UNITED STATES NUCLEAR REGULATORY COMMISSION ust 21, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2017005 AND 05000281/2017005

Dear Mr. Stoddard:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Surry Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available, correspondence.

Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an initial license examination and Post Approval License Renewal Phase 4.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at 404-997-4465 with any questions you may have regarding this letter.

Sincerely,

/RA/

Anthony D. Masters, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure:

Surry Inspection / Activity Plan (09/01/2017 - 06/30/2019)

ML17233A198 OFFICE RII/DRP RII/DRP RII/DRP NAME BBishop SNinh AMasters DATE 8/15/2017 8/15/2017 8/ 21/2017

Page 1 of 2 Surry 08/21/2017 10:02:36 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 7 1, 2 08/28/2017 09/01/2017 IP 7111121M Design Bases Assurance Inspection (Teams)

OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/02/2017 10/06/2017 V23502 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 10/30/2017 11/10/2017 V23502 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC BASELINE INSPECTION 2 1, 2 11/27/2017 12/01/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/27/2017 12/01/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 11/27/2017 12/01/2017 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 8 1, 2 02/26/2018 03/01/2018 IP 7111105T Fire Protection [Triennial]

1, 2 03/12/2018 03/16/2018 IP 7111105T Fire Protection [Triennial]

EP - EP PROGRAM INSPECTION 3 1, 2 04/09/2018 04/13/2018 IP 7111402 Alert and Notification System Testing 1, 2 04/09/2018 04/13/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 04/09/2018 04/13/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 04/09/2018 04/13/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 04/09/2018 04/13/2018 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 04/30/2018 05/04/2018 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 04/30/2018 05/04/2018 IP 7111108P Inservice Inspection Activities - PWR EQI - DESIGN BASES ASSURANCE INSPECTION (PROGR 3 1, 2 06/18/2018 06/22/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2 07/09/2018 07/13/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2 07/23/2018 07/27/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 09/10/2018 09/14/2018 IP 71152B Problem Identification and Resolution 1, 2 09/23/2018 09/27/2018 IP 71152B Problem Identification and Resolution ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 11/05/2018 11/09/2018 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Surry 08/21/2017 10:02:36 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL - WEEK 1 3 1, 2 11/05/2018 11/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/05/2018 11/09/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/05/2018 11/09/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/05/2018 11/09/2018 IP 71124.04 Occupational Dose Assessment 1, 2 11/05/2018 11/09/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/05/2018 11/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 11/05/2018 11/09/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 11/05/2018 11/09/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 2 2 1, 2 11/26/2018 11/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/26/2018 11/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/26/2018 11/30/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/26/2018 11/30/2018 IP 71124.04 Occupational Dose Assessment 1, 2 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/26/2018 11/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 11/26/2018 11/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences LR - POST-APPROVAL LR PHASE 4 2 1, 2 01/28/2019 02/01/2019 IP 71003 Post-Approval Site Inspection for License Renewal MODS - EVALUATIONS OF CHANGES, TESTS AND EXPERI 3 1, 2 04/22/2019 04/26/2019 IP 7111117T Evaluations of Changes, Tests, and Experiments RP - RP PUBLIC 2 1, 2 05/20/2019 05/24/2019 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 05/20/2019 05/24/2019 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 05/20/2019 05/24/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 05/20/2019 05/24/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.