IR 05000259/2018412

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Security Inspection Report 05000259/2018412, 05000260/2018412 and 05000296/2018412 (Public)
ML18164A017
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/11/2018
From: Binoy Desai
Division of Reactor Safety II
To: James Shea
Tennessee Valley Authority
References
IR 2018412
Download: ML18164A017 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION une 11, 2018

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000259/2018412, 05000260/2018412 AND 05000296/2018412

Dear Mr. Shea:

On May 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an in office inspection of a security concern that occurred at the TVA Corporate Office Complex and impacted the Browns Ferry Nuclear Plant, Units 1, 2, and 3. The results of this inspection were discussed with Mr. S. Sovizral and other members of your staff. These results are documented in the enclosed report.

The NRC inspector documented a finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2(a) of the Enforcement Policy.

If you contest the violation or the significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Browns Ferry Nuclear Plant.

A cross-cutting aspect was assigned to the finding in the area of Human Performance.

Specifically, because Browns Ferry Nuclear Plant did not properly use error reduction tools while storing safeguards information (H.12).

If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to Regional Administrator, Region II, and the NRC Resident Inspector at Browns Ferry Nuclear Plant.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-259, 50-260 and 50-296 License Nos: DPR-33, DPR-52 and DPR-68 Enclosure:

NRC IR 05000259/2018412, 260/2018412 and 296/2018412 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) cc:

Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Steve Sovizral Senior Manager, Site Security Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000, PAB 2G-BFN Athens, AL 35609 Mr. D. Lang Hughes Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000, NAB 2A-BFN Decatur, AL 35609 Mr. Glen E. Pry Site Operations, Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000, NAB 1A-BFN Decatur, AL 35609 Mr. James A. Kent Director, Plant Support Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000, NAB 1A-BFN Decatur, AL 35609 Mr. Werner K. Paulhardt Plant Manager, Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2C-BFN Decatur, AL 35609 ML18164A017 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRP/BR6 RII:DRS/PSB SIGNATURE JOB2 JCS3 BBD ADM2 BBD NAME J. Brown J. Shehee B. Desai A. Masters B. Desai DATE 5/ 31 /2018 5/ 31 /2018 6/ 1 /2018 6/ 11 /2018 6/ 11 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO