IR 05000285/2015403

From kanterella
Jump to navigation Jump to search
IR 05000285/2015403, on 06/18/2015, Fort Calhoun Station - NRC Security Baseline Inspection Report
ML15195A469
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/13/2015
From: Mark Haire
Plant Support Branch-1
To: Cortopassi L
Omaha Public Power District
References
IR 2015403
Download: ML15195A469 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION uly 13, 2015

SUBJECT:

FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015403

Dear Mr. Cortopassi:

On June 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with you, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket 50-285 License DPR-40 Nonpublic Enclosure:

NRC Inspection Report 05000285/2015403 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o enclosure:

Electronic Distribution for Fort Calhoun Station ML15195A469 SUNSI Review ADAMS Publicly Available Keyword:

By: MSH Yes No Non-Publicly Available MD 3.4 Non-Public A.3 SUNSI Review ADAMS Publicly Available Keyword:

By: MSH Yes No Non-Publicly Available NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:DRP/B C:PSB1 NAME JLarsen AMeyen MHaire GMiller MHaire SIGNATURE /RA/ /RA/ E /RA/ /RA/ RCH for /RA/

DATE 7/10/15 7/13/15 7/13/15 7/13/15 7/13/15 Letter to Lou Cortopassi from Mark S. Haire, dated July 13, 2015 SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015403 Electronic distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)

Electronic Distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (Brian.Cummings@nrc.gov)

FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

ROPReports