Forwards Summary of 850515 Mgt Meeting W/Util at Region II Re Findings in Insp Rept 50-302/85-22 Concerning Recertification of Facility Licensed Operator Candidates. List of Meeting Attendees Also Encl
ML20133H642
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 06/28/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8508090434
Download: ML20133H642 (4)


Text

'

. 6 Craal JUN 2 8 885 Florida Power Corporation ATTN: Mr. W. S. Wilgus Vice President Nuclear Operations P. O. Box 14042, M.A.C. H-2 St. Petersburg, FL 33733 Gentlemen:

SUBJECT: MEETING SUMMARY - CRYSTAL RIVER 3, DOCKET NO. 50-302 This refers to the management meeting conducted at your request in the NRC Region II office on May 15, 1985. The meeting was held to discuss the NRC inspection findings documented in Inspection Report 85-22 concerning the recertification of licensed operator candidates at Crystal River 3. The details of the meeting are provided in Enclosure 1. A list of attendees at the meeting is shown in Enclosure It is our opinion that this meeting was beneficial in that it enabled us to better understand those actions you plan to take to adequately recertify the nine licensed operator candidates of December 198 ,

In accordance with Section 2.790 of NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Roo Should you have any questions concerning these matters, we will be pleased to discuss the

Sincerely, l61 b. NCIE07 bifTK'6 J. Nelson Grace Regional Administrator Enclosures: Meeting Summary Meeting Attendees cc w/encls:

,

E. M. Howard, Director i Site Nuclear Operations P. F. McKee, Nuclear Plant Manager G. R. Westafer, Manager Nuclear Operations Licensing and Fuel Management bec w/encis: (See page 2)

8508090434 PDR e50628 ADOCK 05000302 G PDR s l j D I l

.

.

JUN 28 isoa

.

Florida Power Corporation 2 bec w/encls: .

NRC Resident Inspector  !

Document Control Desk State of Florida

.

- .

,

RI RI: RII RH RII R garro11:jw VP)inciera h

VBrownlee PBe s R(Wiker$$

J shinski 3/Jl/85 6/3 /85 6/3/85 6/3/85 6 /85 6 /85

_ _ _ _ _ _ _ _ _ -

.

JUN 2 81985 ENCLOSURE 1 MEETING SUMMARY On May 15, 1985, representatives of Florida Power Corporation (FPC) met with the NRC at FPC's request, in the NRC Regional Office in Atlanta, Georgia. The topic of discussion was the discrepancies identified during a recent inspection and documented in NRC Inspection Report 85-22 regarding the recertification of the nine licensed operator candidates of December 198 The required actions to correct these discrepancies were discussed at this meeting and are listed below as agreed upon by both FPC and the NR Each of the nine candidates shall: Receive a walk-through examination of the plant and its systems, which will include an evaluation of the candidate's knowledge emphasizing the immediate corrective actions contained in the abnormal and emergency operating pro-cedures, the location of plant equipment as well as SRO candidate's ability

. to apply protective action guidelines. Deficiencies will be documented and remedial training will be given in the cases of unsatisfactory performanc . Receive an oral examination by a board consisting of at least three qualified people. Such an examination can be graded on a pass / fail basis. Deficiencies will be documented and remedial training will be given in the cases of unsatisfactory performanc . Receive the additional hours of training in heat transfer / fluid flow /thermo-dynamics and mitigation of core damage as required to meet the previous FPC commitment of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> and 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> total training in these two areas respectivel . Have their on-shift training records reviewed to ensure that required training has been complete For the SRO candidates, on-shift training will be augmented by being placed back on-shift as trainees for three week Sufficient on-shift time in training for the license being sought shall be i verified by the oral examinatio . Have performed or directed five reactivity manipulations on the Crystal River plan FPC will document these manipulations and ensure all candidates fulfill this requiremen . Have had reviewed their training summary sections of NRC-398 forms pre-viously filed with the NRC. FPC shall submit correspondence to the NRC Region II that identifies differences between the NRC-398 forms previously filed, and that training which can be supported by clear documentatio The NRC pointed out that, although the above actions addressed those discre-pancies found by the NRC, FPC should ensure that no others exist. FPC acknowl-edged their understanding of the NRC position, and indicated that they would notify the NRC when the oral and walk-through examinations were scheduled to be give r

.

.

JUN 2 81985 ENCLOSURE 2 MEETING ATTENDEES Florida Power Corporation E. M. Howard, Director, Site Nuclear Operations J. P. Alberdi, Manager, Site Nuclear Operations, Technical Services R. M. Bright, Manager, Nuclear Licensing L. C. Kelly, Manager, Nuclear Operations Training Nuclear Regulatory Commission R. D. Walker, Director, Division of Reactor Projects (DRP)

P. R. Bemis, Director, Division of Reactor Safety (DRS)

V. L. Brownlee, Chief, Reactor Projects Branch 2, DRP C. A. Julian, Chief, Operational Programs Section, Operations Branch, DRS R. E. Carroll, Project Engineer, DRP W. G. Douglas, Licensing Examiner, DRS

(

!