IR 05000250/1985030

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/85-30 & 50-251/85-30
ML20141D841
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8604080291
Preceding documents:
Download: ML20141D841 (1)


Text

'k MAR 31 1986 F19 rida Power and Light Company fN: M C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT: REPORT NOS. 50-250/85-30 AND 50-251/85-30 Thank you for your revised response of March 14, 1986, to our Notice of Violation issued on November 12, 1985, concerning activities conducted at your Turkey Point facilit We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matte

Sincerely, Original Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects cc: J. M. Wethy, Vice President Turkey Point Nuclear Plant vC. J. Baker, Plant Manager Turkey Point Nuclear Plant f.W.Bladow,PlantQA Superintendent g Arias, Jr. , Regulatory and Compliance Supervisor bcc: C Resident Inspector Document Control Desk State of Florida RI RII, RII Shuenther:jd S 1 rod VPa iera 3/21/86 3h//86 3/)/86 B604090291 860331 PDR ADOCK 05000250 G PDR l

1 0 2 01