, C-2019-03766, C-2019-04061, C-2019-04476,

C-2019-04788, C-2020-00319, C-2020-00382, C-2020-

00385, C-2020-00506, C-2020-00864, C-2020-00979, C-

20-00988, C-2020-01166, C-2020-01211, C-2020-01389,

C-2020-01390, C-2020-01435

71114.05 Corrective Action CR-ANO- C-2020-02577

Documents

Resulting from

Inspection

71114.05 Engineering KLD TR - 1097 Arkansas Nuclear One - 2019 Population Update Analysis 09/21/2019

Evaluations

71114.05 Engineering KLD TR - 1167 Arkansas Nuclear One - 2020 Population Update Analysis 09/08/2020

Evaluations

71114.05 Miscellaneous Arkansas Nuclear One (ANO) Medical Emergency Report - 07/21/2020

October 5, 2019 (corrected)

71114.05 Miscellaneous Letter of Agreement Between Entergy Operations, Inc. and 05/01/2019

Saint Mary's Regional Medical Center

71114.05 Miscellaneous 10 CFR 50.54(q)(2) Review: CR-ANO-C-2020-979 and OP- 07/07/2020

1903.060

71114.05 Miscellaneous Arkansas Nuclear One Yellow Team Site Drill Report - 09/19/2020

August 21, 2019

71114.05 Miscellaneous Arkansas Nuclear One ERO Team Yellow Site Drill Report - 03/05/2020

February 5, 2020

71114.05 Miscellaneous Arkansas Nuclear One HP/Post Accident Drill Report - 09/08/2020

August 4, 2020

71114.05 Miscellaneous Scenario EOF-PI-2019-04, Blue Team Drill Report 09/26/2019

71114.05 Miscellaneous Scenario EOF-PI-2019-04, Red Team Drill Report 09/12/2019

71114.05 Miscellaneous Scenario EOF-PI-2020-01, Green Team Drill Report 02/12/2020

Inspection Type Designation Description or Title Revision or

Procedure Date

71114.05 Miscellaneous Arkansas Nuclear One (ANO) HP/RP ENVIRONMENTAL 09/08/2020

Drill Report - August 6, 2020

71114.05 Miscellaneous Arkansas Nuclear One (ANO) Strength Development - 08/2020

Emergency Planning Virtual Tabletop - August 2020

71114.05 Miscellaneous Scenario EOF-PI-2020-02, Yellow Team Drill - June 25, 06/25/2020

20

71114.05 Miscellaneous Arkansas Nuclear One Emergency Plan 45

71114.05 Miscellaneous ANO-2019-016 Letter of Agreement Between Entergy Operations, Inc. and 12/26/2019

the Board of Trustees of the University of Arkansas by and

on behalf of the University of Arkansas for Medical Sciences

Hospital

71114.05 Miscellaneous EP-2019-015 MS- 2019 Medical Drill with Pope County EMS and University of 10/07/2019

Arkansas Medical Services

71114.05 Miscellaneous QA-07-2019- Quality Assurance Audit Report - Emergency Preparedness 05/20/2019

ANO-1 (50.54(t)(1) & (2))

71114.05 Miscellaneous QA-7-2020-ANO- Quality Assurance Audit Report - Emergency Preparedness 05/11/2020

(50.54(t)(1) & (2))

71114.05 Procedures EN-EP-306 Drills and Exercises 10

71114.05 Procedures EN-EP-308 Emergency Planning Critiques 6

71114.05 Procedures EN-LI-102 Corrective Action Program 41

71114.05 Procedures Form 1903.004-N Annual LOA/Contracts Review 12/17/2019

71114.05 Procedures Form 1903.060A Control Room Kits Inventory 09/02/2020

71114.05 Procedures Form 1903.060B Onsite Radiological Monitoring Kit Inventory 08/18/2020

71114.05 Procedures Form 1903.060C Technical Support Center Kit Inventory 08/18/2020

71114.05 Procedures Form 1903.060E Emergency Operations Facility Kit Inventory 08/18/2020

71114.05 Procedures Form 1903.060F Field Monitoring Kit Inventory Form (Kits A-D) 08/18/2020

71114.05 Procedures Form 1903.060J St. Mary's Hospital Kit Inventory 08/18/2020

71114.05 Procedures Form 1903.060Q Monthly Emergency Kit Surveillance 08/18/2020

71114.05 Procedures Form 1903.060U UAMS Hospital Kit Inventory 08/18/2020

71114.05 Procedures OP-1903.004 Admin. & Maintenance of the Emergency Plan & 36

Implementing Procedures

71114.05 Procedures OP-1903.011Y Emergency Class Initial Notification Message 50

71114.05 Procedures OP-1903.060 Emergency Supplies & Equipment 46

Inspection Type Designation Description or Title Revision or

Procedure Date

71114.05 Procedures OP-1903.069 Equipment Important to Emergency Response 10

71114.05 Self-Assessments LO-ALO-2019- 2020 Pre-NRC Evaluated Exercise Assessment 05/27/2020

0087

71114.05 Work Orders WO 509704, 5276021, 531729, 536314-01, 547435

71114.06 Miscellaneous SES-2-059 Dynamic Exam Scenario 2

71114.06 Miscellaneous SES-2-072 Dynamic Exam Scenario 0

71151 Corrective Action CR-ANO- C-2020-01424

Documents

71151 Corrective Action CR-ANO- C-2020-02559, C-2020-02575

Documents

Resulting from

Inspection

71151 Miscellaneous Siren Testing Verification Checklists from ADH (September

2019 - June 2020)

71151 Miscellaneous Monthly DEP PI Opportunity Listing (September 2019 - June

20)

71151 Miscellaneous ANO Key ERO Participation Rosters (3Q/2019 - 2Q/2020)

71151 Miscellaneous 3Q19 MSPI T-Sheets EDG-HPI

71151 Miscellaneous 1Q20 MSPI T-Sheets EDG-HPI

71151 Miscellaneous 2Q20 MSPI T-Sheets EDG-HPI

71151 Miscellaneous 4Q19 MSPI T-Sheets EDG-HPI

71151 Miscellaneous 20QTR-1 Limited Focus PI Drill - Green Team 02/25/2020

71151 Miscellaneous DEP PI 20190717 DEP Opportunity Package: SMPI July 07/02/2019

71151 Miscellaneous DEP PI 20190903 DEP Opportunity Package: Red Team 09/12/2019

71151 Miscellaneous DEP PI 20191101 DEP Opportunity Package: SMPI November 11/01/2019

71151 Miscellaneous DEP PI 20200610 DEP Opportunity Package: Red Team 06/18/2020

71151 Miscellaneous EOF-PI-2019-04 DEP Opportunity Package: Blue Team 09/26/2019

71151 Procedures EN-FAP-EP-005 Emergency Preparedness Performance Indicators 13

71152 Corrective Action CR-ANO- 2-2018-00852, 2-2018-00883, 2-2019-03313, 2-2020-00560,

Documents 2-2020-01987, 2-2020-01996, 2-2020-02451, 2-2020-02455,

2-2020-02467, 2-2020-02850, 2-2020-02904, 2-2020-02921,

2-2020-02924, 2-2020-02971, 2-2020-03036, C-2018-03338

71152 Drawings E-2299, Sheet 1A

Inspection Type Designation Description or Title Revision or

Procedure Date

71152 Drawings E-2638, Sheet 1

71152 Drawings M-2242-AA-26

71152 Drawings P&ID M-2210 6PEAR-95-0290

SHEET 1-4

71152 Engineering EC-86561

Changes

71152 Miscellaneous GL-89-10 Safety Related MOV Testing and Surveillance

71152 Procedures EN-LI-100 10 CFR 50.59 Evals 20

71152 Procedures EN-LI-100 Process Applicability Determination 29

71152 Procedures OP-2104.029 Service Water Operations 39

71152 Procedures OP-2305.005 Valve Stroke and Position Verification 16

71152 Work Orders WO 501163, 517346, 545045, 547841

71153 Corrective Action CR-ANO- 2-2020-02964, 2-2020-03214, 2-2020-03218, C-2020-02529

Documents

71153 Drawings M-2205, Sheet 1 Piping and Instrument Diagram - Extraction Steam Heater 45

Vents and Drains

71153 Drawings M-2205, Sheet 4 Piping and Instrument Diagram - Extraction Steam Heater 13

Vents and Drains

71153 Drawings M-2206, Sheet 1 Steam Generator Secondary System 154

24