IR 05000261/2018410

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Security Inspection Report 05000261/2018410 (Public)
ML18208A402
Person / Time
Site: Robinson Duke energy icon.png
Issue date: 07/27/2018
From: Binoy Desai
Division of Reactor Safety II
To: Remick J
Duke Energy Progress
References
IR 2018410
Download: ML18208A402 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION uly 27, 2018

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000261/2018410

Dear Mr. Remick:

On June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your H.B. Robinson Steam Electric Plant Unit 2, and discussed the results of this inspection with Mr. J. Kammer and other members of the licensee staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more than minor significance.

However, the inspector documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 LIMITED INTERNAL DISTRIBUTION PERMI in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-261 License Nos: DPR-23 Enclosure:

NRC IR 05000261/2018410 w/Attachment: Supplemental Information cc: (See page 3) cc:

Edward T. ONeil GM, Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 : SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRP/BR6 RII:DRS/PSB SIGNATURE JHW2 BBD RXM1 BBD NAME J. Wallo B. Desai R. Musser B. Desai DATE 7/ 25 /2018 7/ 27 /2018 7/ 26 /2018 7/ 27 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO