Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005)
ML17242A212
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/28/2017
From: Jason Kozal
NRC/RGN-IV/DRP
To: Dent J
Nebraska Public Power District (NPPD)
JASON KOZAL
References
IR 2017005
Download: ML17242A212 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

SUBJECT:

UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)

Dear Mr. Dent:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Jason Kozal, Chief Division of Reactor Projects Docket No. 50-298 License No. DPR-46 Enclosure:

Inspection Plan for Cooper Nuclear Station

ML17242A212 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE /RA/

DATE 8/28/17

Page 1 of 2 Cooper 08/25/2017 08:18:35 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - LOADING INSPECTION 1 1 07/24/2017 07/28/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BRQ - BRQ INSPECTION 3 1 10/02/2017 10/06/2017 IP 7111111B Licensed Operator Requalification Program EB1-21N - CNS DESIGN BASIS PROGRAMS INSPECTION 3 1 08/14/2017 09/01/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

RS 5678 - RS TEAM 4 1 10/02/2017 10/06/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 10/02/2017 10/06/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 10/02/2017 10/06/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 10/02/2017 10/06/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS 24 - RAD SAFETY 2 1 02/12/2018 02/16/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 02/12/2018 02/16/2018 IP 71124.04 Occupational Dose Assessment EXAM - INITIAL EXAM 3 1 08/27/2018 08/31/2018 X02624 INITIAL EXAM COOPER (12/18)

1 09/24/2018 09/28/2018 X02624 INITIAL EXAM COOPER (12/18)

EB1-21M - COOPER DESIGN BASES ASSURANCE TEAMS 6 1 04/02/2018 04/20/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

EP-1 - EP EXERCISE INSPECTION 4 1 07/30/2018 08/03/2018 IP 7111401 Exercise Evaluation 1 07/30/2018 08/03/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 07/30/2018 08/03/2018 IP 71151-EP01 Drill/Exercise Performance 1 07/30/2018 08/03/2018 IP 71151-EP02 ERO Readiness 1 07/30/2018 08/03/2018 IP 71151-EP03 Alert & Notification System Reliability EB1-07T - CNS HEAT SINK PERFORMANCE 2 1 08/20/2018 08/24/2018 IP 7111107T Heat Sink Performance 7111108 - INSERVICE INSPECTION RF30 1 1 10/08/2018 10/19/2018 IP 7111108G Inservice Inspection Activities - BWR RS 12PI - RAD SAFETY 2 1 10/15/2018 10/19/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/15/2018 10/19/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 10/15/2018 10/19/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Cooper 08/25/2017 08:18:35 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 12PI - RAD SAFETY 2 1 10/15/2018 10/19/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness EB2-05XT - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 04/15/2019 04/19/2019 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1 04/29/2019 05/03/2019 IP 7111105X Fire Protection - NFPA 805 (Triennial)

EP-1 - EP PROGRAM INSPECTION 1 1 05/06/2019 05/10/2019 IP 7111402 Alert and Notification System Testing 1 05/06/2019 05/10/2019 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/06/2019 05/10/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/06/2019 05/10/2019 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 05/06/2019 05/10/2019 IP 71151-EP01 Drill/Exercise Performance 1 05/06/2019 05/10/2019 IP 71151-EP02 ERO Readiness 1 05/06/2019 05/10/2019 IP 71151-EP03 Alert & Notification System Reliability RS 13 PI - RP INSPECTION 3 1 05/20/2019 05/24/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/20/2019 05/24/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/20/2019 05/24/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 05/20/2019 05/24/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences PI&R - BIENNIAL PI&R INSPECTION 4 1 06/24/2019 06/28/2019 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.