IR 05000295/1985026

From kanterella
Jump to navigation Jump to search
Physical Protection Insp Repts 50-295/85-26 & 50-304/85-27 on 850722-25.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures.Safeguards Info Deleted (Ref 10CFR73.21)
ML20134E238
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/14/1985
From: Creed J, Drcuin B, Drouin B, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20134E193 List:
References
50-295-85-26, 50-304-85-27, NUDOCS 8508200100
Download: ML20134E238 (2)


Text

. .

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Reports No. 50-295/85026(DRSS); 50-304/85027(DRSS)

Docket Nos. 50-295; 50-304 Safeguards Group IV Licenses No. DPR-39; DPR-48 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 Facility Name: Zion Nuclear Station, Units 1 and 2 Inspection At: Zion Station, Zion, Illinois Inspection Conducted: July 22-25, 1985 Date of Last Physical Security Inspection: March 25-28,19Q5

.

Type of Inspection: Unannounced Physical Protection Inspection b

Inspectors:[o'J. RMnfceley ud 6////45~

Dat'e '

Physical Security Inspector md 9) / Y7G~

B. Drouih Date Physical Security Inspector Approved By: /K g/R. Creed, Chief Date

- Wafeguards Section Inspection Summary Inspection on July 22-25, 1985 (Reports No. 50-295/85026(DRSS);

50-304/85027(DRSS))

Areas Inspected: Included a review of the Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Physical Barriers -

Protected Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Detection Aids - Protected Areas; and Communications. The inspectors reviewed the licensee's actions / performance relating to weaknesses /

concerns identified in previous inspection reports or which were identified as a result of a Region III analysis of previous inspection findings; 10 CFR 73.71(c)

security event reports and the previous SALP report. The inspection involved 66 inspector-hours by two NRC inspector The inspection began during the day shif Enclosure contains 8508200100 850814 N.FORKION pon separation this PDR ADOCK 05000295 page is Decontrolled G PDR i

--

. -.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection. One previously identified weakness was found to have been satisfactorily correcte (Details - UNCLASSIFIED )

(2