IR 05000261/2018412

From kanterella
Jump to navigation Jump to search
NRC Material Control and Accounting Inspection Report 05000261/2018412 - OUO Information Removed
ML18333A258
Person / Time
Site: Robinson Duke energy icon.png
Issue date: 11/29/2018
From: Randy Musser
NRC/RGN-II/DRP/RPB3
To: Remick J
Duke Energy Progress
References
IR 2018412
Download: ML18333A258 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 29, 2018 Jeffrey Remick, Director Nuclear Plant Security H. B. Robinson Steam Electric Plant 3581 West Entrance Road RNPA12 Hartsville, South Carolina 29550 SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000261/2018412

Dear Mr. Remick:

On November 1, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting (MC&A) inspection at your H. B. Robinson Steam Electric Plant, Unit 2.

On November 19, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, and therefore will not be made publically available in accordance with 10 CFR 2.390(d)(1).

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-261 License Nos. DPR-23 Enclosure:

IR 05000261/2018412 cc: See Next page Enclosure transmitted herewith contains SUNSI. When separated from the Enclosure, this document is decontrolled.