UNITE D S TATES NUC LEAR REGULATOR Y C OMMIS SI ON May 16, 2011

SUBJECT:

ARKANSAS NUCLEAR ONE - NRC SECURITY INSPECTION REPORT 05000313/2011403, 05000368/2011403

Dear Mr. Schwarz:

On April 14, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Arkansas Nuclear One, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 14, 2011, with Mr. M. Chisum, General Manager, Plant Operations, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified. However, four examples of one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. Because of the very low security significance and because this violation was entered into your corrective action program, the NRC is treating this violation as a noncited violation (NCV) consistent with Section 2.3.2.a of the NRC Enforcement Policy. If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the and the NRC Senior Resident Inspector at Arkansas Nuclear One. Entergy Operations, Inc. -2-In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-313, 50-368 License No.: DPR-51, NPF-6 Nonpublic Enclosure:

NRC Inspection Report 05000313/2011403, 05000368/2011403 w/Attachment: Supplemental Information cc w/enclosure:

Bryan Lovin Manager, Security Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Entergy Operations, Inc. -3-cc w/o enclosure:

John T. Herron President and CEO/

Nuclear Operations/CNO Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Thomas Palmisano Vice President, Oversight Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Jeffrey S. Forbes Senior Vice President Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Dale James Director, Nuclear Safety Assurance Entergy Operations, Inc.

Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 Stephanie Pyle Acting Manager, Licensing Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Joseph A. Aluise Associate General Counsel - Nuclear Entergy Services, Inc 639 Loyola Avenue New Orleans, LA 70113 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. -4-Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Resident Inspector (Jeff.Rotton@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Project Engineer (Chris.Smith@nrc.gov)

Resident Inspector (William.Schaup@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)

Security Related Complete Report - OUO:

SUNSI Review Completed: PRF ADAMS: Yes Initials: PRF

Non-Publicly Available : Sensitive-Security- Related-Periodic Review Required Letter Only:

SUNSI Review Completed: ADAMS: : Yes Initials: PRF

Publicly Available : Non-Sensitive PSI:PSB1 C:PSB1 C:DRP/PBE C:PSB1 PRFrechette MPShannon JClark MPShannon

/RA/ /RA/ /RA/ /RA/

5/11/11 5/11/11 5/16/11 5/16/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax