rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR INDIAN POINT ENERGY CENTER, UNITS 2 AND 3 (REPORTS 05000247/2018006 AND 05000286/2018006)

Dear Mr. Vitale,

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Indian Point Energy Center, Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Indian Point Energy Center, Units 2 and 3 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Indian Point Energy Center, Units 2 and 3.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, the NRC will conduct Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Facility (ISFSI) at Operating Plants, in April 2019.

You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. Furthermore, all the inspections listed during the last twelve months of the inspection plan are tentative and may be revised. Additionally, in a letter (ADAMS Accession No. ML17044A004) dated February 8, 2017, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Indian Point Energy Center, Units 2 and 3. Unit 2 will shut down by April 30, 2020, and Unit 3 will shut down by April 30, 2021. Therefore, the inspection schedule is tentative and may be revised. Once you formally notify the NRC in accordance with 10 CFR 50.82(a)(1)(ii) that either Unit 2 or Unit 3 is permanently shutdown and that all the nuclear fuel has been removed from the reactor vessel, then that unit will transition from NRC IMC 0305, Operating Reactor Assessment Program, and IMC 2515, Light-Water Reactor Inspection Program - Operations Phase, to IMC 2561, Decommissioning Power Reactor Inspection Program. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

ML19060A202 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME BHaagensen via email MDraxton DSchroeder DATE 2/22/19 2/22/19 3/4/19

IP 22 Inspection Activity Plan Report Indian Point 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count INDIAN POINT 2 INITIAL OL EXAM 4 2 01/06/2019 01/11/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 02/03/2019 02/15/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RP Occupational Dose and Rad Instrumentation; 71124.04 & 71124.05 1 2, 3 01/14/2019 01/17/2019 IP 71124.04 000728 Occupational Dose Assessment 2, 3 01/14/2019 01/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 3 1 3 03/17/2019 03/30/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Radiological Exposure & Controls, IP 71124.01 1 2, 3 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls ISFSI OPERATIONAL INSPECTION 2 2, 3 04/21/2019 04/27/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EQ PROGRAM 3 2, 3 06/10/2019 06/14/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

2, 3 06/24/2019 06/28/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP PROGRAM INSPECTION 2 2, 3 07/15/2019 07/19/2019 IP 71114.02 000717 Alert and Notification System Testing 2, 3 07/15/2019 07/19/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 07/15/2019 07/19/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 2, 3 07/15/2019 07/19/2019 IP 71151 001397 Performance Indicator Verification PI&R BIENNIAL 4 2, 3 07/29/2019 08/02/2019 IP 71152B 000747 Problem Identification and Resolution 2, 3 08/12/2019 08/16/2019 IP 71152B 000747 Problem Identification and Resolution RP Gas & Liquid Effluent Treatment Monitors; IP 71124.06 (RETS) 1 2, 3 09/09/2019 09/13/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment ACCESS CONTROL, EQUIP PERF, TRAINING 3 2, 3 09/09/2019 09/13/2019 IP 71130.02 000734 Access Control 2, 3 09/09/2019 09/13/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

3/4/2019 10:13:08 AM Enclosure

IP 22 Inspection Activity Plan Report Indian Point 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING 3 2, 3 09/09/2019 09/13/2019 IP 71130.07 000739 Security Training 2, 3 09/09/2019 09/13/2019 IP 71151 001338 Performance Indicator Verification CYBER FULL IMP 4 2, 3 09/16/2019 09/20/2019 IP 71130.10P 000741 Cyber Security 2, 3 09/30/2019 10/04/2019 IP 71130.10P 000741 Cyber Security RAD HAZARD,DOSE ASSESSMENT, PI's 01, 04, PR01, OR01 1 2, 3 10/07/2019 10/11/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/07/2019 10/11/2019 IP 71124.04 000728 Occupational Dose Assessment IP3 REQUAL INSP WITH P/F RESULTS 2 3 10/13/2019 10/18/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

3 10/13/2019 10/18/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Radwaste 1 2, 3 10/14/2019 10/18/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MC&A 1 2, 3 10/20/2019 10/26/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

ISI - UNIT 2 1 2 03/09/2020 03/20/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazards, ALARA, Airborne IP's 71124.01, .02, .03 1 2, 3 03/09/2020 03/13/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 03/09/2020 03/13/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 03/09/2020 03/13/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Rad Environmental Monitoring Program; IP 71124.07 (REMP) 1 2, 3 05/18/2020 05/22/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

3/4/2019 10:13:08 AM

IP 22 Inspection Activity Plan Report Indian Point 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count TRIENNIAL FIRE PROTECTION 7 2, 3 06/08/2020 06/12/2020 IP 71111.05T 000696 Fire Protection (Triennial)

2, 3 06/22/2020 06/26/2020 IP 71111.05T 000696 Fire Protection (Triennial)

RP ALARA 71124.02 1 2, 3 08/03/2020 08/07/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls IP2 Requal Inspection with P/F Results 2 2 10/11/2020 10/16/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

2 10/11/2020 10/16/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

RP Rad Hazard, ALARA, Airborne, Perf. Indicators; IP's 71124.01 - .03; 71151 1 2, 3 10/19/2020 10/23/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/19/2020 10/23/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 10/19/2020 10/23/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/19/2020 10/23/2020 IP 71124.04 000728 Occupational Dose Assessment Access Control, Protective Strategy, TSR 4 2, 3 10/19/2020 10/23/2020 IP 71130.02 000734 Access Control 2, 3 10/19/2020 10/23/2020 IP 71130.05 000737 Protective Strategy Evaluation 2, 3 10/19/2020 10/23/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 2, 3 10/19/2020 10/23/2020 IP 71151 001338 Performance Indicator Verification 50.59 INSPECTION 3 2, 3 10/26/2020 10/30/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments INDIAN POINT EXERCISE INSPECTION 5 2, 3 11/16/2020 11/20/2020 IP 71114.01 000716 Exercise Evaluation 2, 3 11/16/2020 11/20/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.