Updated Inspection Plan for Arkansas Nuclear One (Report 05000313/2018005 and 05000368/2018005)
ML18234A070
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/31/2018
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-D
To: Richard Anderson
Entergy Operations
O'Keefe N
References
IR 2018005
Download: ML18234A070 (6)


Text

ust 31, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (REPORT 05000313/2018005 AND 05000368/2018005)

Dear Mr. Anderson:

As a result of its quarterly review of plant performance, which was completed on August 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) determined the performance at Arkansas Nuclear One Unit 1 to remain in the Licensee Response Column (Column 1) of the Reactor Oversight Process Action Matrix. The NRCs evaluation consisted of a review of performance indicators and inspection results.

The NRCs review of Arkansas Nuclear One Unit 1 identified that the Unplanned Scrams with Complications performance indicator was initially reported as having crossed the Green-to-White threshold for the second quarter of 2018 as a result of having two scrams that met the reporting criteria. The performance issues included an automatic scram following an operator error that caused the only running main feedwater pump to trip during a plant startup following a refueling outage on May 16, 2018, and a manual scram to terminate the power increase that resulted from the failure of instrument air tubing which caused one turbine bypass valve to open during a plant startup on June 16, 2018.

However, on June 20, 2018, you submitted Frequently Asked Question 18-04 to request a site-specific exemption to the NEI 99-02, Regulatory Assessment Performance Indicator Guideline, for reporting the May 2018 scram as an Unplanned Scram with Complication. Upon reviewing the event details, prior applicable Frequently Asked Questions, and discussing the circumstances surrounding the May 16, 2018 reactor trip with regional staff, resident inspectors, technical training staff, and the licensee, the NRC determined that the specific set of circumstances associated with this reactor trip for this specific plant can be viewed as rare and unique, and that an exemption from counting the reactor trip as an Unplanned Scram with Complication per the criteria in NEI 99-02 is appropriate. Therefore, the NRC staff approved the request for a plant-specific exemption from counting the May 16, 2018, Arkansas Nuclear One Unit 1 scram as a complicated scram on August 20, 2018 (ADAMS Accession Number ML18232A233). This results in the Unplanned Scram with Complications performance indicator remaining in the Green band with only the June 2018 event. Therefore, Arkansas Nuclear One remains in the Licensee Response Column. Both scrams are being reviewed under the baseline inspection program. The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Arkansas Nuclear One. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/194, Inspection of the Licensee's Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01).

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1574 with any questions you have regarding this letter.

Sincerely,

/RA/

Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure: Inspection Plan

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count CYBER SECURITY INSPECTION 6 1, 2 08/06/2018 08/10/2018 IP 71130.10P 000741 Cyber Security ANO DESIGN BASES ASSURANCE TEAM 7 1, 2 08/13/2018 08/31/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

INSERVICE INSPECTION 2R26 1 2 10/08/2018 10/19/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR SECURITY SOLO INSPECTION 1 1, 2 11/05/2018 11/09/2018 IP 71130.02 000734 Access Control 1, 2 11/05/2018 11/09/2018 IP 71151 001338 Performance Indicator Verification FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 1, 2 11/26/2018 11/30/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 12/17/2018 12/21/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 01/28/2019 02/01/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

1, 2 02/11/2019 02/15/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

TARGET SET INSPECTION 3 1, 2 02/01/2019 03/01/2019 IP 71130.14 000743 Review of Power Reactor Target Sets TI 2515/194 2 1, 2 03/04/2019 03/08/2019 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

INITIAL EXAM (UNIT 2) 8 2 03/24/2019 03/30/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 04/21/2019 04/27/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Security Protective Strategy .05 2 1, 2 04/08/2019 04/12/2019 IP 71130.05 000737 Protective Strategy Evaluation Enclosure This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

8/22/2018 10:04:03 AM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count POST COLUMN 4 FOLLOW-UP 4 1, 2 04/15/2019 06/21/2019 IP 994OA7 PLACEHOLDER Licencee Identified Non-Cited Violations - Count for Office of Enforcement RP INSPECTION (2,4) 2 1, 2 05/06/2019 05/10/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 05/06/2019 05/10/2019 IP 71124.04 000729 Occupational Dose Assessment BRQ (UNIT 1) 2 1 07/07/2019 07/13/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

BIENNIAL PI&R 4 1, 2 08/05/2019 08/09/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 08/19/2019 08/23/2019 IP 71152B 000747 Problem Identification and Resolution EP PROGRAM INSPECTION 1 1, 2 08/26/2019 08/30/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 08/26/2019 08/30/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 08/26/2019 08/30/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/26/2019 08/30/2019 IP 71151 001397 Performance Indicator Verification Security Access Control .02 1 1, 2 09/09/2019 09/13/2019 IP 71130.02 000734 Access Control 1, 2 09/09/2019 09/13/2019 IP 71151 001338 Performance Indicator Verification INSERVICE INSPECTION 1R18 1 1 10/14/2019 10/25/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP INSPECTION (1,3) 2 1, 2 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ANO 10CFR50.59 INSPECTION 3 1, 2 11/18/2019 11/22/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

8/22/2018 10:04:03 AM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count INITIAL EXAM UNIT 1 6 1 03/01/2020 03/07/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 03/29/2020 04/04/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RS 12PI Radiation Safety 2 1, 2 03/23/2020 03/27/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/23/2020 03/27/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls Arkansas Nuclear 1, 2 - Design Bases Assurance Inspection (Programs) 3 1, 2 06/08/2020 06/12/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 06/22/2020 06/26/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RS5678 Radiation Safety PS Team 4 1, 2 06/15/2020 06/19/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 06/15/2020 06/19/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/15/2020 06/19/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 06/15/2020 06/19/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MC&A - Material Control & Accounting 1 1, 2 06/15/2020 06/19/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

8/22/2018 10:04:03 AM

ML18234A070 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JDixon/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE RIV/DRP RIV/DRP:BC NAME JDixon NOKeefe SIGNATURE /RA/ /RA/

DATE 8/20/18 8/21/18