ust 28, 2018

SUBJECT:

INDIAN POINT ENERGY CENTER, UNITS 2 AND 3 - UPDATED INSPECTION PLAN (INSPECTION REPORT 05000247/2018005 AND 05000286/2018005)

Dear Mr. Vitale:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Indian Point Energy Center, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedures 60845, Operation of Inter-Unit Fuel Transfer Canister and Cask System, and 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA Anthony Dimitriadis for/

Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure:

Inspection Plan cc: Distribution via ListServ

ML18240A161 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer DSchroeder/ADimitriadis for DATE 8/27/18 8/27/18

IP 22 Inspection Activity Plan Report Indian Point 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count TRIENNIAL HEAT SINK 1 2, 3 07/16/2018 07/20/2018 IP 71111.07T 000700 Heat Sink Performance -Triennial OPERATION OF INTER-UNIT FUEL TRANSFER 1 2, 3 08/01/2018 08/31/2018 IP 60845 000588 Operation of Inter-Unit Fuel Transfer Canister and Cask System RAD HAZARD, ALARA and DOSE ASSESS 01, 02, 04 1 2, 3 08/06/2018 08/10/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 08/06/2018 08/10/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 08/06/2018 08/10/2018 IP 71124.04 000728 Occupational Dose Assessment FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 2, 3 09/10/2018 09/14/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2, 3 10/01/2018 10/05/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EP EXERCISE INSPECTION 4 2, 3 09/24/2018 09/28/2018 IP 71114.01 000716 Exercise Evaluation 2, 3 09/24/2018 09/28/2018 IP 71151 001397 Performance Indicator Verification IP2 REQUAL INSP WITH P/F RESULTS 2 2 10/15/2018 10/19/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

2 10/15/2018 10/19/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

DBAI - Team 7 2, 3 10/22/2018 10/26/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2, 3 11/05/2018 11/09/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

ACCESS AUTH & CONTROL, SGI CONTROL, FFD 3 2, 3 10/29/2018 11/02/2018 IP 71130.01 000733 Access Authorization 2, 3 10/29/2018 11/02/2018 IP 71130.02 000734 Access Control 2, 3 10/29/2018 11/02/2018 IP 71130.06 000738 Protection of Safeguards Information 2, 3 10/29/2018 11/02/2018 IP 71130.08 000740 Fitness For Duty Program 2, 3 10/29/2018 11/02/2018 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

7/17/2018 6:34:05 AM Enclosure

IP 22 Inspection Activity Plan Report Indian Point 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS, PI's 01, 02, 03, 04, PR01, OR01 1 2, 3 12/03/2018 12/07/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/03/2018 12/07/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 12/03/2018 12/07/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/03/2018 12/07/2018 IP 71124.04 000728 Occupational Dose Assessment 2, 3 12/03/2018 12/07/2018 IP 71151 000746 Performance Indicator Verification INDIAN POINT 2 INITIAL OL EXAM 4 2 12/17/2018 12/21/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 02/04/2019 02/15/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 3 1 3 03/18/2019 03/29/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD HAZARD, ALARA, AIRBORNE .01, .02, .03 1 2, 3 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation DOSE ASSESS, INSTRUMENTATION, 04, 05 1 2, 3 05/13/2019 05/17/2019 IP 71124.04 000729 Occupational Dose Assessment 2, 3 05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation EQ PROGRAM 3 2, 3 06/10/2019 06/14/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

2, 3 06/24/2019 06/28/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP PROGRAM INSPECTION 2 2, 3 07/15/2019 07/19/2019 IP 71114.02 000717 Alert and Notification System Testing 2, 3 07/15/2019 07/19/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 07/15/2019 07/19/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 07/15/2019 07/19/2019 IP 71151 001397 Performance Indicator Verification PI&R BIENNIAL 4 2, 3 07/29/2019 08/02/2019 IP 71152B 000747 Problem Identification and Resolution 2, 3 08/12/2019 08/16/2019 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

7/17/2018 6:34:05 AM

IP 22 Inspection Activity Plan Report Indian Point 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06 1 2, 3 08/12/2019 08/16/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment ACCESS CONTROL, EQUIP PERF, TRAINING 3 2, 3 09/09/2019 09/13/2019 IP 71130.02 000734 Access Control 2, 3 09/09/2019 09/13/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 09/09/2019 09/13/2019 IP 71130.07 000739 Security Training 2, 3 09/09/2019 09/13/2019 IP 71151 001338 Performance Indicator Verification CYBER FULL IMP 2 2, 3 09/16/2019 09/20/2019 IP 71130.10P 000741 Cyber Security 2, 3 09/30/2019 10/04/2019 IP 71130.10P 000741 Cyber Security ISFSI OPERATIONAL INSPECTION 2 2, 3 10/07/2019 10/11/2019 IP 60855 001001 Operation Of An ISFSI 2, 3 10/07/2019 10/11/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RAD HAZARD,DOSE ASSESSMENT, PI's 01, 04, PR01, OR01 1 2, 3 10/07/2019 10/11/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/07/2019 10/11/2019 IP 71124.04 000729 Occupational Dose Assessment 2, 3 10/07/2019 10/11/2019 IP 71151 000746 Performance Indicator Verification IP3 REQUAL INSP WITH P/F RESULTS 2 3 10/14/2019 10/18/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

3 10/14/2019 10/18/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

MC&A 1 2, 3 10/21/2019 10/25/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

IP3 INITIAL OL EXAM 4 3 01/06/2020 01/10/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3 02/03/2020 02/07/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

ISI - UNIT 2 1 2 03/09/2020 03/20/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

7/17/2018 6:34:05 AM

IP 22 Inspection Activity Plan Report Indian Point 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count RP Rad Hazards, ALARA, Airborne IP's 71124.01, .02, .03 1 2, 3 03/09/2020 03/13/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 03/09/2020 03/13/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 03/09/2020 03/13/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RP REMP 71124.07 1 2, 3 05/04/2020 05/08/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program TRIENNIAL FIRE PROTECTION 7 2, 3 06/08/2020 06/12/2020 IP 71111.05T 000696 Fire Protection (Triennial)

2, 3 06/22/2020 06/26/2020 IP 71111.05T 000696 Fire Protection (Triennial)

This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.