IR 05000244/2018006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2018006)
ML19064B333
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/04/2019
From: Erin Carfang
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018006
Download: ML19064B333 (6)


Text

rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR THE R.E. GINNA NUCLEAR POWER PLANT, LLC (REPORT 05000244/2018006)

Dear Mr. Hanson,

The NRC has completed its end-of-cycle performance assessment of your R.E. Ginna Nuclear Power Plant, LLC (Ginna), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Ginna.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. Furthermore, all the inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, at your facility. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5120 with any questions you have regarding this letter.

Sincerely,

/RA/

Erin Carfang, Chief Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Enclosure:

R.E. Ginna Inspection Plan

ML19064B333 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook per email ECarfang DATE 2/22/19 2/26/19

IP 22 Inspection Activity Plan Report Ginna 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count GINNA LICENSE RENEWAL PHASE 4 3 1 03/18/2019 03/22/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal RADIATION SAFETY - RAD HAZ 1 1 03/25/2019 03/29/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RADIATION SAFETY - INSTRUMENTS 1 1 05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation DBAI - Teams 6 1 06/10/2019 06/14/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1 06/24/2019 06/28/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RADIATION SAFETY - REMP 1 1 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program FORCE-ON-FORCE PLANNING AND EXERCISES 8 1 08/05/2019 08/09/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 08/26/2019 08/30/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EP EXERCISE INSPECTION 5 1 08/19/2019 08/23/2019 IP 71114.01 000716 Exercise Evaluation 1 08/19/2019 08/23/2019 IP 71151 001397 Performance Indicator Verification ISFSI OPERATIONAL INSPECTION 1 1 09/30/2019 10/04/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiation Safety - RETS & PIV 1 1 09/30/2019 10/04/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 09/30/2019 10/04/2019 IP 71151 000746 Performance Indicator Verification ACCESS AUTH & CONTROL, FITNESS FOR DUTY 3 1 10/21/2019 10/25/2019 IP 71130.01 000733 Access Authorization 1 10/21/2019 10/25/2019 IP 71130.02 000734 Access Control 1 10/21/2019 10/25/2019 IP 71130.06 000738 Protection of Safeguards Information 1 10/21/2019 10/25/2019 IP 71130.08 000740 Fitness For Duty Program 1 10/21/2019 10/25/2019 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

1/14/2019 1:31:40 PM

IP 22 Inspection Activity Plan Report Ginna 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count PI&R Biennial Team Inspection 4 1 02/10/2020 02/14/2020 IP 71152B 000747 Problem Identification and Resolution 1 02/24/2020 02/28/2020 IP 71152B 000747 Problem Identification and Resolution Radwaste 1 1 04/06/2020 04/10/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radiation Safety - Rad Haz 1 1 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ISI - UNIT 1 1 1 04/19/2020 05/02/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Radiation Safety - ALARA 1 1 06/01/2020 06/05/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls MATERIAL CONTROL AND ACCOUNTABILITY 1 1 07/13/2020 07/17/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

Access Control, Protective Strategy, TSR 4 1 07/20/2020 07/24/2020 IP 71130.02 000734 Access Control 1 07/20/2020 07/24/2020 IP 71130.05 000737 Protective Strategy Evaluation 1 07/20/2020 07/24/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 1 07/20/2020 07/24/2020 IP 71151 001338 Performance Indicator Verification GINNA EP PROGRAM INSPECTION 1 1 07/27/2020 07/31/2020 IP 71114.02 000717 Alert and Notification System Testing 1 07/27/2020 07/31/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 07/27/2020 07/31/2020 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 07/27/2020 07/31/2020 IP 71151 001397 Performance Indicator Verification TRIENNIAL HEAT SINK 1 1 08/03/2020 08/07/2020 IP 71111.07T 000700 Heat Sink Performance -Triennial This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

1/14/2019 1:31:40 PM

IP 22 Inspection Activity Plan Report Ginna 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Radiation Safety - Airborne 1 1 08/17/2020 08/21/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 50.59 INSPECTION 3 1 09/14/2020 09/18/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments FY2020 GINNA INITIAL OL EXAM 5 1 09/14/2020 09/18/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 10/12/2020 10/23/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Radiation Safety - Dose & PIV 1 1 10/19/2020 10/23/2020 IP 71124.04 000729 Occupational Dose Assessment 1 10/19/2020 10/23/2020 IP 71151 000746 Performance Indicator Verification PROGRAM INSPECTION 3 1 11/02/2020 11/06/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1 11/16/2020 11/20/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

Ginna Requal Inspection with P/F Results 2 1 12/14/2020 12/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

1 12/14/2020 12/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

1/14/2019 1:31:40 PM