rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (REPORT 05000313/2018006 AND 05000368/2018006)

Dear Mr. Anderson:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Arkansas Nuclear One, Units 1 and 2, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2018, through December 31, 2018.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Arkansas Nuclear One, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all performance indicators were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

On May 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One facility, Units 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18165A206). During this inspection, the inspection team reviewed the last of the specific actions from the Arkansas Nuclear One Comprehensive Recovery Plan to which you committed via a Confirmatory Action Letter (CAL)

dated June 17, 2016 (ADAMS Accession No. ML16169A193)(EA-16-124). As a result of closing the Yellow findings and the CAL, the NRC updated its assessment of Arkansas Nuclear One, Units 1 and 2. Based on a review of current performance indicators and inspection results at that time, the NRC determined the performance at Arkansas Nuclear One, Units 1 and 2, to be in the Licensee Response Column (Column 1) of the Reactor Oversight Process Action Matrix.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/194, Inspection of the Licensee's Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01).

Also, in accordance with Inspection Manual Chapter 0305, Section 10.02.d.7, a follow-up inspection of your improvement initiatives completed since the Confirmatory Action Letter (EA-16-124) was closed using Inspection Procedures 71152, Problem Identification and Resolution, and 71153, Follow-up of Events and Notices of Enforcement Discretion, will be performed. This is reflected in the enclosure as Post Column 4 Follow-up.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1574 with any questions you have regarding this letter.

Sincerely,

/RA/

Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:

Inspection Plan

IP 22 Inspection Activity Plan Report 07200013 - ANO 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count ANO Loading Inspection and TI 2690 Aging Management Inspection 4 1 05/01/2019 05/31/2019 TI 2690/011 001454 Review of Aging Management Programs at Independent Spent Fuel Storage Installations This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

2/28/2019 12:04:37 PM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Entergy Confirmatory Order Inspection 2 1, 2 01/01/2019 03/31/2019 IP 92702 000238 Followup on Corrective Actions For Violations And Deviations TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 01/27/2019 02/02/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

1, 2 02/10/2019 02/16/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

TARGET SET INSPECTION 3 1, 2 02/01/2019 03/01/2019 IP 71130.14 000743 Review of Power Reactor Target Sets Security Protective Strategy .05 2 1, 2 02/17/2019 05/24/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 04/08/2019 04/12/2019 IP 71130.05 000737 Protective Strategy Evaluation ANO 2019 INITIAL EXAM (UNIT 2) 8 2 03/24/2019 03/30/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 04/21/2019 04/27/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RP INSPECTION (2,4) 2 1, 2 05/06/2019 05/10/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 05/06/2019 05/10/2019 IP 71124.04 000728 Occupational Dose Assessment TI 2515/194 0 1, 2 06/02/2019 06/08/2019 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

ANO 2019 BRQ (UNIT 1) 2 1 07/07/2019 07/13/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Biennal Problem Identification and Resolution Inspection 4 1, 2 08/05/2019 08/09/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 08/19/2019 08/23/2019 IP 71152B 000747 Problem Identification and Resolution EP PROGRAM INSPECTION 1 1, 2 08/26/2019 08/30/2019 IP 71114.02 000717 Alert and Notification System Testing This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

2/28/2019 12:04:37 PM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count EP PROGRAM INSPECTION 1 1, 2 08/26/2019 08/30/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 08/26/2019 08/30/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 08/26/2019 08/30/2019 IP 71151 001397 Performance Indicator Verification Security Access Control .02 1 1, 2 09/09/2019 09/13/2019 IP 71130.02 000734 Access Control 1, 2 09/09/2019 09/13/2019 IP 71151 001338 Performance Indicator Verification RP INSPECTION (1,3) 2 1, 2 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ANO 10CFR50.59 INSPECTION 3 1, 2 11/18/2019 11/22/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments ANO 2020 INITIAL EXAM (UNIT 1) 7 1 03/01/2020 03/07/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 03/29/2020 04/04/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection 2R27 1 2 03/23/2020 04/03/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RS 12PI Radiation Safety 2 1, 2 03/23/2020 03/27/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/23/2020 03/27/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls Arkansas Nuclear 1, 2 - Design Bases Assurance Inspection (Programs) 3 1, 2 06/08/2020 06/12/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 06/22/2020 06/26/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RS5678 Radiation Safety PS Team 4 1, 2 06/15/2020 06/19/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 06/15/2020 06/19/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/15/2020 06/19/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 06/15/2020 06/19/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

2/28/2019 12:04:37 PM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count MC&A - Material Control & Accounting 1 1, 2 06/15/2020 06/19/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

ANO 2020 BRQ (Unit 2) 3 2 07/05/2020 07/11/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

EP Exercise and PI Inspection 4 1, 2 09/14/2020 09/18/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 09/14/2020 09/18/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.

2/28/2019 12:04:37 PM

ML19053A515 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JLD Yes No Publicly Available Sensitive NRC-002 OFFICE RIV/DRP C:DRP/D NAME JDixon NOKeefe SIGNATURE /RA/ /RA/

DATE 2/12/19 3/4/19